Watershed - East and West Branches Milwaukee River (MI06)
East and West Branches Milwaukee River Watershed

Details

The Milwaukee River East-West Watershed covers 266 square miles and is located in portions of Dodge, Fond du Lac, Ozaukee, Sheboygan, and Washington counties. The East and West Branches of the Milwaukee River meet the Milwaukee River mainstem near the Village of Kewaskum in Washington County. The Milwaukee River then runs south and east to western Ozaukee County where this watershed meets the Milwaukee River South Watershed. The East-West Branch Milwaukee River Watershed contains over 30 named lakes ranging in size from 427 acres (Long Lake) to two acres (Mallard Hole Lake), providing many recreational opportunities. Six lakes have active lake associations or districts. Rural uses cover most of the land area in this watershed. Agriculture is dominant, covering about 47 percent of the land area, followed by wetlands (19%), grasslands (16%) and forests (12%). Urban uses cover about three percent of the land area. The City of West Bend and the Villages of Campbellsport, Kewaskum and Newburg are the only incorporated areas in the watershed.

Date  2001

Details

Date  2001

Ecological Landscapes for East and West Branches Milwaukee River Watershed

Ecological Landscapes

The Southeast Glacial Plains Ecological Landscape makes up the bulk of the non-coastal land area in southeast Wisconsin. This Ecological Landscape is made up of glacial till plains and moraines. Most of this Ecological Landscape is composed of glacial materials deposited during the Wisconsin Ice Age, but the southwest portion consists of older, pre-Wisconsin till with a more dissected topography. Soils are lime-rich tills overlain in most areas by a silt-loam loess cap. Agricultural and residential interests throughout the landscape have significantly altered the historical vegetation. Most of the rare natural communities that remain are associated with large moraines or in areas where the Niagara Escarpment occurs close to the surface. Historically, vegetation in the Southeast Glacial Plains consisted of a mix of prairie, oak forests and savanna, and maple-basswood forests. Wet-mesic prairies, southern sedge meadows, emergent marshes, and calcareous fens were found in lower portions of the Landscape. End moraines and drumlins supported savannas and forests. Agricultural and urban land use practices have drastically changed the land cover of the Southeast Glacial Plains since Euro-American settlement. The current vegetation is primarily agricultural cropland. Remaining forests occupy only about 10% of the land area and consist of maple-basswood, lowland hardwoods, and oak. No large mesic forests exist today except on the Kettle Interlobate Moraine which has topography too rugged for agriculture. Some existing forest patches that were formerly savannas have succeeded to hardwood forest due to fire suppression.

Date  2010

Hydrologic Features

The Milwaukee River mainstem is the longest river in this watershed (53 miles). The Milwaukee River begins in wetlands in Fond du Lac County, and flows in a southeasterly direction until meeting the North Branch Milwaukee River near Waubeka. Upstream of Kewaskum, wetland drainage, river straightening, especially the smaller headwaters streams, dams and agricultural runoff are the major factors keeping the rivers from fully meeting their potential. Downstream of Kewaskum, the river is increasingly affected by urban land uses and five major dams, leading to degraded habitat and water quality from nutrient and sediment inputs. The headwaters for the Milwaukee River East Branch begin with Watercress Creek, a trout stream, in Sheboygan County. The Milwaukee River East Branch then flows south through Long Lake, Mauthe Lake and the New Fane Millpond until it reaches the Milwaukee River mainstem. Unlike the Milwaukee River mainstem, most of East Branch remains in a relatively natural, unchannelized condition. Agricultural runoff contributing nutrients and sediment are the major sources of water quality degradation in the East Branch. The West Branch Milwaukee River is located in the rolling glacial topography of Fond du Lac County. The river begins with wetlands and flows southeast through wetlands and Lake Bernice before reaching the Milwaukee River mainstem. This river has been greatly affected by channelization for agricultural purposes, especially in the headwaters. Nutrients and sediment from agricultural runoff and stream modification (channelization and dams) contribute to reduced water quality in the West Branch Milwaukee River.

Date  2001

Fisheries

Fish species found in this watershed range from intolerant species such as brook trout, mottled sculpin, blackchin shiner, Iowa darter, pearl dace and northern redbelly dace in the cool and cold water streams, to more tolerant species such as creek chub, central mudminnow, common shiner and white sucker in the more degraded streams. Other than brook trout, sport fish species found in the watershed include smallmouth bass, black bullhead, northern pike, pumpkinseed and bluegill. The state threatened pugnose shiner, greater redhorse and longear sunfish have also been documented in this watershed.

Date  2001

East and West Branches Milwaukee River Watershed At-a-Glance

Impaired Water in East and West Branches Milwaukee River Watershed
River and Stream QualityAll Waters in Watershed

The Milwaukee River East-West Watershed contains about 196 miles of perennial streams. Nearly all the stream miles in this watershed (98%) are partially meeting their biological uses, while two percent of the streams have not been evaluated. Even though general evaluations have been conducted on many of the streams in the watershed, thorough assessments have been conducted on just five percent of total stream miles within the last five years. No streams in this watershed are listed as impaired waters on the state’s 303(d) list. Portions of two rivers (Auburn Lake Creek and East Branch Milwaukee River) totaling six miles in length are considered exceptional resource waters.

