Watershed - Brule River (GB18)
Brule River Watershed

Details

The Brule River Watershed is located in northern Florence and Forest counties. A small portion of the watershed extends into southeastern Vilas County. The upper 15 miles of the Menominee River are included in this watershed. Two major tributaries, the Paint and Michigamrne rivers, may significantly affect the surface water quality of the Menominee. Michigan DNR has noted rnercury contamination in sport fish throughout the Michigamme River system. Three dams have been constructed in the watershed.

Date  1993

Ecological Landscapes for Brule River Watershed

Ecological Landscapes

The Brule River Watershed lies primarily within the North Central Forest Ecological Landscape which occupies much of the northern third of Wisconsin. Its landforms are characterized by end and ground moraines with some pitted outwash and bedrock controlled areas. Kettle depressions and steep ridges are found in the northern portion. Two prominent areas in this Ecological Landscape are the Penokee-Gogebic Iron Range in the north extending into Michigan, and Timm's Hill, the highest point in Wisconsin (1,951 feet) in the south. Soils consist of sandy loam, sand, and silts. The vegetation is mainly forest, with many wetlands and some agriculture, though the growing season is not as favorable as it is in southern Wisconsin. Lake Superior greatly influences the northern portion of the Ecological Landscape especially during the winter season, producing greater snowfall than in most areas in Wisconsin. The historic vegetation was primarily hemlock-hardwood forest dominated by hemlock, sugar maple, and yellow birch. There were some smaller areas of white and red pine forest scattered throughout the Ecological Landscape, and individual white pines trees were a component of the hemlock-hardwood forest. Harvesting hemlock to support the tanneries was common at the turn of the century, and the species soon became a minor component of forests due to over-harvesting and lack of regeneration. Currently, forests cover approximately 80% of this Ecological Landscape. The northern hardwood forest is dominant, made up of sugar maple, basswood, and red maple, and also including some scattered hemlock and white pine pockets within stands. The aspen-birch forest type group is also relatively abundant, followed by spruce-fir. A variety of wetland community types also are present, both forested and non-forested.

Date  2010

Watershed Documents
Watershed Grants
Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2012
Waters Involved
Kentuck Lake
Status
Complete

Kentuck P & R District: Kentuck Lake Ais Early Detection Response Project Phase 1: Kentuck Lake P&R District is sponsoring an Early Detection Response project focusing on surveying, monitoring, mapping, hand-pulling, and chemically treating the new discovery of EWM in Kentuck Lake, Vilas County.

Project activities include: 1) Conduct annual spring pre-treatment, early-season AIS and peak-biomass surveys; 2) Conduct volunteer AIS and chemical concentration monitoring; 3) Control EWM by hand removal efforts and chemical treatments; 4) Develop annual maps and letter report.

Project deliverables include: 1) EWM survey data and maps; 2) Annual letter report describing the findings of the pre-treatment survey, early-spring survey, peak-biomass survey, chemical treatments, hand-pulling efforts, and guidance for continued control actions.

Specific conditions for this project: Annual letter report needs Department review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of letter reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2012
Waters Involved
Unnamed
Status
Complete

Kentuck P & R District: Kentuck Lake Ais Early Detection Response Project Phase 1: Kentuck Lake P&R District is sponsoring an Early Detection Response project focusing on surveying, monitoring, mapping, hand-pulling, and chemically treating the new discovery of EWM in Kentuck Lake, Vilas County.

Project activities include: 1) Conduct annual spring pre-treatment, early-season AIS and peak-biomass surveys; 2) Conduct volunteer AIS and chemical concentration monitoring; 3) Control EWM by hand removal efforts and chemical treatments; 4) Develop annual maps and letter report.

Project deliverables include: 1) EWM survey data and maps; 2) Annual letter report describing the findings of the pre-treatment survey, early-spring survey, peak-biomass survey, chemical treatments, hand-pulling efforts, and guidance for continued control actions.

Specific conditions for this project: Annual letter report needs Department review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of letter reports, all maps, and all aquatic plant and GIS data.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Kentuck Lake
Status
Complete

Kentuck P & R District: Kentuck Lake Clean Boats Clean Waters Program 2013: The Kentuck Lake P&R District is sponsoring a Clean Boats Clean Waters program including an inspection program at one public boat landing in 2013.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Kentuck Lake
Status
Complete

Kentuck P & R District: Kentuck Lake Clean Boats Clean Waters Project 2014: Kentuck Lake P&R District will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Kentuck Lake
Status
Complete

Kentuck Lake P&R District: Kentuck Lake 2015 Clean Boats Clean Waters Project: The Kentuck Lake P&R District is sponsoring a 2015 Clean Boats Clean Waters project including two public landings on Kentuck Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Kentuck Lake
Status
Complete

Kentuck Lake P&R District: Kentuck Lake Protection & Rehabilitation District 2016 Clean Boats Clean Waters: The Kentuck Lake Protection & Rehabilitation District is sponsoring a Clean Boats Clean Waters project in 2016 at two public boat landing on Kentuck Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Kentuck Lake
Status
Complete

Kentuck Lake P&R District: Kentuck Lake P&R District 2017 Cbcw: Kentuck Lake P & R District is sponsoring a Clean Boats Clean Waters project in 2017 at 2 single public boat landings and 0 public boat landing pairs on KENTUCK LAKE, KENTUCK LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2018
Waters Involved
Kentuck Lake
Status
Complete

Kentuck Lake P&R District: Kentuck Lake P&R District 2018 Cbcw: Kentuck Lake P&R District is sponsoring a Clean Boats Clean Waters project in 2018 at 2 single public boat landings and 0 public boat landing pairs on KENTUCK LAKE, KENTUCK LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Kentuck Lake
Status
Complete

Kentuck Lake P&R District: Kentuck Lake P&R District 2019 Cbcw: Kentuck Lake P&R District is sponsoring a Clean Boats Clean Waters project in 2019 at 2 single public boat landings and 0 public boat landing pairs on KENTUCK LAKE (PHELPS, N/A), KENTUCK LAKE(CAMPGROUND, N/A).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Kentuck Lake
Status
Complete

Kentuck Lake P&R District: Kentuck Lake P&R District 2020 Cbcw: Kentuck Lake P&R District is sponsoring a Clean Boats Clean Waters project in 2020 at 2 single public boat landings and 0 public boat landing pairs on KENTUCK LAKE (PHELPS), KENTUCK LAKE(STATE CAMPGROUND).


