Grant Details
Aquatic Invasives Control
Date
4/1/2008
Waters Involved
Big Sand Lake
Status
Complete
Big Sand Lake Property Owners Association: Big Sand Lake Restoration/Ewm Control: Big Sand Lake Property Owners Association is sponsoring an AIS ACEI grant on Big Sand Lake in Vilas County to be completed by December 31, 2008. This is a five year project that will focus on EWM management, and AIS education, prevention and monitoring. The Association will submit future ACEI grants as needed to continue the five year project. The goal is to have an 80% reduction on the EWM acreage and frequency of occurrence within vegetated areas of the Point-Intercept survey. This will allow Big Sand Lake Property Owners Association to continue management of AIS with minimal state financial assistance.
Project activities include: 1) Annual manual removal and chemical treatments of EWM; 2) Annual Pre and Post treatment monitoring and analysis; 3) Annual curly-leaf pondweed assessment; 4) Conduct chemical residual and DO monitoring; 5) Annual volunteer AIS and water quality monitoring; 6) Clean EWM fragments from boat landing; 7) AIS educational and partnering activities; 8) Recruit volunteers and implement a CB/CW program; 9) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 10) Develop annual project report and a final report.
Project deliverables include: 1) Chemical and manual control of EWM; 2) Pre and post treatment and curly-leaf pondweed survey data; 3) Completed entry of inspection 3200-120 and monitoring forms onto Dept website; 4) AIS educational, prevention and monitoring activities; 5) Water quality, residual and DO monitoring data; 6) Final report summarizing EWM management during project and future EWM management suggestions, CB/CW activities, AIS monitoring and AIS educational activities.
Specific Conditions for this project: Final report needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, and samples of educational and outreach products.
Grant Details
Aquatic Invasives Control
Date
4/1/2010
Waters Involved
Big Sand Lake
Status
Complete
Big Sand Lake Property Owners Association: Big Sand Ais Control & Prevention Project: Big Sand Lake Association, Inc. is sponsoring an AIS ACEI grant on Big Sand Lake in Vilas County. This is the second grant encumbered (funding years 3 and 4) to help fund a five year project that will focus on EWM management, and AIS education, prevention and monitoring. The Association will submit future ACEI grants as needed to continue the five year project. The goal is to have an 80% reduction on the EWM acreage and frequency of occurrence within vegetated areas of the Point-Intercept survey. This will allow Big Sand Lake Property Owners Association to continue management of AIS with minimal state financial assistance.
Project activities include: 1) Annual manual removal and chemical treatments of EWM; 2) Annual Pre and Post treatment monitoring and analysis; 3) Annual curly-leaf pondweed assessment; 4) Conduct chemical residual and DO monitoring; 5) Annual volunteer AIS, water quality and residual monitoring; 5) Clean EWM fragments from boat landing; 6) AIS educational and partnering activities; 7) Recruit volunteers and implement a CB/CW program; 8) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 9) Develop annual project report and a final report.
Project deliverables include: 1) Chemical and manual control of EWM; 2) Pre and post treatment and curly-leaf pondweed survey data; 3) Completed entry of inspection 3200-120 and monitoring forms onto Dept website; 4) AIS educational, prevention and monitoring activities; 5) Water quality, residual and DO monitoring data; 6) Final report summarizing EWM management during project and future EWM management suggestions, CB/CW activities, AIS monitoring and AIS educational activities.
Specific Conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, and samples of educational and outreach products.
Grant Details
Aquatic Invasives Control
Date
3/15/2024
Waters Involved
Big Sand Lake
Status
Complete
Big Sand Lake Property Owners Association: Big Sand Lake 2024-2025 Ewm Management & Monitoring Project: Project Scope
The Big Sand Lake Property Owners Association (BSLPOA) is sponsoring a project to conduct trial EWM spot treatments to address large and dense EWM colonies in the high traffic boat landing area. This project monitors the efficacy and native plant selectivity for two summers post treatment.
Activities: 1) Conduct pretreatment confirmation and refinement surveys of the herbicide treatment areas. 2) Conduct quantitative monitoring of the 2024 herbicide treatment using sub-sample PI surveys. 3) Complete late-season EWM mapping survey. 4) Create annual project reports.
Deliverables: 1) Following the pretreatment confirmation and refinement surveys, an email-style report with map(s) of the survey results and finalized treatment plan would be provided to the BSLPOA, WDNR, and other project partners for review prior to the treatment. 2) Annual AIS Monitoring and Control Strategy Assessment Report; the 2024 and 2025 reports will include cumulative data collected under this overall 3-yr project.
Conditions: 1) All monitoring shall follow DNR protocols.
This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.
If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.
Also see B. Special Conditions below.
Grant Details
Aquatic Invasives Control
Date
10/1/2007
Waters Involved
Deerskin River
Status
Complete
Long Lake Of Phelps Lake District: Long Lake Ais 5 Year Control Plan: Long Lake District is sponsoring an AIS ACEI grant on Long Lake in Vilas County to be completed by December 31, 2012. This is a five year project that will focus on EWM management, and AIS education, prevention and monitoring. The goal is to reduce the treatable EWM to less than 10 acres. This will allow the Long Lake District to continue management of AIS on their own.
Project activities include:
1) Annual chemical treatments of EWM
2) Manual removal of EWM as an experimental EWM control technique
3) Annual Pre and Post treatment monitoring and analysis
4) Annual volunteer AIS monitoring
5) Recruit volunteers and implement a CB/CW program
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Point-intercept aquatic plant survey with 2 sets of vouchers
8) Develop annual project report and an updated APM plan
Project deliverables include:
1) Chemical and manual removal control of EWM
2) Pre and post treatment and point-intercept survey data
3) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
4) AIS educational, prevention and monitoring activities
5) An updated APM plan summarizing EWM management during project and future EWM management direction, CB/CW activities, AIS monitoring and AIS educational activities
Specific Conditions for this project:
- Updated APM plan needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of updated APM plan, all annual reports, pre and post treatment and point-intercept survey data, and samples of educational and outreach products.
Grant Details
Aquatic Invasives Control
Date
10/1/2009
Waters Involved
Deerskin River
Status
Complete
Long Lake Of Phelps Lake District: Long Lake Of Phelps Lake District Ais Control Grant Stage Two: Long Lake District is sponsoring a project that will focus on EWM management, AIS education, prevention and monitoring. The goal is to reduce the treatable EWM to less than 10 acres, which will allow the Long Lake District to continue management of AIS with minimal state assistance. This project was partially funded under grant ACEI-031-08 and this grant is a continuation of the same project.
Project activities include: 1) Annual chemical treatments and manual removal of EWM; 2) Annual pre/post treatment monitoring and analysis; 3) Annual volunteer AIS monitoring; 4) Install innovative signage at boat landing; 5) Implement a CB/CW program using volunteers and a paid inspector; 6) Entry of inspection and monitoring forms onto Dept website; 7) Point-intercept (PI) aquatic plant survey and community mapping; 8) Develop annual project report and an updated APM plan.
Project deliverables include: 1) Chemical and manual removal control of EWM; 2) Pre/post treatment, PI survey and community mapping data; 3) Innovative signage and 200 hours of annual inspection time; 4) Completed entry of inspection and monitoring forms onto Dept website; 5) AIS educational, prevention and monitoring activities; 6) Annual reports and an updated APM plan summarizing EWM management during project, future EWM management direction, CB/CW activities, AIS monitoring and AIS educational activities.