Date  2001

Watershed Trout Streams
Watershed Outstanding & Exceptional Resources

Lakes and Impoundments

Impaired Waters

List of Impaired Waters
Watershed Documents
Watershed Grants
Grant Details
Aquatic Invasives Control
Date
4/1/2005
Waters Involved
Kettle Moraine Lake
Status
Complete

Fond Du Lac County: Kettle Moraine Lake Long Term Exotic Species Control Study: Amend #2: The Fond du Lac County Land and Water Conservation Department, on behalf of the Kettle Moraine Lake Association, proposes to control Eurasian watermilfoil (EWM) through chemical treatment and preventative measures in Kettle Moraine Lake during the period 2005 - 2007. The project elements and deliverables are specified in the Fond du Lac County Land and Water Conservation Department's Aquatic Invasive Species Grant application, dated January 12, 2005, and the "Amendment to the Scope of the Aquatic Invasive Species grant proposal for Kettle Moraine Lake, Fond du Lac County", dated February 23, 2006. The project includes mapping the extent of EWM annually; treating EWM infested areas with aquatic herbicides;; and conducting volunteer activities to prevent further aquatic invasive species infestations, including distributing educational materials to lake users, conducting watercraft inspections and posting/maintaining informational signs at public access points. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database. Annual progress reports and a final report summarizing the three-year project will be provided to DNR.

If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Control
Date
10/1/2008
Waters Involved
Kettle Moraine Lake
Status
Complete

Fond Du Lac County: Kettle Moraine Lake Ewm & Clp Management Project: The Fondulac County Land and Water Department proposes to control Curly-leaf pondweed (CLP) and Eurasian water-milfoil (EWM) through chemical treatment, EWM biological control methods, hand removal, and preventative measures in Kettle Moraine Lake during the period 2009 - 2011. The project elements and deliverables are specified in Fondulac County's Land and Water Department Aquatic Invasive Species Grant application, dated August 1, 2008. The project includes monitoring the extent and density of CLP and EWM annually through pre-treatment and post-treatment surveys of known infested areas, and monitoring other lake areas for the presence of aquatic invasive species (AIS); treating CLP infested areas with an aquatic herbicide; conducting hand-removal of CLP and EWM; and conducting volunteer activities to prevent further AIS infestations, including conducting watercraft inspections. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database. Annual progress reports and a final report summarizing the five-year project will be provided to DNR.

If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Control
Date
10/1/2012
Waters Involved
Kettle Moraine Lake
Status
Complete

Kettle Moraine Lake Association: Kettle Moraine Lake Ais Control & Prevention: Kettle Moraine Lake Association, Inc. proposes to continue the management of both curly-leaf pondweed (CLP) and Eurasian water milfoil (EWM) in Kettle Moraine Lake and prevent the spread of aquatic invasive species (AIS). Specifically, Kettle Moraine Lake Association will monitor CPL and EWM populations within Kettle Moraine Lake to create annual refined treatment strategies and determine program effectiveness, conduct large-scale herbicide treatments of CLP and smaller treatments of EWM, monitor herbicide concentrations, conduct whole-lake point-intercept and community mapping surveys, introduce native aquatic plants, and continue Clean Boats Clean Waters watercraft inspections and volunteer-based AIS monitoring and hand removal in Kettle Moraine Lake. An updated aquatic plant management plan will also be developed. The project elements and deliverables are specified in the grant application materials submitted to the Department dated August 1, 2012.


Grant Details
Aquatic Invasives Control
Date
4/15/2019
Waters Involved
Kettle Moraine Lake
Status
Complete

Kettle Moraine Lake Association: Kml Ewm Population Mgmt & Monitoring 2019-21: Kettle Moraine Lake Association is sponsoring a project to monitor and control Eurasian water milfoil (EWM) population on a lake-wide basis.

Project final deliverables include: all data collected and AIS monitoring and control strategy assessment reports.

Specific project activities include: 1) Plan a large-scale liquid triclopyr herbicide treatment on Kettle Moraine Lake in 2019 which includes a pre-treatment qualitative survey, temperature profile measurements, and a narrative report outlining the finalized control strategy; 2) Implement the herbicide treatment following the recommendations; 3) Conduct herbicide concentration monitoring; 4) Conduct native aquatic plant and EWM population monitoring during the year of treatment (2019) and two years after treatment (2020 and 2021); 5) Conduct 200 hours annually of Clean Boats Clean waters watercraft inspections; 6) Conduct volunteer-based surveillance monitoring for EWM in 2020 and 2021; 7) Conduct EWM population monitoring following treatment to determine and implement follow-up control measures such as diver assisted suction harvesting; and 8) Develop annual AIS monitoring and control strategy assessment reports.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Long Lake
Status
Complete

Fdl Long Lake Preservation Assn: Long Lake Habitat Restoration Project: The Long Lake Preservation Association proposes to: control Curly Leaf Pondweed (CLP) and Eurasian Watermilfoil (EWM) through chemical treatment in the waters of Long and Tittle Lakes, during the period 2011 - 2013. The project elements and deliverables are specified in the Long Lake Preservation Association\2019s Aquatic Invasive Species Grant application, dated July 29, 2010. The project includes: conducting pre- and post-treatment surveys to monitor the presence of CLP and EWM; treating CLP and EWM infested areas in waters of Long Lake and Tittle with aquatic herbicide(s); conducting watercraft inspections; participating in the Citizen Lakes Monitoring Network; and mailing educational information to Association members. Any persons conducting watercraft inspections or participating in the Citizen Lake Monitoring Network will enroll in a current Clean Boats Clean Waters workshop or Citizen Lake Monitoring Network workshop. Watercraft inspection and Citizen Lake Monitoring records will be entered into the State\2019s online Watercraft Inspection Database (SWIMS). Any publications or signs produced as part of this project will incorporate the \201CStop Aquatic Hitchhikers!\201D\2122 brand (partnership details are at http://www.protectyourwaters.org). Annual progress reports and a final report summarizing the three-year project will be provided to DNR. If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee\2019s final payment request.