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Unnamed
Status
Complete

Kentuck P & R District: Kentuck Lake Clean Boats Clean Waters Program 2013: The Kentuck Lake P&R District is sponsoring a Clean Boats Clean Waters program including an inspection program at one public boat landing in 2013.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Unnamed
Status
Complete

Kentuck P & R District: Kentuck Lake Clean Boats Clean Waters Project 2014: Kentuck Lake P&R District will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Unnamed
Status
Complete

Kentuck Lake P&R District: Kentuck Lake 2015 Clean Boats Clean Waters Project: The Kentuck Lake P&R District is sponsoring a 2015 Clean Boats Clean Waters project including two public landings on Kentuck Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Unnamed
Status
Complete

Kentuck Lake P&R District: Kentuck Lake Protection & Rehabilitation District 2016 Clean Boats Clean Waters: The Kentuck Lake Protection & Rehabilitation District is sponsoring a Clean Boats Clean Waters project in 2016 at two public boat landing on Kentuck Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Unnamed
Status
Complete

Kentuck Lake P&R District: Kentuck Lake P&R District 2017 Cbcw: Kentuck Lake P & R District is sponsoring a Clean Boats Clean Waters project in 2017 at 2 single public boat landings and 0 public boat landing pairs on KENTUCK LAKE, KENTUCK LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2018
Waters Involved
Unnamed
Status
Complete

Kentuck Lake P&R District: Kentuck Lake P&R District 2018 Cbcw: Kentuck Lake P&R District is sponsoring a Clean Boats Clean Waters project in 2018 at 2 single public boat landings and 0 public boat landing pairs on KENTUCK LAKE, KENTUCK LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Unnamed
Status
Complete

Kentuck Lake P&R District: Kentuck Lake P&R District 2019 Cbcw: Kentuck Lake P&R District is sponsoring a Clean Boats Clean Waters project in 2019 at 2 single public boat landings and 0 public boat landing pairs on KENTUCK LAKE (PHELPS, N/A), KENTUCK LAKE(CAMPGROUND, N/A).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Unnamed
Status
Complete

Kentuck Lake P&R District: Kentuck Lake P&R District 2020 Cbcw: Kentuck Lake P&R District is sponsoring a Clean Boats Clean Waters project in 2020 at 2 single public boat landings and 0 public boat landing pairs on KENTUCK LAKE (PHELPS), KENTUCK LAKE(STATE CAMPGROUND).


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Alder Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Benson Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Bolin Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Chub Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Circle Lily Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Clear Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Crane Lake
Status
Complete

Pickerel/Crane Lake Prot & Rehab District: Acq-Pickerel/Crane Lake Property Acquisition: The Pickerel/Crane Lake P&R District has purchased a 46.7 acre parcel of land in the Town of Nashville, Forest County. The property includes 300 feet of frontage on Crane Lake, approximately 33 acres of wetland, an artesian spring, a pond and stream, and several acres of upland. The property will be managed in accordance with the Property Management Plan as outlined in the Land Management Plan attached to the Project Application (Form 8700-283) for this Lake Protection Grant.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Dead Pike Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Deerfoot Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Dog Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Fawn Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Gem Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Homestead Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Island Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Kentuck Lake
Status
Complete

Kentuck Lake P&R District: Lmi-Df-Kentuck Lake Plan Implementation: Water Quality & Ais: Kentuck Lake P&R District is sponsoring a lake protection grant to further assess water quality and manage AIS in Kentuck Lake, in Vilas County.

Project activities include: 1) In-lake water quality assessment; 2) Groundwater assessment; 3) Sediment core collection; 4) EWM and CLP monitoring and mapping; 5) Stakeholder participation planning meeting; 6) Purchase LDO probe; 7) Develop annual report and final report.

Project deliverables include: 1) In-lake, groundwater and sediment core data; 2) EWM and CLP data and mapping; 3) LDO probe; 4) Annual summary and final report.

Specific conditions for this project: Annual summary and final report need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of annual summary, final report, all maps, data and GIS from project.


Grant Details
Lake Protection Grant
Date
9/1/2000
Waters Involved
Little Saint Germain Lake
Status
Complete

Little St Germain Lake P & R District: Res- L. St. Germain Lake Aeration & Phosphorus Removal Engineering: The Little St. Germain Lake Protection and Rehabilitation District is sponsoring a project involving the installation of two lake aerators for improvement of the winter lake dissolved oxygen levels, development of a preliminary engineering work scope for reduction of phosphorus loading to Little St. Germain Lake, and monitoring of inlake water chemistry, Muskellunge Creek monitoring, and groungwater monitoring to be conducted by the USGS.

Project deliverables for this grant project will be:
USGS report including data from the continued trend monitoring, phosphorus loading data from Muskellunge Creek, sources of phosphorus to Muskellunge Creek, groundwater phosphorus contribution, pre and post aeration system installation oxygen monitoring, an updated lake water and phosphorus budget, and an evaluation of the effectiveness of the aeration system.

A final report from Foth &Van Dyke will include a feasibility study for reduction of the phosphorus loading to Little St. Germain, preliminary engineering of chemical phosphorus removal and cost projections.

Specific conditions for this project include:
* The installation of all stream gauging stations and lake aeration equipment must receive the approval and/or permit from the Department of Natural Resources water regulation section.

The Department of Natural Resources will be provided with electronic and paper copies of the final report of this project.


Grant Details
Lake Protection Grant
Date
10/1/2009
Waters Involved
Little Saint Germain Lake
Status
Complete

Little St Germain Lake P & R District: Res-Restoring Shoreline Habitat On Lt. Saint Germain Lake: Little St. Germain Lake P&R District is sponsoring a project focused on restoring 500 meters of shoreline on Lt. St. Germain Lake. Partners include the USGS, VCLA, Vilas Co. LWCD, UW Ext., WDATCP, MI Tech Univ., & WDNR.

Activities include: 1) native vegetation restoration of 500 meters of shoreline & > 4000 sq. meters of lakeshore buffer; 2) terrestrial & aquatic invasives survey & treatment/removal on restored area; 3) evaluate ecological benefits of buffer restoration for wildlife & fish pops.; 4) assess feasibility of using project to conduct experiments to quantify benifits of buffer re-establishment to reduce nutrient runoff; 5) conduct experiments to develop BMP's for shoreland restoration in the Upper Wisc. River Watershed & Northern Highlands Ecological Landscape; 6) removal, replacement of retaining walls, impervious surfaces within buffer; installation of BMPs for runoff control; 7) repair shoreland erosion w/ biologically degradable materials; 8) tree drops & aquatic macrophyte bed establishment; 9) demo. & education activities including lake ecology workshops, meetings, pamphlets & newsletters; 10) implement pollinator response surveys; 11) final report summarizing project activities including restortaion before & after photos.