Specific Conditions for this project: Updated APM plan needs Dept review and approval
WDNR Lake Coordinator will be provided with an electronic (pdf or word) and hard copy of updated APM plan, all annual reports, all maps, all GIS, survey data (pre/post treatment and PI), and samples of educational and outreach products.
Grant Details
Aquatic Invasives Control
Date
4/1/2013
Waters Involved
Deerskin River
Status
Complete
Long Lake Of Phelps Lake District: Long Lake Ais Control & Prevention Project: 2013 - 2017: Long Lake of Phelps Lake District is sponsoring an ACEI grant on Long Lake, in Vilas County. This project will focus on annual EWM management in Long Lake and also update the Long Lake Management Plan (LMP).
Project activities include: 1) Annual chemical treatments and manual removal of EWM; 2) Annual pre/post treatment monitoring and analysis; 3) Annual volunteer AIS and herbicide concentration monitoring; 4) Implement volunteer boat washing by handing out boat wash tokens; 5) Conduct volunteer and paid watercraft inspections; 6) Entry of inspection and monitoring data onto SWIMS; 7) Point-intercept (PI) aquatic plant survey and community mapping; 8) Develop annual project report and an updated LMP plan.
Project deliverables include: 1) Chemical and manual removal of EWM; 2) Pre/post treatment, PI survey and community mapping data; 3) Entered inspection and monitoring data onto SWIMS; 4) AIS educational, prevention and monitoring activities; 5) Annual reports and an updated LMP plan summarizing EWM management during project and future EWM management direction, boat washing activities, inspection activities, AIS monitoring and AIS educational activities.
Specific Conditions for this project: Updated LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of updated LMP, all annual reports, all maps, all GIS, survey data (pre/post treatment and PI), and samples of educational and outreach products.
Grant Details
Aquatic Invasives Control
Date
3/15/2021
Waters Involved
Deerskin River
Status
Complete
Long Lake Of Phelps Lake District: Long Lake Of Phelps Surface Water Protection Program: Project Scope and Description of Deliverables
The Long Lake of Phelps Lake District is sponsoring an ACEI grant to be completed by December 31, 2021. The focus of the project will be removal of Eurasian water milfoil (EWM).
Project final deliverables include:
1. CBCW data entered into SWIMS
2. Documentation of public outreach
3. Annual AIS monitoring and control reports
4. Final report summarizing AIS mgmt. and results, along with future monitoring/mgmt. suggestions
Specific project activities include:
1. Late-season mapping and Sub-PI survey in 2021
2. Integrated pest mgmt. for EWM removal via DASH
3. CBCW efforts
Special Conditions: WDNR lakes biologist will be provided with an electronic copy of final report, GPS mapping, plant survey data prior to submission of grantee\2019s final payment request.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Aquatic Invasives Control
Date
10/1/2007
Waters Involved
Long Lake
Status
Complete
Long Lake Of Phelps Lake District: Long Lake Ais 5 Year Control Plan: Long Lake District is sponsoring an AIS ACEI grant on Long Lake in Vilas County to be completed by December 31, 2012. This is a five year project that will focus on EWM management, and AIS education, prevention and monitoring. The goal is to reduce the treatable EWM to less than 10 acres. This will allow the Long Lake District to continue management of AIS on their own.
Project activities include:
1) Annual chemical treatments of EWM
2) Manual removal of EWM as an experimental EWM control technique
3) Annual Pre and Post treatment monitoring and analysis
4) Annual volunteer AIS monitoring
5) Recruit volunteers and implement a CB/CW program
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Point-intercept aquatic plant survey with 2 sets of vouchers
8) Develop annual project report and an updated APM plan
Project deliverables include:
1) Chemical and manual removal control of EWM
2) Pre and post treatment and point-intercept survey data
3) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
4) AIS educational, prevention and monitoring activities
5) An updated APM plan summarizing EWM management during project and future EWM management direction, CB/CW activities, AIS monitoring and AIS educational activities
Specific Conditions for this project:
- Updated APM plan needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of updated APM plan, all annual reports, pre and post treatment and point-intercept survey data, and samples of educational and outreach products.
Grant Details
Aquatic Invasives Control
Date
4/1/2013
Waters Involved
Long Lake
Status
Complete
Long Lake Of Phelps Lake District: Long Lake Ais Control & Prevention Project: 2013 - 2017: Long Lake of Phelps Lake District is sponsoring an ACEI grant on Long Lake, in Vilas County. This project will focus on annual EWM management in Long Lake and also update the Long Lake Management Plan (LMP).
Project activities include: 1) Annual chemical treatments and manual removal of EWM; 2) Annual pre/post treatment monitoring and analysis; 3) Annual volunteer AIS and herbicide concentration monitoring; 4) Implement volunteer boat washing by handing out boat wash tokens; 5) Conduct volunteer and paid watercraft inspections; 6) Entry of inspection and monitoring data onto SWIMS; 7) Point-intercept (PI) aquatic plant survey and community mapping; 8) Develop annual project report and an updated LMP plan.
Project deliverables include: 1) Chemical and manual removal of EWM; 2) Pre/post treatment, PI survey and community mapping data; 3) Entered inspection and monitoring data onto SWIMS; 4) AIS educational, prevention and monitoring activities; 5) Annual reports and an updated LMP plan summarizing EWM management during project and future EWM management direction, boat washing activities, inspection activities, AIS monitoring and AIS educational activities.
Specific Conditions for this project: Updated LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of updated LMP, all annual reports, all maps, all GIS, survey data (pre/post treatment and PI), and samples of educational and outreach products.
Grant Details
Aquatic Invasives Control
Date
3/15/2021
Waters Involved
Long Lake
Status
Complete
Long Lake Of Phelps Lake District: Long Lake Of Phelps Surface Water Protection Program: Project Scope and Description of Deliverables
The Long Lake of Phelps Lake District is sponsoring an ACEI grant to be completed by December 31, 2021. The focus of the project will be removal of Eurasian water milfoil (EWM).
Project final deliverables include:
1. CBCW data entered into SWIMS
2. Documentation of public outreach
3. Annual AIS monitoring and control reports
4. Final report summarizing AIS mgmt. and results, along with future monitoring/mgmt. suggestions
Specific project activities include:
1. Late-season mapping and Sub-PI survey in 2021
2. Integrated pest mgmt. for EWM removal via DASH
3. CBCW efforts
Special Conditions: WDNR lakes biologist will be provided with an electronic copy of final report, GPS mapping, plant survey data prior to submission of grantee\2019s final payment request.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Aquatic Invasives Control
Date
3/15/2021
Waters Involved
Smoky Lake
Status
Complete
Smoky Lake Preservation Association: Smoky Lake Eurasian Watermilfoil Control Project: Project Scope and Description of Deliverables
The Smoky Lake Preservation Association Inc. is sponsoring an ACEI grant to be completed by Dec 31, 2023. The focus will be on removal of Eurasian water milfoil (EWM).