Grant Details
Aquatic Invasives Control
Date
4/15/2015
Waters Involved
Long Lake
Status
Complete

Fdl Long Lake Preservation Assn: Fdl Long Lake Ais Monitoring & Control: FDL Long Lake Association proposes to continue to monitor and control aquatic invasive species (AIS) on a lake-wide basis in Long Lake through 2018. The project will include: qualitative evaluations where the entire littoral zone of Long Lake would be searched for AIS, quantitative evaluations before and after treatments, chemical treatment of AIS, two years of volunteer-based herbicide concentration monitoring, professional hand-harvesting of AIS, assessment of mechanical harvesting operation, acoustic survey, whole-lake point-intercept survey, stakeholders survey, 200 hours per year of Clean Boats/Clean Waters monitoring, public and committee meetings, annual AIS monitoring and control strategy assessment reports, and development of an updated aquatic plant management plan which will include a harvesting plan. Long Lake will submit a final report summarizing the project to the Department. The project elements and deliverables will be completed as described in the project proposal submitted to the Department and dated January 28, 2015.


Grant Details
Aquatic Invasives Early Detection and Response
Date
1/1/2011
Waters Involved
Forest Lake
Status
Complete

Forest Lake Improvement Association: Forest Lake Hybrid Milfoil Treatment Project: The Forest Lake Improvement Association proposes to: control Hybrid Eurasian water-milfoil (HEWM) through chemical treatment in the waters of Forest Lake, during the period 2011 2014. The project elements and deliverables are specified in the Forest Lake Improvement Association\2019s project proposal dated December 6, 2010. The project includes: conducting pre- and post-treatment surveys according to established DNR Early Response protocols; treating HEWM infested areas in waters of Forest Lake with aquatic herbicide(s); and mailing educational information to Association members. Any publications or signs produced as part of this project will incorporate the \201CStop Aquatic Hitchhikers!\201D\2122 brand (partnership details are at http://www.protectyourwaters.org). Annual progress reports and a final report summarizing the four-year project will be provided to DNR. If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee\2019s final payment request.


Grant Details
Aquatic Invasives Early Detection and Response
Date
5/1/2007
Waters Involved
Long Lake
Status
Complete

Fond Du Lac County: Fond Du Lac County Long Lake Long Term Ais Control Project: The FonduLac County Land Water Conservation Department (LWCD) proposes to manage Eurasian water-milfoil (EWM) in Long Lake by implementing control and prevention measures during the period 2007-2009. Te project elements and deliverables are specified in the Long Lake FonduLac County Aquatic Invasive Species Rapid Response Grant application, dated May 1, 2007. The project includes conducting pre-and post-treatment surveys and mapping the extent of EWM; controlling EWM with aquatic herbicide treatments; training volunteers to conduct post-treatment assessments and conducting those assessments to determine treatment efficacy; training volunteers to monitor for aquatic invasive species (AIS) and conducting those surveys; educating volunteers about AIS prevention measures through "Clean Boats Clean Water" (CBCW) program; and educating residents about AIS prevention measures through newsletters, mailing, signage, and/or meetings. Annual progress reports and a final report summarizing the three year project will be provided to the DNR.

If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic.pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/30/2015
Waters Involved
Silver Lake (Paradise Valley)
Status
Complete

Washington County: Containment & Suppression Of Starry Stonewort: Washington County Planning and Parks Division, in partnership with the Silver Lake Protection and Rehabilitation District and the Wisconsin Department of Natural Resources, will undertake a rapid response project on Silver Lake to control and potentially eradicate Starry Stonewort, listed in NR 40 as a prohibited species. The project will include hand pulling by snorkeling and diving; DASH (Diver Assisted Suction Harvesting); Clean Boats, Clean Waters boat inspections at the public launch and the Yacht Club launch; a Fall 2015 P/I plant survey; meandering shoreline snorkel plant survey; extra signage at launches and potentially a chemical treatment. The project deliverable will be a report containing the results of each hand pulling event; results of the DASH event, results of any chemical treatments (if applicable), a summary of the Clean Boats, Clean Waters accomplishments, all raw data from plant surveys and maps from each of the plant surveys. All Clean Boats, Clean Waters data must be entered in the statewide SWIMS database.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Allis Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Allis Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Amy Bell Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Amy Bell Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Bark Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Bark Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Barton Pond
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Barton Pond
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Beaver Dam Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Beaver Dam Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Beck Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Beck Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Boltonville Millpond
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Boltonville Millpond
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Brickyard Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Brickyard Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Cedar Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Cedar Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Druid Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Druid Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Ehne Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Ehne Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Erler Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Erler Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
2/15/2017
Waters Involved
Forest Lake
Status
Complete

Forest Lake Improvement Association: Forest Lake Management Plan Update: The Forest Lake Improvement Association, Inc. is sponsoring a project to update their Comprehensive Lake Management Plan and continue to monitor hybrid watermilfoil following the 2016 whole-lake herbicide treatment.

Project final deliverables include: all data collected, agendas and minutes for planning meetings, and a lake management plan that includes methodologies, results, and management alternatives discussion with an implementation plan.

Specific project activities include: 1) Water quality and watershed assessment and modeling; 2) Fisheries data compilation and integration within the management plan; 3) Shoreline and coarse woody habitat assessment; 4) Collect advanced sonar data on Forest Lake; 5) Assessment of the current aquatic plant community; 6) Professional Dreissena mussel monitoring; 7) Completion of stakeholders survey; 8) Public participation in the planning process; 9) Volunteer aquatic invasive species monitoring; 10) Conduct approved alternative Clean Boats Clean Waters watercraft inspection program; 11) Creation of an updated comprehensive lake management plan that includes an implementation strategy.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Forest Lake
Status
Complete

Forest Lake Improvement Association: Forest Lake 2025 Apm Plan Update: The Forest Lake Improvement Association is sponsoring a project to update the Aquatic Plant Management (APM) Plan for Forest Lake.