Deliverables: 1) 500 meters of restoration & >4000 sq. meters of buffer area; 2) invasives control; 3) installation of BMP's & erosion control measures; 4) habitat improvements (tree drops & macrophyte bed); 5) completed workshops, pamphlets & newsletters; 6) final report (w/ BMP's & nutrient run-off component).

Specific conditions: Shoreling habitat restorations require perpetual deed restrictions; final report needs Dept. review & approval.

Lake Mgt. Coor will be provided with electronic (pdf or word) & hard copy of final report & copeis of pamphlets & newsletters.


Grant Details
Lake Protection Grant
Date
10/1/2009
Waters Involved
Little St Germain Creek
Status
Complete

Little St Germain Lake P & R District: Res-Restoring Shoreline Habitat On Lt. Saint Germain Lake: Little St. Germain Lake P&R District is sponsoring a project focused on restoring 500 meters of shoreline on Lt. St. Germain Lake. Partners include the USGS, VCLA, Vilas Co. LWCD, UW Ext., WDATCP, MI Tech Univ., & WDNR.

Activities include: 1) native vegetation restoration of 500 meters of shoreline & > 4000 sq. meters of lakeshore buffer; 2) terrestrial & aquatic invasives survey & treatment/removal on restored area; 3) evaluate ecological benefits of buffer restoration for wildlife & fish pops.; 4) assess feasibility of using project to conduct experiments to quantify benifits of buffer re-establishment to reduce nutrient runoff; 5) conduct experiments to develop BMP's for shoreland restoration in the Upper Wisc. River Watershed & Northern Highlands Ecological Landscape; 6) removal, replacement of retaining walls, impervious surfaces within buffer; installation of BMPs for runoff control; 7) repair shoreland erosion w/ biologically degradable materials; 8) tree drops & aquatic macrophyte bed establishment; 9) demo. & education activities including lake ecology workshops, meetings, pamphlets & newsletters; 10) implement pollinator response surveys; 11) final report summarizing project activities including restortaion before & after photos.

Deliverables: 1) 500 meters of restoration & >4000 sq. meters of buffer area; 2) invasives control; 3) installation of BMP's & erosion control measures; 4) habitat improvements (tree drops & macrophyte bed); 5) completed workshops, pamphlets & newsletters; 6) final report (w/ BMP's & nutrient run-off component).

Specific conditions: Shoreling habitat restorations require perpetual deed restrictions; final report needs Dept. review & approval.

Lake Mgt. Coor will be provided with electronic (pdf or word) & hard copy of final report & copeis of pamphlets & newsletters.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Little Star Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Little Trout Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lower Post Lake
Status
Complete

Post Lakes P & R District: Natural Shoreland & Habitat Project: This project will implement one of the recommendations of the Post Lakes Management Plan. The project will include development of a long-term project to support and encourage shoreland buffers and restoration of shoreland properties. The project also includes the restoration of 6 lots as education demonstration sites.

Deliverables include:
1. Development of a Natural Shorelands and Habitat Committee including DNR and County representatives to guide the development of a pilot project.
2. Development of a long-term project guide including training of volunteers to complete site assessments and an education plan.
3. Site analysis and design for 6 parcels including restoration of these sites.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Manitowish Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
McCabe Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
McKinney Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Metonga Lake
Status
Complete

Sokaogon Chippewa Community: Zebra Mussel Df Study: This project will continue the study and assessment of the impacts of zebra mussels on Lake Metonga. Specially, water chemistry, phytoplankton, zooplankton, zebra mussels, crayfish, walleye and yellow perch will be studied. The objective of this study is to gain information about the changes within the ecosystem and possible management options.

Deliverables include:
1. An annual progress report
2. A Final report including results, any management recommendations that can be determined from the available data, scientific literature review, summary of methods, results and discussion. The report will include both summarized and raw data.
3. This report will be made public within the community and will be provided to the Department in both hard and electronic copies.


Grant Details
Lake Protection Grant
Date
9/1/2008
Waters Involved
Moon Lake
Status
Complete

Alma-Moon Lake P & R District: Res-Restoring Shoreline Habitat On Moon Lake: Alma/Moon Lake P&R District is sponsoring a project focusing on restoring 1500 feet of shoreline on Moon Lake as part of a WDNR Science Services Lakeshore Restoration Research Project. Partners include UCC Moon Beach Camp, Michigan Technical University and WDNR.

Project activities include: 1) Native vegetation restoration of 1500 feet of shoreline & >4000 square meters of lakeshore buffer area; 2) Survey of restoration area for terrestrial & aquatic invasives - all encountered will be treated &/or removed; 3) Install & maintain an 8' fence & 3' hardware cloth for 3-4 years for site protection from deer & snowshoe hares; 4) Install rain gardens along areas of significant run-off; 5) Install enviro-lock biodegradable bags along areas of significant erosion; 6) 4-6 trees will be dropped & establishment of an aquatic macrophyte bed in the restoration area; 7) Shoreline restoration demonstration & education activities including lake ecology workshops, creating pamphlets, hand-outs & video DVD's, signage, brochures, & an updated Moon Beach website detailing project progress; 8) Final report summarizing project activities, including before and after photographs of restored areas.

Project deliverables include: 1)1500 feet of restored shoreline and >4000 square meters of lakeshore buffer area; 2) Treatment &/or removal of invasive species; 3) Installed rain gardens and erosion control measures; 4) Habitat improvements (tree drops and macrophyte bed); 5) Completed workshops, pamphlets, hand-outs, video DVD's, signage, brochures, and website updates; 6) Final report.

Specific Conditionst: Shoreland habitat restorations require perpetual deed restrictions; Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, and copies of pamphlets, brochures, hand-outs, and DVD's and any established protocols for tree drops and aquatic macrophyte bed establishment.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Pickerel Lake
Status
Complete

Pickerel/Crane Lake Prot & Rehab District: Res-Pickerell Lake Aeration System: The project will install an aeration system, monitor Dissolved Oxygen throughout the winter, and provide education on sources of nutrient loading into Pickerel Lake. The project will also include an education effort for safety of open water and sources of the problem which have lead to the need for lake aeration.

All required permits will be received prior to equipment installation.