Project final deliverables include:
1. Annual AIS monitoring and control reports, and EWM survey maps
2. Final report summarizing AIS mgmt. and results, along with future monitoring/mgmt. suggestions
3. Water quality and CBCW data entered into SWIMS
4. Proof of refresher training
Specific project activities include:
5. Full PI survey in 2023
6. AIS refresher training
7. EWM/AIS surveys in 2021, 2022, 2023
8. CBCW efforts
Special Conditions: WDNR lakes biologist will be provided with an electronic copy of final report, GPS mapping, plant survey data prior to submission of grantee\2019s final payment request.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Aquatic Invasives Early Detection and Response
Date
4/1/2014
Waters Involved
Smoky Lake
Status
Complete
Town Of Phelps: Smoky Lk Control & Prevention Of Eurasian Watermilfoil Rapid Response Project: The Town of Phelps is sponsoring an Early Detection and Response project focusing on a new discovery of Eurasian Watermilfoil (EWM) in Smokey Lake in Vilas County. The project includes surveying, monitoring, mapping, and hand-pulling of EWM in Smoky Lake.
Project activities include: 1) Conduct annual early-season and mid-late season AIS surveys; 2) Conduct volunteer AIS surveillance monitoring; 3) Control EWM by professional hand-removal and DASH efforts; 4) Conduct watercraft inspections and enter data into SWIMS; 5) Host a project wrap-up meeting; 6) Develop annual maps and report; 7) Develop end of project report.
Project deliverables include: 1) EWM survey data and maps; 2) 100 hours of inspection time and entered data; 3) Annual reports and final report describing the findings of the AIS, hand-pulling efforts, and guidance for continued control actions.
Specific conditions for this project: Annual reports and final report need Dept. review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of reports, all maps, and all aquatic plant and any GIS data.
Grant Details
Aquatic Invasives Early Detection and Response
Date
4/15/2016
Waters Involved
Smoky Lake
Status
Complete
Town Of Phelps: Smoky Lake Eurasian Watermilfoil Control Project, Ph 2: The Town of Phelps is sponsoring an AIRR grant to help fund a project which will focus on surveying, monitoring, mapping, and hand-pulling EWM in Smoky Lake, Vilas County.
Project activities include: 1) Conduct annual early-season and mid-late season AIS surveys; 2) Conduct volunteer AIS surveillance monitoring; 3) Control EWM by volunteer hand-removal, professional hand-removal and DASH efforts; 4) Develop annual maps and report; 5) Develop end of project report.
Project deliverables include: 1) EWM survey data and maps; 2) Annual reports and final report describing the findings of the AIS, hand-pulling efforts, and guidance for continued control actions.
Specific conditions for this project: Annual reports and final report need Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of reports, all maps, and all aquatic plant and any GIS data.
Grant Details
Aquatic Invasives Early Detection and Response
Date
5/1/2018
Waters Involved
Smoky Lake
Status
Complete
Smoky Lake Preservation Association: Smoky Lake Eurasian Watermilfoil Control Project: The Smoky Lake Preservation Corporation is sponsoring an AIRR grant to be completed by December 31, 2019. The project will focus on surveying, monitoring, mapping, and hand-pulling EWM in Smoky Lake, Vilas County.
Project activities include: 1) Conduct annual early-season and mid-late season AIS surveys; 2) Conduct volunteer AIS surveillance monitoring; 3) Control EWM by volunteer hand-removal, professional hand-removal and DASH efforts; 4) Develop annual maps and report; 5) Develop end of project report.
Project deliverables include: 1) EWM survey data and maps; 2) Annual reports and final report describing the findings of the AIS, hand-pulling efforts, and guidance for continued control actions.
Specific conditions for this project: Annual reports and final report need Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of reports, all maps, and all aquatic plant and any GIS data.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Anvil Lake
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Bass Lake
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Beatrice Lake
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
4/1/2014
Waters Involved
Big Sand Lake
Status
Complete
Big Sand Lake Property Owners Association: Big Sand Lake Management Planning Project: Big Sand Lake Property Owners Association is sponsoring an AEPP project to study Big Sand Lake, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Big Sand Lake.
Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, community mapping, substrate mapping); 8) Purchase GPS; 9) Data analysis; 10) Develop LMP.
Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) GPS; 7) LMP.
Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, stakeholder survey, data from PI, shoreland assessment, coarse woody habitat assessment, watershed assessment and water quality sampling, all maps from project, and all GIS data.
Grant Details
Aquatic Invasives Education
Date
3/15/2022
Waters Involved
Big Sand Lake
Status
Complete
Big Sand Lake Property Owners Association: Big Sand Lake 2022 Apm Update - Planning: Project Scope and Deliverables:
Big Sand Lake Property Owners Association is sponsoring a surface water planning project to update their existing aquatic plant management plan.
Specific project activities include: 1) conduct a WIDNR approved Stakeholder Survey, 2) Conduct planning meetings with stakeholders to raise public awareness, gather comments and develop management goals and actions, 3) GIS data management and analysis, 4) general project communications
Project final deliverables include: 1) Stakeholder Survey , 2) documentation of planning and stakeholder meetings, 3) reporting compiled into update of lake management plan ,
Specific conditions: 1) department shall be provided copies of raw data and GIS information for the approved surveys being conducted, 2) any reports would need department review prior to approval and reimbursement, 3) Draft stakeholder survey to be submitted to DNR for review/approval before going to public
The specific objectives, activities, metrics, and deliverables for the listed activities are explicated in the application and supporting materials. This scope summarized proposed work but does not replace or supersede the information presented in those documents.
Grant Details
Aquatic Invasives Education
Date
3/15/2022
Waters Involved
Big Sand Lake
Status
Complete
Big Sand Lake Property Owners Association: Big Sand Lake 2022 Apm Update - Plant Studies: Project Scope and Deliverables
Big Sand Lake Property Owners Association is sponsoring a surface water planning project to update their existing aquatic plant management plan.
Specific project activities include: 1) 2022 aquatic plant point intercept survey, 2) 2022 late season EWM mapping surveys, 3) GIS data management and analysis, 4) general project communications
Project final deliverables include: 1) PI survey data and maps, 2) Late season EWM data and maps, 3) documentation of project communications and any reporting,
Specific conditions: 1) department shall be provided copies of raw data and GIS information for the approved surveys being conducted.
The specific objectives, activities, metrics, and deliverables for the listed activities are explicated in the application and supporting materials. This scope summarized proposed work but does not replace or supersede the information presented in those documents.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Blackjack Creek
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Carpenter Lake
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Catfish Lake
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Cranberry Lake
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Deerskin Lake
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Deerskin River
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
10/1/2006
Waters Involved
Deerskin River
Status
Complete
Long Lake Association Of Vilas County: Aquatic Plant Management Plans: Long Lake Association is sponsoring an Aquatic Invasive Species (AIS) Education, Planning and Prevention grant to be completed by June 30, 2007. Big Sand Lake Property Owners Association is a project partner. The project will focus on developing APM Plans for Long and Big Sand Lakes in Vilas County. Completion of an APM Plan will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.
Project activities include:
1) Review and summarize available aquatic plant survey data from point-intercept surveys completed summer '06.