Activities: 1) Collect current aquatic plant data on Forest Lake which includes whole-lake point-intercept surveys in 2024 and 2025, and a late-season EWM mapping survey; 2) Increase stakeholder buy-in, understanding, and input through participation in planning project. This includes a stakeholder survey and two planning meetings; 3) Development of a realistic and implementable Aquatic Plant Management Plan with specific focus on acceptable EWM management strategies.

Deliverables: 1) all data collected 2) agendas and minutes from planning meetings 3) an APM plan that includes methodologies, results, and management alternatives discussion with an implementation plan.

Conditions:
1) All data shall be entered into the SWIMS database under the grant project number.
2) Draft stakeholder survey must be reviewed and approved by the Department before being initiated.
3) Aquatic plant monitoring shall follow DNR approved protocols.
4) WDNR\2019s Aquatic Plant Management in Wisconsin guidance shall be followed for aquatic plant monitoring and aquatic plant management plan development.

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Friess Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Friess Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Gilbert Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Gilbert Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Green Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Green Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Hartford Millpond
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Hartford Millpond
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Hasmer Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Hasmer Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Hawthorn Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Hawthorn Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Hickey Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Hickey Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Keowns Pond
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Keowns Pond
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
2/15/2017
Waters Involved
Kettle Moraine Lake
Status
Complete

Kettle Moraine Lake Association: Kettle Moraine Lake Management Plan Update: The Kettle Moraine Lake Association, Inc. is sponsoring a project to update their Comprehensive Lake Management Plan.

Project final deliverables include: all data collected, agendas and minutes for planning meetings, and a lake management plan that includes methodologies, results, and management alternatives discussion with an implementation plan.

Specific project activities include: 1) Water quality and watershed assessment and modeling; 2) Fisheries data compilation and integration within the management plan; 3) Shoreline and coarse woody habitat assessment; 4) Assessment of the current aquatic plant community; 5) Completion of stakeholders survey; 6) Public participation in the planning process; 7) Volunteer aquatic invasive species monitoring; 8) Conduct at least 200 hours per year of Clean Boats Clean Waters watercraft inspections; 9) Creation of an updated comprehensive lake management plan that includes an implementation strategy.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist


Grant Details
Aquatic Invasives Education
Date
3/15/2023
Waters Involved
Kettle Moraine Lake
Status
Complete

Kettle Moraine Lake Association: Kettle Moraine Lake 2023 Ewm Management Project: Kettle Moraine Lake Association proposes to continue to assess the aquatic plant community in Kettle Moraine Lake in 2023 and 2024, create annual reports and provide the results to the general public through outreach meeting.

Project final deliverables include: Annual monitoring reports with maps that discuss the survey results as well as possible control strategies for the following year.

Specific project activities include: 1) Conduct whole-lake point-intercept aquatic plant surveys in 2023 and 2024; 2) Conduct whole-lake late-season Eurasian watermilfoil mapping surveys in 2023 and 2024; 3) Create annual monitoring reports with maps that discuss the survey results as well as possible control strategies for the following year; 4) Conduct a strategic planning committee meeting; 5) conduct a general public project results meeting.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Kohlsville Millpond
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Kohlsville Millpond
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Lake Five
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Lake Five
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Lake Lenwood
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Lake Lenwood
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Lake Twelve
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Lake Twelve
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Lehner Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Lehner Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Lent Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Lent Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Little Cedar Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Cedar Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Little Drickens Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Drickens Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Little Friess Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Friess Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Loew Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Loew Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Lohr Pond
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Lohr Pond
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2014
Waters Involved
Long Lake
Status
Complete

Fdl Long Lake Preservation Assn: Fdl Long Lake Pres. Ass. Mgmt Plan: Long Lake Preservation Association proposes to develop a comprehensive lake management plan including a harvesting plan for Long Lake, Fond du Lac County. The project elements and deliverables are specified in the Long Lake Aquatic Invasive Species grant application dated February 1, 2014. The project includes:
1. Provide for stakeholder participation and education by holding meetings and soliciting input via surveys.
2. Conducting at least 200 hours of boat landing watercraft inspections following CB/CW program.
3. Volunteer AIS surveillance monitoring with data entered in SWIMS.
4. Shoreland condition and coarse woody habitat assessment.
5. Watershed definition and phosphorus load modeling.
6. Water quality monitoring to assess lake condition.
7. Assess the aquatic plant community utilizing early-season and point-intercept surveys and aquatic plant community mapping.
8. Fisheries data integration into the final report.
9. Completion of a comprehensive lake management plan including a harvesting plan for Long Lake.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Long Lake
Status
Complete

Fdl Long Lake Preservation Assn: Long Lake Fdl 2025 Apm Plan Update: The FDL Long Lake Preservation Association, Inc. is sponsoring a project to update the Aquatic Plant Management (APM) Plan for Long and Tittle Lake.

Activities: 1) Collect aquatic plant data on Long and Tittle Lakes which includes a lake-wide point-intercept survey, an early season (CLP) and a late-season (EWM) mapping survey; 2) Increase stakeholder buy-in, understanding, and input through participation in planning project. This includes a stakeholder survey and three planning meetings; 3) Development of a realistic and implementable Aquatic Plant Management Plan with specific focus on an acceptable mechanical harvesting plan.

Deliverables: 1) all data collected 2) agendas and minutes from planning meetings 3) an APM plan that includes methodologies, results, and management alternatives discussion with an implementation plan.

Conditions:
1) All data shall be entered into the SWIMS database under the grant project number.
2) Draft stakeholder survey must be reviewed and approved by the Department before being initiated.
3) Aquatic plant monitoring shall follow DNR approved protocols.
4) WDNR\2019s Aquatic Plant Management in Wisconsin guidance shall be followed for aquatic plant monitoring and aquatic plant management plan development.
5) Public participation must include local interest groups beyond riparian property owners.