Specific deliverables for this grant project include a final report describing project accomplishments.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Pier Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Rest Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Sherman Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Spider Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Statehouse Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Stepping Stone Lake Number 1
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Stepping Stone Lake Number 2
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Stepping Stone Lake Number 3
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Stone Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Sturgeon Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Tambling Lake
Status
Complete

Tambling Lake Association, Inc.: Res-Tambling Lake Aeration System: The Tambling Lake Association, Inc. will sponsor a project for the installation of one aeration system. The DNR will be provided with a written summary of the work completed under this grant and photographs.


Grant Details
Lake Protection Grant
Date
2/14/1996
Waters Involved
Torch Lake
Status
Complete

Vilas County: Acq-Torch Lake Land Acquisition - Crist Property: Vilas County will acquire 60 acres of land with frontage on Torch Lake and the Wisconsin River for lake protection and public outdoor recreation purposes. Eligible costs are outlined on the attached Cost Estimate Worksheet. PER SPONSOR: PROJECT FELL THROUGH; GRANT AWARD WITHDRAWN.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Un Spring
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Unnamed
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Unnamed
Status
Complete

Kentuck Lake P&R District: Lmi-Df-Kentuck Lake Plan Implementation: Water Quality & Ais: Kentuck Lake P&R District is sponsoring a lake protection grant to further assess water quality and manage AIS in Kentuck Lake, in Vilas County.

Project activities include: 1) In-lake water quality assessment; 2) Groundwater assessment; 3) Sediment core collection; 4) EWM and CLP monitoring and mapping; 5) Stakeholder participation planning meeting; 6) Purchase LDO probe; 7) Develop annual report and final report.

Project deliverables include: 1) In-lake, groundwater and sediment core data; 2) EWM and CLP data and mapping; 3) LDO probe; 4) Annual summary and final report.

Specific conditions for this project: Annual summary and final report need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of annual summary, final report, all maps, data and GIS from project.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Vance Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Wild Rice Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Afterglow Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Afterglow Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
3/15/2024
Waters Involved
Amik Lake
Status
Complete

Vilas County: Clg - Vilas County Strategic Lake Protection Implementation Program: The Vilas County Land and Water Dept is sponsoring a project to accomplish workplan activities from the Land and Water plan that focus on improving and protecting water quality in the highest quality waters of Vilas County.

Activities: 1) Conduct AIS, shoreland, coarse wood, PI and water quality sampling 2) Conduct shoreland habitat protection campaign 3) Conduct contractor training workshop 4) Design and install shoreline BMP\2019s 5) Recruit and train WAV volunteers 6) Finalize road and stream crossing project

Deliverables: 1) Monitoring data and entry into SWIMS 2) Completed trainings/workshops 3) Final report.

Conditions:
1) Final report needs Dept review and approval

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Baker Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Baker Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
3/15/2024
Waters Involved
Big Lake
Status
Complete

Vilas County: Clg - Vilas County Strategic Lake Protection Implementation Program: The Vilas County Land and Water Dept is sponsoring a project to accomplish workplan activities from the Land and Water plan that focus on improving and protecting water quality in the highest quality waters of Vilas County.

Activities: 1) Conduct AIS, shoreland, coarse wood, PI and water quality sampling 2) Conduct shoreland habitat protection campaign 3) Conduct contractor training workshop 4) Design and install shoreline BMP\2019s 5) Recruit and train WAV volunteers 6) Finalize road and stream crossing project

Deliverables: 1) Monitoring data and entry into SWIMS 2) Completed trainings/workshops 3) Final report.

Conditions:
1) Final report needs Dept review and approval

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Big Sand Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Big Sand Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Blackjack Springs
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Blackjack Springs
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Camp One Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Camp One Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Camp Two Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Camp Two Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Catherine Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Catherine Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Crystal Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Crystal Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Deerskin Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Deerskin Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Dewey Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Dewey Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Eleanore Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Eleanore Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Ellen Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Ellen Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Elvoy Springs
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Elvoy Springs
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Gail Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Gail Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Goodall Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Goodall Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Gross Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Gross Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Imogene Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Imogene Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Jewel Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Jewel Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Kentuck Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Kentuck Lake
Status
Complete

Kentuck P & R District: Comprehensive Management Plan For Kentuck Lake: The Kentuck lake P & R District proposes to create a comprehensive managment plan that will include the following components:

* Lake History
* Lake Issues
* Shoreland and Watershed Management
* Water Quality
* Aquatic Vegetation
* Fisheries
* Private Waste Disposal
* Recommendations, Summary, and Proposed Long Range Plan

The results of this projec will be distributed by newsletter mailing, fact sheet distribution,entire report mailing, public meeting, summary report mailing, local newspaper article, and a Comprehensive Management Plan of which two copies (one hard copy and one electronic copy) will be forwarded to the Department of Natural Resources.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Kentuck Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Kentuck Lake
Status
Complete

Town Of Washington: Kentuck, Silver & Tambling Lakes Limnological Baseline Studies & Apm Plans: The Town of Washington is sponsoring a large scale lake planning grant to study Kentuck, Silver and Tambling Lakes in Forest and Vilas Counties with a study completion date of June 30, 2008. The Town of Lincoln, Town of Cloverland, City of Eagle River, and Kentuck Lake District are project partners. The project will focus on developing an Aquatic Plant Management (APM) Plan for each lake.

Project activities include:
1) Data review, project kick-off meeting and project final meeting
2) Develop public questionnaire and prepare educational article
3) Point-intercept (PI) survey of aquatic plants with 2 sets of pressed plants from Kentuck and Tambling Lakes
4) Aquatic plant community mapping and analysis
5) Water quality sampling - secchi, P, Chla, and DO through citizen lake monitor and Temp during aquatic plant survey for Kentuck Lake, - secchi through citizen lake monitor and P, Chla, DO, and Temp during aquatic plant survey for Tambling Lake - secchi, DO, P, Chla, and Temp during survey period for Silver Lake
6) Watershed and land use analysis
7) Develop APM Plans

Project deliverables include:
1) Public questionnaire and educational article
2) PI data and aquatic plant community and watershed maps
3) 2 sets of pressed aquatic plants from Kentuck and Tambling Lakes (one set for lake group and second for Dept)
4) Water quality sampling results
5) APM Plans

Specific conditions for this project:
- Draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plans need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plans, educational article, public questionnaire, data from watershed and land use analysis, data from PI survey, data from water quality sampling, all maps from project, and a set of pressed aquatic plants from Kentuck and Tambling Lakes.