2) Administer a public questionnaire regarding lake management activities
3) Hold at least 3 meetings throughout project
4) Aquatic plant community mapping and analysis
5) Delineate watershed and land uses
6) Summarize existing water quality information
7) Educational article
8) AIS education and prevention efforts through meetings, article, and APM Plan implementation recommendations
9) Develop APM Plan
Project deliverables include:
1) Educational article and public questionnaire
2) Aquatic plant community and watershed maps
3) APM Plan
Specific conditions for this project:
- A draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plan needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plan, data from watershed and land use analysis, copy of educational article, copy of public questionnaire, and all maps from project.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Dollar Lake
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Duck Lake
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Eagle Lake
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Eagle River
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
East Branch Blackjack Creek
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Finger Lake
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Harmony Lake
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
10/1/2006
Waters Involved
Long Lake
Status
Complete
Long Lake Association Of Vilas County: Aquatic Plant Management Plans: Long Lake Association is sponsoring an Aquatic Invasive Species (AIS) Education, Planning and Prevention grant to be completed by June 30, 2007. Big Sand Lake Property Owners Association is a project partner. The project will focus on developing APM Plans for Long and Big Sand Lakes in Vilas County. Completion of an APM Plan will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.
Project activities include:
1) Review and summarize available aquatic plant survey data from point-intercept surveys completed summer '06.
2) Administer a public questionnaire regarding lake management activities
3) Hold at least 3 meetings throughout project
4) Aquatic plant community mapping and analysis
5) Delineate watershed and land uses
6) Summarize existing water quality information
7) Educational article
8) AIS education and prevention efforts through meetings, article, and APM Plan implementation recommendations
9) Develop APM Plan
Project deliverables include:
1) Educational article and public questionnaire
2) Aquatic plant community and watershed maps
3) APM Plan
Specific conditions for this project:
- A draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plan needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plan, data from watershed and land use analysis, copy of educational article, copy of public questionnaire, and all maps from project.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Lower Ninemile Lake
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Lynx Lake
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Ninemile Creek
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Otter Lake
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Rade Lake
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Scattering Rice Lake
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Spirit Lake
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Spring Meadow Creek
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Sucker Creek Springs
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Tambling Lake
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
10/1/2006
Waters Involved
Thoroughfare Creek
Status
Complete
Long Lake Association Of Vilas County: Aquatic Plant Management Plans: Long Lake Association is sponsoring an Aquatic Invasive Species (AIS) Education, Planning and Prevention grant to be completed by June 30, 2007. Big Sand Lake Property Owners Association is a project partner. The project will focus on developing APM Plans for Long and Big Sand Lakes in Vilas County. Completion of an APM Plan will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.
Project activities include:
1) Review and summarize available aquatic plant survey data from point-intercept surveys completed summer '06.
2) Administer a public questionnaire regarding lake management activities
3) Hold at least 3 meetings throughout project
4) Aquatic plant community mapping and analysis
5) Delineate watershed and land uses
6) Summarize existing water quality information
7) Educational article
8) AIS education and prevention efforts through meetings, article, and APM Plan implementation recommendations
9) Develop APM Plan
Project deliverables include:
1) Educational article and public questionnaire
2) Aquatic plant community and watershed maps
3) APM Plan
Specific conditions for this project:
- A draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plan needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plan, data from watershed and land use analysis, copy of educational article, copy of public questionnaire, and all maps from project.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Tinsel Lake
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Un Spring
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Unnamed
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
10/1/2006
Waters Involved
Unnamed
Status
Complete
Long Lake Association Of Vilas County: Aquatic Plant Management Plans: Long Lake Association is sponsoring an Aquatic Invasive Species (AIS) Education, Planning and Prevention grant to be completed by June 30, 2007. Big Sand Lake Property Owners Association is a project partner. The project will focus on developing APM Plans for Long and Big Sand Lakes in Vilas County. Completion of an APM Plan will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.
Project activities include:
1) Review and summarize available aquatic plant survey data from point-intercept surveys completed summer '06.
2) Administer a public questionnaire regarding lake management activities
3) Hold at least 3 meetings throughout project
4) Aquatic plant community mapping and analysis
5) Delineate watershed and land uses
6) Summarize existing water quality information
7) Educational article
8) AIS education and prevention efforts through meetings, article, and APM Plan implementation recommendations
9) Develop APM Plan
Project deliverables include:
1) Educational article and public questionnaire
2) Aquatic plant community and watershed maps
3) APM Plan
Specific conditions for this project:
- A draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plan needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plan, data from watershed and land use analysis, copy of educational article, copy of public questionnaire, and all maps from project.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Upper Ninemile Lake
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Voyageur Lake
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
West Branch Blackjack Creek
Status
Complete
Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.
Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit
Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)
Specific conditions for this project:
- Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.
Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Big Sand Lake
Status
Complete
Big Sand Lake Property Owners Association: Big Sand Lake Clean Boats Clean Waters 2013: The Big Sand Lake Property Owners Association is sponsoring a Clean Boats Clean Water project at one public boat landing on Sand Lake for 2013.
Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Big Sand Lake
Status
Complete
Big Sand Lake Property Owners Association: Big Sand Lake Clean Boats Clean Waters Project 2014: Big Sand Lake Property Owners Association will sponser a Clean Boats Clean Water landing inspection program at 1 public access in 2014.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Big Sand Lake
Status
Complete
Big Sand Lake Property Owners Association: Big Sand Lake 2015 Clean Boats Clean Waters Project: The Big Sand Lake Property Owners Association is sponsoring a Clean Boats Clean Waters program on Big Sand Lake in 2015 which includes 1 public landing.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Big Sand Lake
Status
Complete
Big Sand Lake Property Owners Association: Big Sand Lake Property Owners Association: The Big Sand Lake Property Owners Association is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Big Sand Lake.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Big Sand Lake
Status
Complete
Big Sand Lake Property Owners Association: Big Sand Lake Property Owners Association 2017 Cbcw: Big Sand Lake Property Owners Association is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on BIG SAND LAKE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2018
Waters Involved
Big Sand Lake
Status
Complete
Big Sand Lake Property Owners Association: Big Sand Lake Property Owners Association 2018 Cbcw: Big Sand Lake Property Owners Association is sponsoring a Clean Boats Clean Waters project in 2018 at 1 single public boat landings and 0 public boat landing pairs on BIG SAND LAKE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Big Sand Lake
Status
Complete
Big Sand Lake Property Owners Association: Big Sand Lake Property Owners Association 2019 Cbcw: Big Sand Lake Property Owners Association is sponsoring a Clean Boats Clean Waters project in 2019 at 1 single public boat landings and 0 public boat landing pairs on BIG SAND (BOAT LDG, N/A).
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Big Sand Lake
Status
Complete
Big Sand Lake Property Owners Association: Big Sand Lake Property Owners Association 2020 Cbcw: Big Sand Lake Property Owners Association is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 0 public boat landing pairs on BIG SAND (BOAT LANDING).
Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Deerskin Lake
Status
Complete
Deerskin Lake Association: Deerskin Lake Clean Boats Clean Waters 2013: The Deerskin Lake Association will sponsor a Clean Boats Clean Waters landing inspection program for 2013 on one public boat landing.
Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Deerskin Lake
Status
Complete
Deerskin Lake Association: Deerskin Lake Clean Boats Clean Waters Project 2014: Deerskin Lake Association will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2014.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Deerskin Lake
Status
Complete
Deerskin Lake Association: Deerskin Lake 2015 Clean Boats Clean Waters Project: The Deerskin Lake Association is sponsoring a Clean Boats Clean Waters project in 2015 at one public boat landing on Deerskin Lake.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Deerskin Lake
Status
Complete
Deerskin Lake Association: Deerskin Lake Association 2016 Clean Boats Clean Waters: The Deerskin Lake Association is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Deerskin Lake.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Deerskin Lake
Status
Complete
Deerskin Lake Association: Deerskin Lake Association 2017 Cbcw: Deerskin Lake Association is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on DEERSKIN LAKE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2018
Waters Involved
Deerskin Lake
Status
Complete
Deerskin Lake Association: Deerskin Lake Association 2018 Cbcw: Deerskin Lake Association is sponsoring a Clean Boats Clean Waters project in 2018 at 1 single public boat landings and 0 public boat landing pairs on DEERSKIN LAKE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Deerskin Lake
Status
Complete
Deerskin Lake Association: Deerskin Lake Association 2019 Cbcw: Deerskin Lake Association is sponsoring a Clean Boats Clean Waters project in 2019 at 1 single public boat landings and 0 public boat landing pairs on DEERSKIN LAKE (EAST SIDE LANDING, N/A).
Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Deerskin River
Status
Complete
Long Lake Of Phelps Lake District: Long Lake Of Phelps Clean Boats Clean Waters 2013: The Long Lake of Phelps Lake District will sponsor a Clean Boats Clean Waters landing inspection program for 2013 on one public boat landing.
Grant Details
Clean Boats, Clean Waters
Date
4/13/2014
Waters Involved
Deerskin River
Status
Complete
Long Lake Of Phelps Lake District: Long Lake Clean Boats Clean Waters Project 2014: Long Lake of Phelps Lake District will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2014.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Deerskin River
Status
Complete
Long Lake Of Phelps Lake District: Long Lake Clean Boats Clean Waters Project 2015: Long Lake Of Phelps Lake District will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2015
Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Deerskin River
Status
Complete
Long Lake Of Phelps Lake District: Long Lake Of Phelps Lake District 2016 Clean Boats Clean Waters: The Long Lake of Phelps Lake District is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Long Lake.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Deerskin River
Status
Complete
Long Lake Of Phelps Lake District: Long Lake Of Phelps Lake District 2017 Cbcw: Long Lake Of Phelps Lake District is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on LONG LAKE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2018
Waters Involved
Deerskin River
Status
Complete
Long Lake Of Phelps Lake District: Long Lake Of Phelps Lake District 2018 Cbcw: Long Lake Of Phelps Lake District is sponsoring a Clean Boats Clean Waters project in 2018 at 1 single public boat landings and 0 public boat landing pairs on LONG LAKE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Deerskin River
Status
Complete
Long Lake Of Phelps Lake District: Long Lake Of Phelps Lake District 2020 Cbcw: Long Lake Of Phelps Lake District is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 0 public boat landing pairs on LONG LAKE (LONG LAKE, N/A).
Grant Details
Clean Boats, Clean Waters
Date
2/15/2021
Waters Involved
Deerskin River
Status
Complete
Long Lake Of Phelps Lake District: Long Lake Of Phelps Lake District 2021 Cbcw: Long Lake Of Phelps Lake District is sponsoring a Clean Boats Clean Waters project in 2021 at 1 single public boat landings and 0 public boat landing pairs on LONG LAKE (LONG LAKE, N/A).
Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Long Lake
Status
Complete
Long Lake Of Phelps Lake District: Long Lake Of Phelps Clean Boats Clean Waters 2013: The Long Lake of Phelps Lake District will sponsor a Clean Boats Clean Waters landing inspection program for 2013 on one public boat landing.
Grant Details
Clean Boats, Clean Waters
Date
4/13/2014
Waters Involved
Long Lake
Status
Complete
Long Lake Of Phelps Lake District: Long Lake Clean Boats Clean Waters Project 2014: Long Lake of Phelps Lake District will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2014.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Long Lake
Status
Complete
Long Lake Of Phelps Lake District: Long Lake Clean Boats Clean Waters Project 2015: Long Lake Of Phelps Lake District will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2015
Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Long Lake
Status
Complete
Long Lake Of Phelps Lake District: Long Lake Of Phelps Lake District 2016 Clean Boats Clean Waters: The Long Lake of Phelps Lake District is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Long Lake.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Long Lake
Status
Complete
Long Lake Of Phelps Lake District: Long Lake Of Phelps Lake District 2017 Cbcw: Long Lake Of Phelps Lake District is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on LONG LAKE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2018
Waters Involved
Long Lake
Status
Complete
Long Lake Of Phelps Lake District: Long Lake Of Phelps Lake District 2018 Cbcw: Long Lake Of Phelps Lake District is sponsoring a Clean Boats Clean Waters project in 2018 at 1 single public boat landings and 0 public boat landing pairs on LONG LAKE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Long Lake
Status
Complete
Long Lake Of Phelps Lake District: Long Lake Of Phelps Lake District 2020 Cbcw: Long Lake Of Phelps Lake District is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 0 public boat landing pairs on LONG LAKE (LONG LAKE, N/A).
Grant Details
Clean Boats, Clean Waters
Date
2/15/2021
Waters Involved
Long Lake
Status
Complete
Long Lake Of Phelps Lake District: Long Lake Of Phelps Lake District 2021 Cbcw: Long Lake Of Phelps Lake District is sponsoring a Clean Boats Clean Waters project in 2021 at 1 single public boat landings and 0 public boat landing pairs on LONG LAKE (LONG LAKE, N/A).
Grant Details
Clean Boats, Clean Waters
Date
2/15/2018
Waters Involved
Smoky Lake
Status
Complete
Smoky Lake Preservation Association: Smoky Lake Preservation Association 2018 Cbcw: Smoky Lake Preservation Association is sponsoring a Clean Boats Clean Waters project in 2018 at 1 single public boat landings and 0 public boat landing pairs on SMOKY LAKE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Smoky Lake
Status
Complete
Smoky Lake Preservation Association: Smoky Lake Preservation Association 2019 Cbcw: Smoky Lake Preservation Association is sponsoring a Clean Boats Clean Waters project in 2019 at 1 single public boat landings and 0 public boat landing pairs on SMOKY LAKE (HWY 17 LANDING, N/A).
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Smoky Lake
Status
Complete
Smoky Lake Preservation Association: Smoky Lake Preservation Association 2020 Cbcw: Smoky Lake Preservation Association is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 0 public boat landing pairs on SMOKY LAKE (HWY 17 LANDING, N/A).
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Alder Lake
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Anvil Lake
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Bass Lake
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Beatrice Lake
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Benson Lake
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Blackjack Creek
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Bolin Lake
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Carpenter Lake
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Catfish Lake
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Chub Lake
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Circle Lily Lake
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Clear Lake
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Cranberry Lake
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Crane Lake
Status
Complete
Pickerel/Crane Lake Prot & Rehab District: Acq-Pickerel/Crane Lake Property Acquisition: The Pickerel/Crane Lake P&R District has purchased a 46.7 acre parcel of land in the Town of Nashville, Forest County. The property includes 300 feet of frontage on Crane Lake, approximately 33 acres of wetland, an artesian spring, a pond and stream, and several acres of upland. The property will be managed in accordance with the Property Management Plan as outlined in the Land Management Plan attached to the Project Application (Form 8700-283) for this Lake Protection Grant.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Dead Pike Lake
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Deerfoot Lake
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Deerskin Lake
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Deerskin River
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Dog Lake
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Dollar Lake
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Duck Lake
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Eagle Lake
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Eagle River
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
East Branch Blackjack Creek
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Fawn Lake
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Finger Lake
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Gem Lake
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Harmony Lake
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Homestead Lake
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Island Lake
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Kentuck Lake
Status
Complete
Kentuck Lake P&R District: Lmi-Df-Kentuck Lake Plan Implementation: Water Quality & Ais: Kentuck Lake P&R District is sponsoring a lake protection grant to further assess water quality and manage AIS in Kentuck Lake, in Vilas County.