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Lucas Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Lucas Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Malloy Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Malloy Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Mayfield Pond (Schwietzer)
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Mayfield Pond (Schwietzer)
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
McConville Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
McConville Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Miller Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Miller Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Monches Millpond
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Monches Millpond
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Mud Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Mud Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Mueller Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Mueller Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Murphy Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Murphy Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Newburg Pond
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Newburg Pond
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Paradise Valley Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Paradise Valley Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Pike Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Pike Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Proschinger Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Proschinger Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Quas Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Quas Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Radtke Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Radtke Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Rockfield Quarry Pond
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Rockfield Quarry Pond
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Schwietzer Pond
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Schwietzer Pond
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Silver Lake (Paradise Valley)
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Silver Lake (Paradise Valley)
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Smith Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Smith Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Tilly Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Tilly Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Unnamed
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Unnamed
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Wallace Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Wallace Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Werner Pond
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Werner Pond
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Silver Lake (Paradise Valley)
Status
Complete

Silver Lake P & R District: Silver Lake Protection And Rehabilitation District 2016 Clean Boats Clean Waters: The Silver Lake Protection and Rehabilitation District is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Silver Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2018
Waters Involved
Silver Lake (Paradise Valley)
Status
Complete

Silver Lake P & R Dis: Silver Lake P & R Dis 2018 Cbcw: Silver Lake P & R Dis is sponsoring a Clean Boats Clean Waters project in 2018 at 1 single public boat landings and 0 public boat landing pairs on SILVER LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Silver Lake (Paradise Valley)
Status
Complete

Silver Lake P & R District: Silver Lake P & R District 2020 Cbcw: Silver Lake P & R District is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 0 public boat landing pairs on SILVER LAKE (HENSCHKE HILL SIDE, N/A).


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Alderley Millpond
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Allis Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Allis Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Amy Bell Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Amy Bell Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Bark Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Bark Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Barton Pond
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Barton Pond
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Beaver Dam Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Beaver Dam Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Beaver Dam Lake
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Beaver Dam Lake
Status
Complete

Beaver Dam Lake Improvement Association: Hlk-Beaver Dam Healthy Lake: Beaver Dam Lake District will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan. Practices include: 350 ft2 native plantings, rain gardens, rock infiltration practices, and diversion practices on 5 lakeshore properties, including the City of Beaver Dam\2019s Edgewater Park.
The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #17. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #16 is required.
The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.
Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
4/15/2016
Waters Involved
Beaver Dam Lake
Status
Complete

Beaver Dam Lake Improvement Association: Hlk- 319 Match - Beaver Dam Lake Healthy Lake Phase 2: BDLIAt will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan. Best practices will be designed and installed according to the Healthy Lakes fact sheets and technical guidance. Activities include: implementation of fish sticks, 350 square feet native plantings, diversion practices, infiltration practices, and/or rain gardens on 3 properties.
The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #16. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #16 is required.
The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.
Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Beck Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Beck Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Boltonville Millpond
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Boltonville Millpond
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Brickyard Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Brickyard Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
2/7/1993
Waters Involved
Cedar Lake
Status
Complete

Cedar Lakes Conservation Foundation: Acq-Big Cedar Lake Land Acquisition - Jj Dockers Property: The Cedar Lakes Conservation Foundation, Inc. will acquire approximately 1.997 acres of land situated on the northwest shoreline of Big Cedar Lake in the town of West Bend, to reduce sedimentation and nutrient flows to the lake and to provide a safe public access to the lake. The primary goals of the property's management plan are to 1) construct and maintain a stormwater detention pond to filter pollutants flowing into the lake and 2) to develop a safe public boating access to Big Cedar Lake.


Grant Details
Lake Protection Grant
Date
3/1/1996
Waters Involved
Cedar Lake
Status
Complete

Cedar Lakes Conservation Foundation: Acq-Big Cedar Lake Land Acquisition - Hembel Property: The Cedar Lakes Conservation Foundation will acquire 103 acres of land situated within a major subwatershed of and that drains toward Big Cedar Lake. The stream that passes through the property has been identified as a major source of nonpoint pollution responsible for cropland sediment loading to the lake. The primary goals of the property's management plan are (1) existing wooded portions of the land will be preserved in their natural state (2) certain wetland areas will be restored; lands associated with the stream, buffer strips, and grassed waterways will be maintained and managed by the lake district and (3) rental of existing croplands will be conditioned on the implementation of practices contaiend in the LCD cropland management plan. Croplands no longer rented for agricultural purposes will be planted in native species of grasses, shrubs, and trees. Eligible costs aer outlined on the attached Cost Estimate Worksheet.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Cedar Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Cedar Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Chub Lake
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Collins Lake
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Crystal Lake
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Crystal Spring
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Danville Millpond
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Druid Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Druid Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Ehne Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Ehne Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Erler Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Erler Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1999
Waters Involved
Forest Lake
Status
Complete

Forest Lake Improvement Association: Res-Forest Lake Milfoil Biocontrol Project: The Forest Lake Improvement Assn proposes to utilize biological control of the Eurasian Water Milfoil by using the native beetle, Euhrychiopsis lecontei (milfoil weevil). This control will consequently help to prevent the spreading of EWM into the 10 nearby lakes. The project will include quantitative data measurements of the EWM areas where the weevils will be introduced and will include milfoil stems/m2, and weevils/m2, stem heights and plant contions. The cultured weevils will be introduced into Forest Lake in the form of eggs and larvae attached to healthy disease-free milfoil cuttings in all infested milfoil areas. the results of the project will be published mid-term and annually and will be provided to all property owners on the lake, the Association, DNR and other grant sources. Information will also be disseminated via newsletters, meetings and press releases.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Fox Lake
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Fox Lake
Status
Complete

Fox Lake Inland Lake P & R District: Lmi-Fishery Mgt & Bio-Manipulation Project: Fox Lake Inland Lake Protection & Rehabilitation District will work to reduce rough fish populations in a continuing attempt to increase abundance of rooted aquatic plants. Progress will also be monitored via a comprehensive fish survey of Fox Lake.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.