Grant Details
Large Scale Lake Planning
Date
10/1/2012
Waters Involved
Kentuck Lake
Status
Complete

Kentuck P & R District: Kentuck Lake Management Planning Project: Kentuck Lake P&R District is sponsoring a large scale lake planning grant to study Kentuck Lake, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Kentuck Lake.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline assessment; 6) Professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey analysis, CLP assessment, community mapping, substrate mapping); 8) Data analysis; 9) Develop LMP.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI data analysis and shoreland data; 5) Aquatic plant community and substrate maps; 6) LMP.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, stakeholder survey, data analysis from PI, shoreland assessment, watershed assessment and water quality sampling, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
10/1/2012
Waters Involved
Kentuck Lake
Status
Proposed

Kentuck P & R District: Kentuck Lake Management Planning Project: Kentuck Lake P&R District is sponsoring a large scale lake planning grant to study Kentuck Lake, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Kentuck Lake.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline assessment; 6) Professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey analysis, CLP assessment, community mapping, substrate mapping); 8) Data analysis; 9) Develop LMP.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI data analysis and shoreland data; 5) Aquatic plant community and substrate maps; 6) LMP.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, stakeholder survey, data analysis from PI, shoreland assessment, watershed assessment and water quality sampling, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
2/15/2018
Waters Involved
Kentuck Lake
Status
Complete

Kentuck Lake P&R District: Kentuck Lake Technical Review Team Data Request Fulfillment: Kentuck Lake P&R District is sponsoring a Lake Planning grant to further assess Kentuck Lake, in Vilas County.

Project activities include: 1) In-lake water quality assessment (DO and temp profiles); 2) Zooplankton and phytoplankton assessment; 3) Point-intercept (PI) aquatic plant survey; 4) Develop final report.

Project deliverables include: 1) Water quality, PI, zooplankton, and phytoplankton data; 2) Aquatic plant vouchers; 3) Final report.

Specific conditions for this project: Final report need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, aquatic plant vouchers, all maps, data and GIS from project.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Kildare Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Kildare Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Lac Vieux Desert
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Lac Vieux Desert
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
3/15/2024
Waters Involved
Little Portage Lake
Status
Complete

Vilas County: Clg - Vilas County Strategic Lake Protection Implementation Program: The Vilas County Land and Water Dept is sponsoring a project to accomplish workplan activities from the Land and Water plan that focus on improving and protecting water quality in the highest quality waters of Vilas County.

Activities: 1) Conduct AIS, shoreland, coarse wood, PI and water quality sampling 2) Conduct shoreland habitat protection campaign 3) Conduct contractor training workshop 4) Design and install shoreline BMP\2019s 5) Recruit and train WAV volunteers 6) Finalize road and stream crossing project

Deliverables: 1) Monitoring data and entry into SWIMS 2) Completed trainings/workshops 3) Final report.

Conditions:
1) Final report needs Dept review and approval

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Long Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Long Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Manuel Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Manuel Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
3/15/2024
Waters Involved
Moccasin Lake
Status
Complete

Vilas County: Clg - Vilas County Strategic Lake Protection Implementation Program: The Vilas County Land and Water Dept is sponsoring a project to accomplish workplan activities from the Land and Water plan that focus on improving and protecting water quality in the highest quality waters of Vilas County.

Activities: 1) Conduct AIS, shoreland, coarse wood, PI and water quality sampling 2) Conduct shoreland habitat protection campaign 3) Conduct contractor training workshop 4) Design and install shoreline BMP\2019s 5) Recruit and train WAV volunteers 6) Finalize road and stream crossing project

Deliverables: 1) Monitoring data and entry into SWIMS 2) Completed trainings/workshops 3) Final report.

Conditions:
1) Final report needs Dept review and approval

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Muskeg Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Muskeg Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Norwood Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Norwood Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Noseeum Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Noseeum Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
3/15/2024
Waters Involved
Papoose Lake
Status
Complete

Vilas County: Clg - Vilas County Strategic Lake Protection Implementation Program: The Vilas County Land and Water Dept is sponsoring a project to accomplish workplan activities from the Land and Water plan that focus on improving and protecting water quality in the highest quality waters of Vilas County.

Activities: 1) Conduct AIS, shoreland, coarse wood, PI and water quality sampling 2) Conduct shoreland habitat protection campaign 3) Conduct contractor training workshop 4) Design and install shoreline BMP\2019s 5) Recruit and train WAV volunteers 6) Finalize road and stream crossing project

Deliverables: 1) Monitoring data and entry into SWIMS 2) Completed trainings/workshops 3) Final report.

Conditions:
1) Final report needs Dept review and approval

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Pickel Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Pickel Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
3/15/2024
Waters Involved
Pickerel Creek
Status
Complete

Vilas County: Clg - Vilas County Strategic Lake Protection Implementation Program: The Vilas County Land and Water Dept is sponsoring a project to accomplish workplan activities from the Land and Water plan that focus on improving and protecting water quality in the highest quality waters of Vilas County.

Activities: 1) Conduct AIS, shoreland, coarse wood, PI and water quality sampling 2) Conduct shoreland habitat protection campaign 3) Conduct contractor training workshop 4) Design and install shoreline BMP\2019s 5) Recruit and train WAV volunteers 6) Finalize road and stream crossing project

Deliverables: 1) Monitoring data and entry into SWIMS 2) Completed trainings/workshops 3) Final report.

Conditions:
1) Final report needs Dept review and approval

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.


Grant Details
Large Scale Lake Planning
Date
3/15/2024
Waters Involved
Pickerel Lake
Status
Complete

Vilas County: Clg - Vilas County Strategic Lake Protection Implementation Program: The Vilas County Land and Water Dept is sponsoring a project to accomplish workplan activities from the Land and Water plan that focus on improving and protecting water quality in the highest quality waters of Vilas County.

Activities: 1) Conduct AIS, shoreland, coarse wood, PI and water quality sampling 2) Conduct shoreland habitat protection campaign 3) Conduct contractor training workshop 4) Design and install shoreline BMP\2019s 5) Recruit and train WAV volunteers 6) Finalize road and stream crossing project

Deliverables: 1) Monitoring data and entry into SWIMS 2) Completed trainings/workshops 3) Final report.

Conditions:
1) Final report needs Dept review and approval

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Plymouth Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Plymouth Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
3/15/2024
Waters Involved
Portage Creek
Status
Complete

Vilas County: Clg - Vilas County Strategic Lake Protection Implementation Program: The Vilas County Land and Water Dept is sponsoring a project to accomplish workplan activities from the Land and Water plan that focus on improving and protecting water quality in the highest quality waters of Vilas County.