Project activities include: 1) In-lake water quality assessment; 2) Groundwater assessment; 3) Sediment core collection; 4) EWM and CLP monitoring and mapping; 5) Stakeholder participation planning meeting; 6) Purchase LDO probe; 7) Develop annual report and final report.
Project deliverables include: 1) In-lake, groundwater and sediment core data; 2) EWM and CLP data and mapping; 3) LDO probe; 4) Annual summary and final report.
Specific conditions for this project: Annual summary and final report need Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of annual summary, final report, all maps, data and GIS from project.
Grant Details
Lake Protection Grant
Date
9/1/2000
Waters Involved
Little Saint Germain Lake
Status
Complete
Little St Germain Lake P & R District: Res- L. St. Germain Lake Aeration & Phosphorus Removal Engineering: The Little St. Germain Lake Protection and Rehabilitation District is sponsoring a project involving the installation of two lake aerators for improvement of the winter lake dissolved oxygen levels, development of a preliminary engineering work scope for reduction of phosphorus loading to Little St. Germain Lake, and monitoring of inlake water chemistry, Muskellunge Creek monitoring, and groungwater monitoring to be conducted by the USGS.
Project deliverables for this grant project will be:
USGS report including data from the continued trend monitoring, phosphorus loading data from Muskellunge Creek, sources of phosphorus to Muskellunge Creek, groundwater phosphorus contribution, pre and post aeration system installation oxygen monitoring, an updated lake water and phosphorus budget, and an evaluation of the effectiveness of the aeration system.
A final report from Foth &Van Dyke will include a feasibility study for reduction of the phosphorus loading to Little St. Germain, preliminary engineering of chemical phosphorus removal and cost projections.
Specific conditions for this project include:
* The installation of all stream gauging stations and lake aeration equipment must receive the approval and/or permit from the Department of Natural Resources water regulation section.
The Department of Natural Resources will be provided with electronic and paper copies of the final report of this project.
Grant Details
Lake Protection Grant
Date
10/1/2009
Waters Involved
Little Saint Germain Lake
Status
Complete
Little St Germain Lake P & R District: Res-Restoring Shoreline Habitat On Lt. Saint Germain Lake: Little St. Germain Lake P&R District is sponsoring a project focused on restoring 500 meters of shoreline on Lt. St. Germain Lake. Partners include the USGS, VCLA, Vilas Co. LWCD, UW Ext., WDATCP, MI Tech Univ., & WDNR.
Activities include: 1) native vegetation restoration of 500 meters of shoreline & > 4000 sq. meters of lakeshore buffer; 2) terrestrial & aquatic invasives survey & treatment/removal on restored area; 3) evaluate ecological benefits of buffer restoration for wildlife & fish pops.; 4) assess feasibility of using project to conduct experiments to quantify benifits of buffer re-establishment to reduce nutrient runoff; 5) conduct experiments to develop BMP's for shoreland restoration in the Upper Wisc. River Watershed & Northern Highlands Ecological Landscape; 6) removal, replacement of retaining walls, impervious surfaces within buffer; installation of BMPs for runoff control; 7) repair shoreland erosion w/ biologically degradable materials; 8) tree drops & aquatic macrophyte bed establishment; 9) demo. & education activities including lake ecology workshops, meetings, pamphlets & newsletters; 10) implement pollinator response surveys; 11) final report summarizing project activities including restortaion before & after photos.
Deliverables: 1) 500 meters of restoration & >4000 sq. meters of buffer area; 2) invasives control; 3) installation of BMP's & erosion control measures; 4) habitat improvements (tree drops & macrophyte bed); 5) completed workshops, pamphlets & newsletters; 6) final report (w/ BMP's & nutrient run-off component).
Specific conditions: Shoreling habitat restorations require perpetual deed restrictions; final report needs Dept. review & approval.
Lake Mgt. Coor will be provided with electronic (pdf or word) & hard copy of final report & copeis of pamphlets & newsletters.
Grant Details
Lake Protection Grant
Date
10/1/2009
Waters Involved
Little St Germain Creek
Status
Complete
Little St Germain Lake P & R District: Res-Restoring Shoreline Habitat On Lt. Saint Germain Lake: Little St. Germain Lake P&R District is sponsoring a project focused on restoring 500 meters of shoreline on Lt. St. Germain Lake. Partners include the USGS, VCLA, Vilas Co. LWCD, UW Ext., WDATCP, MI Tech Univ., & WDNR.
Activities include: 1) native vegetation restoration of 500 meters of shoreline & > 4000 sq. meters of lakeshore buffer; 2) terrestrial & aquatic invasives survey & treatment/removal on restored area; 3) evaluate ecological benefits of buffer restoration for wildlife & fish pops.; 4) assess feasibility of using project to conduct experiments to quantify benifits of buffer re-establishment to reduce nutrient runoff; 5) conduct experiments to develop BMP's for shoreland restoration in the Upper Wisc. River Watershed & Northern Highlands Ecological Landscape; 6) removal, replacement of retaining walls, impervious surfaces within buffer; installation of BMPs for runoff control; 7) repair shoreland erosion w/ biologically degradable materials; 8) tree drops & aquatic macrophyte bed establishment; 9) demo. & education activities including lake ecology workshops, meetings, pamphlets & newsletters; 10) implement pollinator response surveys; 11) final report summarizing project activities including restortaion before & after photos.
Deliverables: 1) 500 meters of restoration & >4000 sq. meters of buffer area; 2) invasives control; 3) installation of BMP's & erosion control measures; 4) habitat improvements (tree drops & macrophyte bed); 5) completed workshops, pamphlets & newsletters; 6) final report (w/ BMP's & nutrient run-off component).
Specific conditions: Shoreling habitat restorations require perpetual deed restrictions; final report needs Dept. review & approval.
Lake Mgt. Coor will be provided with electronic (pdf or word) & hard copy of final report & copeis of pamphlets & newsletters.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Little Star Lake
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Little Trout Lake
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Lower Ninemile Lake
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lower Post Lake
Status
Complete
Post Lakes P & R District: Natural Shoreland & Habitat Project: This project will implement one of the recommendations of the Post Lakes Management Plan. The project will include development of a long-term project to support and encourage shoreland buffers and restoration of shoreland properties. The project also includes the restoration of 6 lots as education demonstration sites.
Deliverables include:
1. Development of a Natural Shorelands and Habitat Committee including DNR and County representatives to guide the development of a pilot project.
2. Development of a long-term project guide including training of volunteers to complete site assessments and an education plan.
3. Site analysis and design for 6 parcels including restoration of these sites.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Lynx Lake
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Manitowish Lake
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
McCabe Lake
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
McKinney Lake
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Metonga Lake
Status
Complete
Sokaogon Chippewa Community: Zebra Mussel Df Study: This project will continue the study and assessment of the impacts of zebra mussels on Lake Metonga. Specially, water chemistry, phytoplankton, zooplankton, zebra mussels, crayfish, walleye and yellow perch will be studied. The objective of this study is to gain information about the changes within the ecosystem and possible management options.