Scope Amendment January 19, 2005 - remove: rough fish harvest activities from the grant. add: tributary and lake monitoring, SLOH costs associated with that monitoring, completion of an evaluation report of that monitoring. Dollar amount of the grant remains the same. PRS

Scope Amendment: 11/3/06: Expand the lake water quality evaluation project to include preparation of a mgmt. plan for the next phase of the Fox Lake Mgmt. Project. Dollar amount of the grant remains the same. ET


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Friess Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Friess Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Gilbert Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2000
Waters Involved
Gilbert Lake
Status
Complete

Big Cedar Lake Protection & Rehab. District: Acq-Fritsche Conservancy Area-Big Cedar Lake: Land acquisition of approximately 43 acres, currently in agricultural use. For the purpose of installing sedimentation basins and native grasses, shrubs, and trees that will eliminate what has been a persistent source of nonpoint pollution entering Gilbert Lake.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Gilbert Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Green Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Green Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Hartford Millpond
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Hartford Millpond
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Hasmer Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Hasmer Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Hawthorn Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Hawthorn Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Hickey Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Hickey Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Kekoskee Millpond
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Keowns Pond
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Keowns Pond
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Kohlsville Millpond
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Kohlsville Millpond
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Lake Emily
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Lake Five
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Lake Five
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Lake Lenwood
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Lake Lenwood
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Lake Twelve
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Lake Twelve
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
5/25/1995
Waters Involved
Lake Winnebago
Status
Complete

Fond Du Lac County: Acq-Fond Du Lac County Camp Shaganappi Acquisition: Fond du Lac County shall participate in the Lake Protection Grant Program by purchasing 97.2 acres of land for public outdoor recreation purposes.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Lehner Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Lehner Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Lent Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Lent Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Little Cedar Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Little Cedar Lake
Status
Complete

Washington County: Acq-Little Cedar Lake Park - Ackerman Acquisition Project: Washington County will acquire 62.94 acres of land on Little Cedar Lake for lake protection and to provide public boat access. The parcel will be developed into a county park complete with hiking trails, cross country skiing, sledding hill, swim area, beach, volleyball courts, picnic tables, detention pond, parking and bathroom facilities.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Little Cedar Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Little Drickens Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Little Drickens Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Little Friess Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Little Friess Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Loew Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Loew Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Lohr Pond
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Lohr Pond
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Lomira Pond
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Lost Lake
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Lowell Millpond
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Lower Mayville Pond 174
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Lucas Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Lucas Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Malloy Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Malloy Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Mayfield Pond (Schwietzer)
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Mayfield Pond (Schwietzer)
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
McConville Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
McConville Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Miller Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Miller Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Monches Millpond
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Monches Millpond
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Mud Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Mud Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Mud Lake
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Mueller Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Mueller Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Murphy Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Murphy Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Neosho Mill Pond
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Newburg Pond
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Newburg Pond
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Paradise Valley Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Paradise Valley Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Pike Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Pike Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Proschinger Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Proschinger Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Quas Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Quas Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Radtke Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Radtke Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Rockfield Quarry Pond
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Rockfield Quarry Pond
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Schwietzer Pond
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Schwietzer Pond
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Silver Lake (Paradise Valley)
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Silver Lake (Paradise Valley)
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Sinissippi Lake (Hustisford)
Status
Complete

Village Of Hustisford: Lmi-Df-Stream Flow & Wq Monitoring Of Lk Sinissippi: In this project, Lake Sinissippi Association will perform stream monitoring and data analysis in order to better understand the lake.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Sinissippi Lake (Hustisford)
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Smith Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Smith Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Theresa Marsh Flowage
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Tilly Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Tilly Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Un Spring
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
3/5/1996
Waters Involved
Unnamed
Status
Complete

Sheboygan County: Acq-Gerber Lakes Land Acquisition - Hayes Property: Sheboygan County will acquire 108.9 acres of land located in Section 35, Town of Rhine at the eastern edge of Wisconsin's Kettle Morraine for lake protection and public outdoor recreation purposes. The property includes three lakes - Big Gerber, Little Gerber, and a 1+ acre spring pond that are part of the Sheboygan River Watershed. The primary goals of the property's management plan are (1) to permanently preserve and protect the diversity and uniqueness of the existing land cover including coniferous and deciduous forest, meadow, open water, and adjoining wetland. The approximately 25 acres of upland cropland area will be established in a permanent cover of native prairie and fruit bearing shrubs and trees to eliminate future erosion into the lakes and the adjoining Otter Creek, (2) to utilize the property for natural study and appreciation, outdoor skills training, and passive recreation and enjoyment. It is anticipated that the Sheboygan County Outdoor Skills Center will relocate to the existing farm residence and buildings on the property. Eligible costs are outlined on the attached Cost Estimate Worksheet.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Unnamed
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Unnamed
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Unnamed
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Upper Mayville Millpond 172
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Wallace Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Wallace Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Werner Pond
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Werner Pond
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Alderley Millpond
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
3/15/2021
Waters Involved
Auburn Lake
Status
Complete

Town Of Auburn: Comp - Auburn Lake Management Planning Project: The Town of Auburn in cooperation with Auburn Lake Homeowners Association is sponsoring a project to develop a Comprehensive Lake Management Plan for Auburn Lake.

Project final deliverables include: all data collected, agendas and minutes for planning meetings, and a lake management plan that includes methodologies, results, and management alternatives discussion with an implementation plan.