Activities: 1) Conduct AIS, shoreland, coarse wood, PI and water quality sampling 2) Conduct shoreland habitat protection campaign 3) Conduct contractor training workshop 4) Design and install shoreline BMP\2019s 5) Recruit and train WAV volunteers 6) Finalize road and stream crossing project

Deliverables: 1) Monitoring data and entry into SWIMS 2) Completed trainings/workshops 3) Final report.

Conditions:
1) Final report needs Dept review and approval

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Potfish Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Potfish Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Reservoir Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Reservoir Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
3/15/2024
Waters Involved
Rice Creek
Status
Complete

Vilas County: Clg - Vilas County Strategic Lake Protection Implementation Program: The Vilas County Land and Water Dept is sponsoring a project to accomplish workplan activities from the Land and Water plan that focus on improving and protecting water quality in the highest quality waters of Vilas County.

Activities: 1) Conduct AIS, shoreland, coarse wood, PI and water quality sampling 2) Conduct shoreland habitat protection campaign 3) Conduct contractor training workshop 4) Design and install shoreline BMP\2019s 5) Recruit and train WAV volunteers 6) Finalize road and stream crossing project

Deliverables: 1) Monitoring data and entry into SWIMS 2) Completed trainings/workshops 3) Final report.

Conditions:
1) Final report needs Dept review and approval

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Robinson Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Robinson Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Secret Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Secret Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Smoky Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Smoky Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Spectacle Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Spectacle Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Spectacle Lake
Status
In_Progress

Spectacle Lake Protection & Rehab Dist: Spectacle Lake Stewardship Program, Phase 1: Spectacle Lake P&R District is sponsoring phased large scale lake planning project to study Spectacle Lake, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Spectacle Lake. Phases 1 and 2 were funded with the Feb 1, 2011 grant cycle and Phase 3 will be submitted for funding consideration with the Aug 1, 2011 grant cycle.

Phase 1 project activities include: 1) Gather and assess existing Spectacle Lake info; 2) Point-intercept (PI) aquatic plant survey, community and substrate mapping and analysis; 3) Watershed assessment and water quality sampling; 4) Initiate volunteer frog and toad monitoring and angler\2019s journal program; 5) Educational program \2013 meetings, newsletter articles, and press releases; 6) Conduct watercraft inspections and data entry into SWIMS.

Project deliverables include: 1) PI, water quality and watershed data; 2) Aquatic plant community and substrate maps; 3) Aquatic plant vouchers; 4) Frog and toad and angler\2019s journal data; 5) Education materials; 6) Entered inspection data.

Specific conditions for this project: Project summaries and reports need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of reports, PI, water quality, watershed, frog and toad, and angler data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Spectacle Lake
Status
In_Progress

Spectacle Lake Protection & Rehab Dist: Spectacle Lake Stewardship Program, Phase 2: Spectacle Lake P&R District is sponsoring phased large scale lake planning project to study Spectacle Lake, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Spectacle Lake. Phases 1 and 2 were funded with the Feb 1, 2011 grant cycle and Phase 3 will be submitted for funding consideration with the Aug 1, 2011 grant cycle.

Phase 2 project activities include: 1) Rare species and water quality assessment; 2) Volunteer frog and toad monitoring and angler\2019s journal program; 3) Document the littoral zone and riparian area condition using digital photography; 4) Qualitatively document the littoral zone and riparian area using a volunteer-based rapid assessment technique; 5) Quantitatively document the littoral zone and riparian area using the USEPA Lake Assessment Procedure along with the WDNR Supplemental Lakeshore Assessment; 6) Educational program \2013 stakeholder survey, meetings, newsletter articles, and press releases.

Project deliverables include: 1) Rare species, water quality, frog and toad, and angler\2019s journal data; 2) An electronic, image-based waterfront archive that presents geographic data, digital photographic documentation and qualitative assessment; 3) Report of the USEPA and WDNR quantitative assessment; 4) Education materials and stakeholder survey.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Project summaries and reports need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of reports, stakeholder survey and image-based waterfront archive, rare species, water quality, frog and toad, and angler data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
10/1/2011
Waters Involved
Spectacle Lake
Status
Complete

Spectacle Lake Protection & Rehab Dist: Spectacle Lake Stewardship Program, Phase 3: Spectacle Lake P&R District is sponsoring phased large scale lake planning grants to study Spectacle Lake, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Spectacle Lake. Phases 1 and 2 were funded in the Feb 2011 grant cycle and Phase 3 was funded in Aug 2011.

Phase 3 project activities include: 1) Rare species and water quality assessment; 2) Volunteer frog and toad monitoring and angler\2019s journal program; 3) Water quality and watershed assessment; 4) Develop Aquatic Plant Management (APM) plan and LMP; 5) Educational program \2013 stakeholder survey, meetings, newsletter articles, and press releases.

Project deliverables include: 1) Rare species, water quality, watershed, frog and toad, and angler\2019s journal data; 2) APM plan and LMP; 3) Education materials and stakeholder survey.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) APM plan and LMP need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of APM plan, LMP, reports, stakeholder survey, rare species, water quality, frog and toad, and angler data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
10/1/2011
Waters Involved
Spectacle Lake
Status
In_Progress

Spectacle Lake Protection & Rehab Dist: Spectacle Lake Stewardship Program, Phase 3: Spectacle Lake P&R District is sponsoring phased large scale lake planning grants to study Spectacle Lake, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Spectacle Lake. Phases 1 and 2 were funded in the Feb 2011 grant cycle and Phase 3 was funded in Aug 2011.

Phase 3 project activities include: 1) Rare species and water quality assessment; 2) Volunteer frog and toad monitoring and angler\2019s journal program; 3) Water quality and watershed assessment; 4) Develop Aquatic Plant Management (APM) plan and LMP; 5) Educational program \2013 stakeholder survey, meetings, newsletter articles, and press releases.

Project deliverables include: 1) Rare species, water quality, watershed, frog and toad, and angler\2019s journal data; 2) APM plan and LMP; 3) Education materials and stakeholder survey.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) APM plan and LMP need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of APM plan, LMP, reports, stakeholder survey, rare species, water quality, frog and toad, and angler data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
3/15/2024
Waters Involved
Spectacle Lake
Status
Complete

Vilas County: Clg - Vilas County Strategic Lake Protection Implementation Program: The Vilas County Land and Water Dept is sponsoring a project to accomplish workplan activities from the Land and Water plan that focus on improving and protecting water quality in the highest quality waters of Vilas County.