Deliverables include:
1. An annual progress report
2. A Final report including results, any management recommendations that can be determined from the available data, scientific literature review, summary of methods, results and discussion. The report will include both summarized and raw data.
3. This report will be made public within the community and will be provided to the Department in both hard and electronic copies.
Grant Details
Lake Protection Grant
Date
9/1/2008
Waters Involved
Moon Lake
Status
Complete
Alma-Moon Lake P & R District: Res-Restoring Shoreline Habitat On Moon Lake: Alma/Moon Lake P&R District is sponsoring a project focusing on restoring 1500 feet of shoreline on Moon Lake as part of a WDNR Science Services Lakeshore Restoration Research Project. Partners include UCC Moon Beach Camp, Michigan Technical University and WDNR.
Project activities include: 1) Native vegetation restoration of 1500 feet of shoreline & >4000 square meters of lakeshore buffer area; 2) Survey of restoration area for terrestrial & aquatic invasives - all encountered will be treated &/or removed; 3) Install & maintain an 8' fence & 3' hardware cloth for 3-4 years for site protection from deer & snowshoe hares; 4) Install rain gardens along areas of significant run-off; 5) Install enviro-lock biodegradable bags along areas of significant erosion; 6) 4-6 trees will be dropped & establishment of an aquatic macrophyte bed in the restoration area; 7) Shoreline restoration demonstration & education activities including lake ecology workshops, creating pamphlets, hand-outs & video DVD's, signage, brochures, & an updated Moon Beach website detailing project progress; 8) Final report summarizing project activities, including before and after photographs of restored areas.
Project deliverables include: 1)1500 feet of restored shoreline and >4000 square meters of lakeshore buffer area; 2) Treatment &/or removal of invasive species; 3) Installed rain gardens and erosion control measures; 4) Habitat improvements (tree drops and macrophyte bed); 5) Completed workshops, pamphlets, hand-outs, video DVD's, signage, brochures, and website updates; 6) Final report.
Specific Conditionst: Shoreland habitat restorations require perpetual deed restrictions; Final report needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, and copies of pamphlets, brochures, hand-outs, and DVD's and any established protocols for tree drops and aquatic macrophyte bed establishment.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Ninemile Creek
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Otter Lake
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Pickerel Lake
Status
Complete
Pickerel/Crane Lake Prot & Rehab District: Res-Pickerell Lake Aeration System: The project will install an aeration system, monitor Dissolved Oxygen throughout the winter, and provide education on sources of nutrient loading into Pickerel Lake. The project will also include an education effort for safety of open water and sources of the problem which have lead to the need for lake aeration.
All required permits will be received prior to equipment installation.
Specific deliverables for this grant project include a final report describing project accomplishments.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Pier Lake
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Rade Lake
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Rest Lake
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Scattering Rice Lake
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Sherman Lake
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Spider Lake
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Spirit Lake
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Spring Meadow Creek
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Statehouse Lake
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Stepping Stone Lake Number 1
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Stepping Stone Lake Number 2
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Stepping Stone Lake Number 3
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Stone Lake
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Sturgeon Lake
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Sucker Creek Springs
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Tambling Lake
Status
Complete
Tambling Lake Association, Inc.: Res-Tambling Lake Aeration System: The Tambling Lake Association, Inc. will sponsor a project for the installation of one aeration system. The DNR will be provided with a written summary of the work completed under this grant and photographs.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Tambling Lake
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Tinsel Lake
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
2/14/1996
Waters Involved
Torch Lake
Status
Complete
Vilas County: Acq-Torch Lake Land Acquisition - Crist Property: Vilas County will acquire 60 acres of land with frontage on Torch Lake and the Wisconsin River for lake protection and public outdoor recreation purposes. Eligible costs are outlined on the attached Cost Estimate Worksheet. PER SPONSOR: PROJECT FELL THROUGH; GRANT AWARD WITHDRAWN.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Un Spring
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Un Spring
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Unnamed
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Unnamed
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Unnamed
Status
Complete
Kentuck Lake P&R District: Lmi-Df-Kentuck Lake Plan Implementation: Water Quality & Ais: Kentuck Lake P&R District is sponsoring a lake protection grant to further assess water quality and manage AIS in Kentuck Lake, in Vilas County.
Project activities include: 1) In-lake water quality assessment; 2) Groundwater assessment; 3) Sediment core collection; 4) EWM and CLP monitoring and mapping; 5) Stakeholder participation planning meeting; 6) Purchase LDO probe; 7) Develop annual report and final report.
Project deliverables include: 1) In-lake, groundwater and sediment core data; 2) EWM and CLP data and mapping; 3) LDO probe; 4) Annual summary and final report.
Specific conditions for this project: Annual summary and final report need Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of annual summary, final report, all maps, data and GIS from project.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Upper Ninemile Lake
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Vance Lake
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Voyageur Lake
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
West Branch Blackjack Creek
Status
Complete
Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).
Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.
Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.
Specific Conditions for this project: Reports and LMP need Dept. review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Wild Rice Lake
Status
Complete
Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.
Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Afterglow Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Afterglow Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Baker Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Baker Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1996
Waters Involved
Big Sand Lake
Status
Complete
Big Sand Lake Property Owners Association: Big Sand Lake Eurasian Watermilfoil Weevil Study: The Big Sand Lake Property Owners Association proposes to evaluate the effect of the supplemental enhancement of weevil populations as a selective aquatic plant management technique to control Myriophyllum spicatum. Project activities will result in a field evalution of experimental weevil stocking, a status report and presentation to the lake group, and a final report including feasibility recommendations. The Department of Natural Resources will be provided with a paper copy and an electronic copy of the final report. Information about the project will be disseminated to the public by fact sheet distribution, public meeting, and summary report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Big Sand Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Big Sand Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Blackjack Springs
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Blackjack Springs
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Camp One Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Camp One Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Camp Two Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Camp Two Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Catherine Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Catherine Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Crystal Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Crystal Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Deerskin Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Deerskin Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Deerskin Lake
Status
Complete
Town Of Washington: Anvil, Boot & Deerskin Lakes Limnological Baseline Studies & Apm Plans: The Town of Washington is sponsoring a large scale lake planning grant to study Anvil, Boot and Deerskin Lakes in Forest and Vilas Counties with a study completion date of June 30, 2008. The Town of Lincoln, Town of Cloverland, and City of Eagle River are project partners. The project will focus on developing an Aquatic Plant Mangement (APM) Plan for each lake.