Specific project activities include: 1) In-Lake water quality monitoring; 2) Watershed assessment and modeling; 3) Sediment core collection & analysis; 4) Fishery data compilation and integration within management plan; 5) Shoreline and coarse woody habitat assessment; 6) Assess current aquatic plant community; 7) Collect and analyze multi-channel sonar data on Auburn Lake; 8) Completion of a stakeholder survey; 9) Public participation in the planning process; 10) Develop realistic and implementable comprehensive management plan for the Town of Auburn to manage Auburn Lake.

Special Conditions: 1) Draft sociological/user surveys must be reviewed and approved by the Department before being initiated.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
3/15/2021
Waters Involved
Auburn Lake Creek
Status
Complete

Town Of Auburn: Comp - Auburn Lake Management Planning Project: The Town of Auburn in cooperation with Auburn Lake Homeowners Association is sponsoring a project to develop a Comprehensive Lake Management Plan for Auburn Lake.

Project final deliverables include: all data collected, agendas and minutes for planning meetings, and a lake management plan that includes methodologies, results, and management alternatives discussion with an implementation plan.

Specific project activities include: 1) In-Lake water quality monitoring; 2) Watershed assessment and modeling; 3) Sediment core collection & analysis; 4) Fishery data compilation and integration within management plan; 5) Shoreline and coarse woody habitat assessment; 6) Assess current aquatic plant community; 7) Collect and analyze multi-channel sonar data on Auburn Lake; 8) Completion of a stakeholder survey; 9) Public participation in the planning process; 10) Develop realistic and implementable comprehensive management plan for the Town of Auburn to manage Auburn Lake.

Special Conditions: 1) Draft sociological/user surveys must be reviewed and approved by the Department before being initiated.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Beaver Dam Lake
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Chub Lake
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Collins Lake
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Crystal Lake
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Crystal Spring
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Danville Millpond
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
4/21/1993
Waters Involved
Forest Lake
Status
Complete

Forest Lake Improvement Association: Forest Lake Management Planning: Conduct water quality monitoring in 1994-96. Prepare a watershed management plan which will include a watershed map location of septic systems, an estimate of sediment and nutrient loading to the lake, and recommendations for non-point pollution controlmeasures. Conduct an aquatic plant survey. Conduct an experiment involving the removal of Eurasian watermilfoil and planting of Najas.conduct an opinion survey of property owners on and around the lake.Information will be disseminated to the public by newsletter, local newspaper articles, public meetings, and report mailings.


Grant Details
Large Scale Lake Planning
Date
3/31/1995
Waters Involved
Forest Lake
Status
Complete

Forest Lake Improvement Association: Forest Lake Eurasian Watermilfoil Elimination Study: Test the feasibility of using portable plant screens to eliminate Eurasian Milfoil islands. Information will be disseminated to the public by newsletter, public meetings, and summary report mailings.


Grant Details
Large Scale Lake Planning
Date
4/1/1996
Waters Involved
Forest Lake
Status
Complete

Forest Lake Improvement Association: Forest Lake Eurasian Watermilfoil Eradication Study: The Forest Lake Improvement Association proposes to expand a research project involving submersible frame assemblies to eradicate Eurasian Watermilfoil. Project activities will include treatment of an area of Eurasian Watermilfoil followed by transplanting area treated with native aquatic plants. The project will include 400 hours of donated labor ($2,000) as part of the local cost share. A final report will be prepared detailing 1) the methodology used, including construction design, time required for execution, application of screen and plant units, transplanting methods, 2) results obtained, including pre and post treatment plant species and densities (stem density) on test plots, 3) site descriptions, including depth and sediment type in test plots, and 4) problems encountered and recommendations to improve the overall process. A paper copy and an electronic copy of the final report will be provided to the Department of Natural Resources. Information about the project's results will be disseminated to the public by newsletter, entire report mailing, and public meeting. end.


Grant Details
Large Scale Lake Planning
Date
4/1/2001
Waters Involved
Forest Lake
Status
Complete

Forest Lake Improvement Association: Forest Lake High Ph & Weevil Egg Stugy: The Forest Lake Improvement Association proposes to conduct an investigation as to whether sudden exposure of weevil eggs to elevated pH is the limiting factor preventing successful biological control of Eurasian Watermilfoil. The aquatic weevil Euhrychiopsis lecontei will be used. The project's goals will be to accurately measure pH levels in Forest Lake within all milfoil beds throughout the growing season; conduct lab analysis of lake water and milfoil plants; conduct lab cultures of weevils utilizing lake water and milfoil plants; and conduct weekly lab analysis of weevils in all life forms, after introduction into the lake. A final report of the project results will be submitted to all property owners on Forest Lake, the Association members, and the DNR. The gathered data and final report will also be provided in electronic form and on computer disc. Results will also be disseminated via newsletters, at meetings, and press releases.