Activities: 1) Conduct AIS, shoreland, coarse wood, PI and water quality sampling 2) Conduct shoreland habitat protection campaign 3) Conduct contractor training workshop 4) Design and install shoreline BMP\2019s 5) Recruit and train WAV volunteers 6) Finalize road and stream crossing project

Deliverables: 1) Monitoring data and entry into SWIMS 2) Completed trainings/workshops 3) Final report.

Conditions:
1) Final report needs Dept review and approval

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Stub Walsh Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Stub Walsh Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Sugar Maple Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Sugar Maple Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Twin Lakes (North)
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Twin Lakes (North)
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Twin Lakes (South)
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Twin Lakes (South)
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Un Spring
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Un Spring
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Unnamed
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Unnamed
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Unnamed
Status
Complete

Town Of Washington: Kentuck, Silver & Tambling Lakes Limnological Baseline Studies & Apm Plans: The Town of Washington is sponsoring a large scale lake planning grant to study Kentuck, Silver and Tambling Lakes in Forest and Vilas Counties with a study completion date of June 30, 2008. The Town of Lincoln, Town of Cloverland, City of Eagle River, and Kentuck Lake District are project partners. The project will focus on developing an Aquatic Plant Management (APM) Plan for each lake.

Project activities include:
1) Data review, project kick-off meeting and project final meeting
2) Develop public questionnaire and prepare educational article
3) Point-intercept (PI) survey of aquatic plants with 2 sets of pressed plants from Kentuck and Tambling Lakes
4) Aquatic plant community mapping and analysis
5) Water quality sampling - secchi, P, Chla, and DO through citizen lake monitor and Temp during aquatic plant survey for Kentuck Lake, - secchi through citizen lake monitor and P, Chla, DO, and Temp during aquatic plant survey for Tambling Lake - secchi, DO, P, Chla, and Temp during survey period for Silver Lake
6) Watershed and land use analysis
7) Develop APM Plans

Project deliverables include:
1) Public questionnaire and educational article
2) PI data and aquatic plant community and watershed maps
3) 2 sets of pressed aquatic plants from Kentuck and Tambling Lakes (one set for lake group and second for Dept)
4) Water quality sampling results
5) APM Plans

Specific conditions for this project:
- Draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plans need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plans, educational article, public questionnaire, data from watershed and land use analysis, data from PI survey, data from water quality sampling, all maps from project, and a set of pressed aquatic plants from Kentuck and Tambling Lakes.


Grant Details
Large Scale Lake Planning
Date
2/15/2018
Waters Involved
Unnamed
Status
Complete

Kentuck Lake P&R District: Kentuck Lake Technical Review Team Data Request Fulfillment: Kentuck Lake P&R District is sponsoring a Lake Planning grant to further assess Kentuck Lake, in Vilas County.

Project activities include: 1) In-lake water quality assessment (DO and temp profiles); 2) Zooplankton and phytoplankton assessment; 3) Point-intercept (PI) aquatic plant survey; 4) Develop final report.

Project deliverables include: 1) Water quality, PI, zooplankton, and phytoplankton data; 2) Aquatic plant vouchers; 3) Final report.

Specific conditions for this project: Final report need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, aquatic plant vouchers, all maps, data and GIS from project.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Vista Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Vista Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Warvet Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Warvet Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Weber Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Weber Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Whispering Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Whispering Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
3/15/2024
Waters Involved
Wildcat Creek
Status
Complete

Vilas County: Clg - Vilas County Strategic Lake Protection Implementation Program: The Vilas County Land and Water Dept is sponsoring a project to accomplish workplan activities from the Land and Water plan that focus on improving and protecting water quality in the highest quality waters of Vilas County.

Activities: 1) Conduct AIS, shoreland, coarse wood, PI and water quality sampling 2) Conduct shoreland habitat protection campaign 3) Conduct contractor training workshop 4) Design and install shoreline BMP\2019s 5) Recruit and train WAV volunteers 6) Finalize road and stream crossing project

Deliverables: 1) Monitoring data and entry into SWIMS 2) Completed trainings/workshops 3) Final report.

Conditions:
1) Final report needs Dept review and approval

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.


Grant Details
Large Scale Lake Planning
Date
3/15/2024
Waters Involved
Wildcat Lake
Status
Complete

Vilas County: Clg - Vilas County Strategic Lake Protection Implementation Program: The Vilas County Land and Water Dept is sponsoring a project to accomplish workplan activities from the Land and Water plan that focus on improving and protecting water quality in the highest quality waters of Vilas County.

Activities: 1) Conduct AIS, shoreland, coarse wood, PI and water quality sampling 2) Conduct shoreland habitat protection campaign 3) Conduct contractor training workshop 4) Design and install shoreline BMP\2019s 5) Recruit and train WAV volunteers 6) Finalize road and stream crossing project

Deliverables: 1) Monitoring data and entry into SWIMS 2) Completed trainings/workshops 3) Final report.

Conditions:
1) Final report needs Dept review and approval

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Afterglow Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Baker Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Beaver Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Big Sand Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Blackjack Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Blackjack Springs
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Brule Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Camp One Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Camp Two Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Catherine Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Crystal Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Deerskin Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Deerskin River
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Dewey Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Eleanore Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Eleanore Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Ellen Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Elvoy Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Elvoy Springs
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Gail Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Goodall Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Gross Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Gross Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Haymeadow Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Imogene Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Jewel Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Kentuck Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Kentuck Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Kildare Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Kildare Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Lac Vieux Desert
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Little Deerskin River
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Little Smoky Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Lobischer Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Long Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Manuel Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Military Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Muskeg Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Muskrat Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Norwood Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Noseeum Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Pickel Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Plymouth Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Potfish Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Potfish Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Reservoir Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Robinson Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Secret Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Smoky Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Spectacle Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Spectacle Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Stub Walsh Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Sugar Maple Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Thoroughfare Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Twin Lakes (North)
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Twin Lakes (South)
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Twin River
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Un Spring
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Unnamed
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Vista Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Warvet Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Weber Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Whispering Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Wisconsin River
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
River Planning Grant
Date
7/1/2011
Waters Involved
Pine River
Status
Complete

Northwoods Land Trust, Inc.: Florence County River Conservation Project: Northwood\2019s Land Trust, Inc. proposes to conduct a direct mail education campaign with all property owners on the priority river and stream segments in Florence County that were identified by the DNR Northern Rivers Initiative. An information packet will be provided highlighting voluntary conservation options those property owners can utilize to protect the priority stream corridors. Those options include conservation easements, land donation, land registry and conservation buyer programs. Individual on site property assessments and conservation planning will be conducted with any landowners who express interest.