Project activities include:
1) Data review, project kick-off meeting and project final meeting
2) Develop public questionnaire and prepare educational article
3) Point-intercept (PI) survey of aquatic plants with 2 sets of pressed plants from Deerskin Lake
4) Aquatic plant community mapping and analysis
5) Water quality sampling - secchi, P, Chla, and DO through citizen lake monitor and Temp during survey period for Anvil Lake, - secchi, P, and Chla through citizen lake monitor and DO and Temp during aquatic plant sampling for Deerskin Lake - secchi, DO, P, Chla, and Temp during survey period for Boot Lake
6) Watershed and land use analysis
7) Develop APM Plans
Project deliverables include:
1) Public questionnaire and educational article
2) PI data and aquatic plant community and watershed maps
3) 2 sets of pressed aquatic plants from Deerskin Lake (one set for lake group and second for Dept)
4) Water quality sampling results
5) APM Plans
Specific conditions for this project:
- Draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plans needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plans, educational article, public questionnaire, data from watershed and land use analysis, data from PI survey, data from water quality sampling, all maps from project, and a set of pressed aquatic plants from Deerskin Lake.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Dewey Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Dewey Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Eleanore Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Eleanore Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Ellen Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Ellen Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Elvoy Springs
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Elvoy Springs
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Gail Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Gail Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Goodall Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Goodall Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Gross Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Gross Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Imogene Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Imogene Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Jewel Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Jewel Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Kentuck Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Kentuck Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Kildare Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Kildare Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Lac Vieux Desert
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Lac Vieux Desert
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Long Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Long Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Manuel Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Manuel Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Muskeg Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Muskeg Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Norwood Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Norwood Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Noseeum Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Noseeum Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Pickel Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Pickel Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Plymouth Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Plymouth Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Potfish Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Potfish Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Reservoir Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Reservoir Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Robinson Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Robinson Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Secret Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Secret Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Smoky Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Smoky Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
2/15/2017
Waters Involved
Smoky Lake
Status
Complete
Town Of Phelps: Comprehensive Lake Management Planning For Smokey Lake: The Town of Phelps is sponsoring a LPL grant to study Smoky Lake, in Vilas County. The project will focus on developing a Lake Management Plan (LMP).
Project activities include: 1) Citizen participation \2013 stakeholder survey and planning meetings (2-4); 2) Water quality sampling and analysis; 3) Updated bathymetry map; 4) Watershed assessment; 5) Shoreland and Coarse Woody Habitat assessment; 6) Collect and synthesize existing lake data; 7) Aquatic plant surveys (PI survey, community mapping and substrate mapping); 8) Data analysis; 9) Develop LMP.
Project deliverables include: 1) Stakeholder survey and bathymetry map; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland and woody habitat data; 5) Aquatic plant community and AIS maps; 6) Aquatic plant vouchers; 7) LMP.
Specific conditions for this project: 1) Draft of stakeholder survey needs Dept review and approval; 2) Draft of LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, stakeholder survey, bathymetry map, data from PI survey, shoreland assessment, woody habitat assessment, watershed assessment and water quality sampling, all maps from project, all GIS data, and aquatic plant vouchers.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Spectacle Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Spectacle Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Stub Walsh Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Stub Walsh Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Sugar Maple Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Sugar Maple Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Twin Lakes (North)
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Twin Lakes (North)
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Twin Lakes (South)
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Twin Lakes (South)
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Un Spring
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Un Spring
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Unnamed
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Unnamed
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Vista Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Vista Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Warvet Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Warvet Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Weber Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Weber Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Whispering Lake
Status
Complete
Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:
1)Development of maps showing existing land uses within the town.
2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Whispering Lake
Status
Complete
Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Afterglow Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Baker Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Beaver Creek
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Big Sand Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Blackjack Creek
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Blackjack Springs
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Brule Creek
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Camp One Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Camp Two Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Catherine Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Crystal Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Deerskin Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
2/15/2015
Waters Involved
Deerskin Lake
Status
Complete
Deerskin Lake Association: Deerskin Lake Aquatic Plant Studies: Deerskin Lake Association is sponsoring a SPL grant to study Deerskin Lake in Vilas County. The project will focus on studying the aquatic plant community and developing a summary report.
Project activities include: 1) Aquatic plant surveys (PI survey, acoustic, community mapping, substrate mapping); 2) Data analysis; 3) Summary report.
Project deliverables include: 1) PI data; 2) Aquatic plant community and substrate maps; 3) Summary report.
Specific conditions or this project: Draft of summary report needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of summary report and all data and maps from the project.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Deerskin River
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Dewey Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Eleanore Creek
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Eleanore Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Ellen Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Elvoy Creek
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Elvoy Springs
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Gail Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Goodall Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Gross Creek
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Gross Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Haymeadow Creek
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Imogene Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Jewel Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Kentuck Creek
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Kentuck Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Kildare Creek
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Kildare Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Lac Vieux Desert
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Little Deerskin River
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Little Smoky Creek
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Lobischer Creek
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Long Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Manuel Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Military Creek
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Muskeg Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Muskrat Creek
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Norwood Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Noseeum Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Pickel Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Plymouth Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Potfish Creek
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Potfish Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Reservoir Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Robinson Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Secret Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Smoky Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Spectacle Creek
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Spectacle Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Stub Walsh Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Sugar Maple Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Thoroughfare Creek
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Twin Lakes (North)
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Twin Lakes (South)
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Twin River
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Un Spring
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Unnamed
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Vista Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Warvet Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Weber Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Whispering Lake
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Wisconsin River
Status
Complete
Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.
Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.
Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.
Specific conditions for this project: Final report needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
River Planning Grant
Date
7/1/2009
Waters Involved
South Branch Peshtigo River
Status
Complete
Northwoods Land Trust, Inc.: Forest County River Conservation Project: Northwood\2019s Land Trust, Inc. proposes to conduct a direct mail education campaign with all property owners on the priority river and stream segments in Forest County that were identified by the DNR Northern Rivers Initiative. An information packet will be provided highlighting voluntary conservation options those property owners can utilize to protect the priority stream corridors. Those options include conservation easements, land donation, land registry and conservation buyer programs. Individual on site property assessments and conservation planning will be conducted with any landowners who express interest.
The project includes the following goals: 1) Direct mail information packets describing voluntary conservation options private landowners can utilize to protect their properties. This information will include how the options can protect land while also providing income, estate and other tax benefits to landowners. The mailing will include all private property owners with at least 500 feet of natural shoreline on these priority river segments; 2) Conduct on-site follow-up contacts with interested landowners as generated by mailing and media publicity; 3) Encourage interested landowners to voluntarily enter into perpetual land protection agreements or utilize other land protection tools to protect their priority river/stream segments.
Project deliverables include: 1) Copies of color GIS maps of each of the towns with digitized parcel maps will be provided to illustrate the parcels/landowners identified within 500 + feet of existing natural shoreline frontage; 2) A generalized listing of Forest County landowner follow-up contacts by program type will be provided.
The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.
Grant Details
River Protection Grant
Date
4/15/2017
Waters Involved
Spencer Creek
Status
Complete
Trout Unlimited-Wild River Chapter: Spencer Creek - Reconnecting Coldwater Habitat: Wild Rivers Trout Unlimited will be sponsoring a restoration project on Spencer Creek, Forest County, WI. The project will replace an undersized culvert that is restricting flow and, is creating sediment deposition upstream from the culvert and scouring downstream from the culvert. The perched culvert is also impeding fish passage. Replacement of this barrier will reconnect 5 miles of Spencer Creek to the Rat River system and 1.56 miles of Swan Creek.
Project goals: Restore the instream habitat and aquatic connectivity of Spencer Creek. Additional expected project accomplishments include: elimination of impounding conditions upstream from Flanner Road; restoration of natural stream velocities both up and downstream of the road crossing; restoration of trout and other aquatic organism movement throughout the entirety of Spencer Creek and in and out of the Rat River, allowing natural movements to complete life history stages, increase coldwater refuge areas during warm water periods in the Rat River and, increase genetic diversity among the trout population in the entire system; reconnecting 5 miles of Spencer Creek; reconnecting use of 1.56 miles of Swan Creek.
Project deliverables: A post construction report describing monitoring conducted to document changes in velocity, water depth, silt depth, substrate type, invertebrate abundance and a mark and recapture study to ensure that fish are moving through the newly installed culvert. Temp thermistors will also be deployed to document any changes in upstream water temperatures.
Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.