The project includes the following goals: 1) Direct mail information packets describing voluntary conservation options private landowners can utilize to protect their properties. This information will include how the options can protect land while also providing income, estate and other tax benefits to landowners. The mailing will include all private property owners with at least 500 feet of natural shoreline on these priority river segments; 2) Conduct on-site follow-up contacts with interested landowners as generated by mailing and media publicity; 3) Encourage interested landowners to voluntarily enter into perpetual land protection agreements or utilize other land protection tools to protect their priority river/stream segments.

Project deliverables include: 1) Copies of color GIS maps of each of the towns with digitized parcel maps will be provided to illustrate the parcels/landowners identified within 500 + feet of existing natural shoreline frontage; 2) A generalized listing of Florence County landowner follow-up contacts by program type will be provided.

The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
River Planning Grant
Date
7/1/2009
Waters Involved
South Branch Peshtigo River
Status
Complete

Northwoods Land Trust, Inc.: Forest County River Conservation Project: Northwood\2019s Land Trust, Inc. proposes to conduct a direct mail education campaign with all property owners on the priority river and stream segments in Forest County that were identified by the DNR Northern Rivers Initiative. An information packet will be provided highlighting voluntary conservation options those property owners can utilize to protect the priority stream corridors. Those options include conservation easements, land donation, land registry and conservation buyer programs. Individual on site property assessments and conservation planning will be conducted with any landowners who express interest.

The project includes the following goals: 1) Direct mail information packets describing voluntary conservation options private landowners can utilize to protect their properties. This information will include how the options can protect land while also providing income, estate and other tax benefits to landowners. The mailing will include all private property owners with at least 500 feet of natural shoreline on these priority river segments; 2) Conduct on-site follow-up contacts with interested landowners as generated by mailing and media publicity; 3) Encourage interested landowners to voluntarily enter into perpetual land protection agreements or utilize other land protection tools to protect their priority river/stream segments.

Project deliverables include: 1) Copies of color GIS maps of each of the towns with digitized parcel maps will be provided to illustrate the parcels/landowners identified within 500 + feet of existing natural shoreline frontage; 2) A generalized listing of Forest County landowner follow-up contacts by program type will be provided.

The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
River Protection Grant
Date
4/15/2017
Waters Involved
Spencer Creek
Status
Complete

Trout Unlimited-Wild River Chapter: Spencer Creek - Reconnecting Coldwater Habitat: Wild Rivers Trout Unlimited will be sponsoring a restoration project on Spencer Creek, Forest County, WI. The project will replace an undersized culvert that is restricting flow and, is creating sediment deposition upstream from the culvert and scouring downstream from the culvert. The perched culvert is also impeding fish passage. Replacement of this barrier will reconnect 5 miles of Spencer Creek to the Rat River system and 1.56 miles of Swan Creek.

Project goals: Restore the instream habitat and aquatic connectivity of Spencer Creek. Additional expected project accomplishments include: elimination of impounding conditions upstream from Flanner Road; restoration of natural stream velocities both up and downstream of the road crossing; restoration of trout and other aquatic organism movement throughout the entirety of Spencer Creek and in and out of the Rat River, allowing natural movements to complete life history stages, increase coldwater refuge areas during warm water periods in the Rat River and, increase genetic diversity among the trout population in the entire system; reconnecting 5 miles of Spencer Creek; reconnecting use of 1.56 miles of Swan Creek.

Project deliverables: A post construction report describing monitoring conducted to document changes in velocity, water depth, silt depth, substrate type, invertebrate abundance and a mark and recapture study to ensure that fish are moving through the newly installed culvert. Temp thermistors will also be deployed to document any changes in upstream water temperatures.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Monitoring & Projects

Projects including grants, restoration work and studies shown below have occurred in this watershed. Click the links below to read through the text. While these are not an exhaustive list of activities, they provide insight into the management activities happening in this watershed.

Grants and Management Projects
Brule River Watershed
Watershed Recommendations
Aquatic Plant Management Plan
 
Date
Status
10/1/2011
In Progress
Projects
 
Aquatic Plant Monitoring or Survey
 
Date
Status
10/1/2012
Proposed
Projects
 
Develop/Distribute Newsletter
 
Date
Status
10/1/2011
In Progress
Projects
 
Educate and engage residents
 
Date
Status
10/1/2011
In Progress
Projects
 
Information and Education
 
Date
Status
10/1/2011
In Progress
Projects
 
Information and Education
 
Date
Status
4/1/2011
In Progress
Projects
 
Information and Education
 
Date
Status
4/1/2011
In Progress
Projects
 
Issue News/Media Release
 
Date
Status
10/1/2011
In Progress
Projects
 
Lake Management Plan Development
 
Date
Status
10/1/2012
Proposed
Projects
 
Lake Management Plan Development
 
Date
Status
4/1/2011
In Progress
Projects
 
Lake Management Plan Development
 
Date
Status
4/1/2011
In Progress
Projects
 
Lakes Planning Grant
 
Date
Status
10/1/2012
Proposed
Projects
 
Monitor Fish Community
 
Date
Status
10/1/2012
Proposed
Projects
 
Monitor Invasive Species
 
Date
Status
10/1/2012
Proposed
Projects
 
Monitor Water Quality or Sediment
 
Date
Status
10/1/2012
Proposed
Projects
 
Shoreland Monitoring, Assessment, Inventory
Grant LPL-1485-13 - Shoreland Assessment
Date
Status
Shoreland Monitoring, Assessment or Inventory
10/1/2012
Proposed
Projects
 
Social Survey of Residents or Users
 
Date
Status
10/1/2012
Proposed
Projects
 
Watershed Mapping or Assessment
 
Date
Status
10/1/2012
Proposed
Projects
 
Brule River WatershedWatershed History Note

The Florence County Courthouse and Jail, built in 1889, is an historic complex of governmental buildings located at 501 Lake Street in Florence, Wisconsin. Designed by architect James E. Clancy of Antigo in the Romanesque style, it was built of brick with local sandstone and blue limestone trim and terra cotta roofs. The courthouse cost $13,000 while the 3-cell jail building cost $4,000. On December 02, 1985, the complex was added to the National Register of Historic Places. The jail was in use for over a quarter of a century. It served the county in helping to hold law and order in the busy logging and mining era. It is open to the public during the summer months. The courthouse is still in use. A south addition was built in 1994.

Date  2010