Grant Details
Large Scale Lake Planning
Date
4/1/2004
Waters Involved
Forest Lake
Status
Complete

Forest Lake Improvement Association: Forest Lake Watershed & Lake Management Plan: The Forest Lake Improvement Assn proposes to conduct a project focused on developing a comprehensive appraisal and plan document, to include:

1. 2 year Water Quality appraisal via USGS procedure
2. An aquatic plant survey including mapping of EWM and ID of all species
3. Nutrient Budget including watershed modeling for P delivery
4. Lake sediment characterization
5. Community survey of shore owners and lake users
6. Prepare a final report (Lake Management Plan) .
Specific actions are identified within the original planning grant proposal


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Fox Lake
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Kekoskee Millpond
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Lake Emily
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Lomira Pond
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
4/16/1992
Waters Involved
Long Lake
Status
Complete

Long Lake Fishing Club, Inc.: Long Lake Management Plan: Collect existing lake data and reports on lake. Incorporate recommendations of previouslu completed reports into a lake management plan.Information will be disseminated to the public by newsletter, local newspaper articles, summary report, and the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1997
Waters Involved
Long Lake
Status
Complete

Long Lake Fishing Club, Inc.: Long Lake Aquatic Plant Protection Study: The Long Lake Fishing Club proposes to study the effect of an extended no wake zone and no motor zones on protecting the aquatic plant community in Long Lake.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Lost Lake
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Lowell Millpond
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Lower Mayville Pond 174
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Mud Lake
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Neosho Mill Pond
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/18/1994
Waters Involved
Silver Lake (Paradise Valley)
Status
Complete

Silver Lake P & R District: Silver Lake Management Planning: Identify citizen concerns and lake usage by a questionnaire survey of lake residents. Conduct water chemistry analysis, an aquatic plant survey, groundwater quality analysis and an inventory of sediment type and distribution. Assess lake usage and landusage and develop a lake management plan based on the information obtained in tasks listed above. The grantee will disseminate information to the public by newsletter, fact sheets, entire report mailings, and public meetings. Project results will bereposited at the Town of West Bend Town Hall and the West Bend Public Library.


Grant Details
Large Scale Lake Planning
Date
11/1/1999
Waters Involved
Silver Lake (Paradise Valley)
Status
Complete

Silver Lake P & R District: Silver Lake Groundwater Investigation: Silver Lake Protection & Rehabilitation District proposes a groundwater study to determine if groundwater is contributing significantly to the sediment loading in Silver Lake. USGS will do the study with SEWRPC support. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.

Scope Change 10-31-03: With the above report from SEWRPC combine it with an Aquatic Plant Study and SEWRPC Memorandum Report No. 123 ( A Lake Protection & Recreation Use Plan for Silver Lake) into a new combined plan at no additional costs to the present grant.


Grant Details
Large Scale Lake Planning
Date
2/15/2015
Waters Involved
Silver Lake (Paradise Valley)
Status
Complete

Silver Lake P & R Dis: Lake Protection Plan For Silver Lake: The Silver Lake P&R District will hire a contractor to conduct a point intercept plant survey and update the aquatic plant management plan. The project deliverable will be a plan that contains the following elements: 1) Raw data from the plant survey (to be provided electronically) ; 2) maps showing the distribution and density of each aquatic plant found in the survey; 3) an updated aquatic plant management plan discussing chemical, manual harvesting and appropriate mechanical harvesting options; 4) watershed analysis; 5) ground-watershed analysis; 6) water quality assessment; 7) sediment depth mapping; 8) summary air photo with specific recommendations for watershed and ground-watershed projects and 9) a specific action plan to implement recommendations. Additional details regarding the project deliverables are outlined in section E of the project grant application. A draft report should be provided to the Department for review before finalizing the plan. Two paper copies and 1 electronic copy of the final plan should be provided to the Department upon project completion.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Sinissippi Lake (Hustisford)
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Theresa Marsh Flowage
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Un Spring
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Unnamed
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Upper Mayville Millpond 172
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Small Scale Lake Planning
Date
4/1/2003
Waters Involved
Kettle Moraine Lake
Status
Complete

Kettle Moraine Lake Association: Kettle Moraine Lake Apm Study: The Kettle Moraine Lake Association proposes to conduct an aquatic plant appraisal and plan development with emphasis on the effects of a scheduled treatment of Eurasion Water Milfoil . This aquatic plant appraisal will include the following: Watershed overview; overview discussion of plant ecology; lake specific overview of practical techniques for plant managaement; issue, problems, and challenges; goals and objectives; strategy; plant mapping; information and education; plant surveys;and a contingency plan.

A final report will be provided both in hard copy form and electronic form. Refer to grant application and lake coordinator for further requirements.


Grant Details
Targeted Runoff - Urban Construction
Date
1/1/2002
Waters Involved
Milwaukee River
Status
Complete

City Of West Bend Engineering: Municipal Garage Snow Storage Lot: to provide 70% c-s for constructing a snow storage lot and wet detention pond at the Municipal Garage lot.


Grant Details
Urban Nonpoint - Stormwater Construction
Date
1/1/2002
Waters Involved
Quas Creek
Status
Complete

City Of West Bend Engineering: Quaas Creek Pollution Reduction Project: To cost-share @ 50% retrofit of dry pond to wet detention basin


Grant Details
River Planning Grant
Date
7/1/2006
Waters Involved
Milwaukee River
Status
Complete

Ozaukee Washington Land Trust: Communication, Outreach Planning & Development: The planning grant is to increase organizational capacity and improve their products and services. The mission is to protect, restore, and sustain the ecosystem in the watershed through funding and facilitation of a regional network of locally initiated projects. The river grant money will be used to market and develop long-term financial independence. Future funds will be used to supply grant money to other organizations for watershed improvements projects.

The DNR will be provided with two paper copies and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
River Planning Grant
Date
2/15/2017
Waters Involved
Milwaukee River
Status
Complete

Milwaukee Riverkeeper: Monitoring Water Quality For The Milwaukee River Basin Tmdl: Milwaukee Riverkeeper is undertaking a project to conduct and guide water quality monitoring throughout the Milwaukee River Basin, utilizing citizen volunteers. The collected data will support implementation efforts associated with the Milwaukee River Basin TMDL.

Milwaukee Riverkeeper will undertake the following activities: 1) Collect water samples to perform genetic sequencing, Total Phosphorus, E. coli, and Fecal Coliform tests on each. 2) Collect growing season Total Phosphorus water samples (according to WisCALM standards) throughout the watershed. 3) Where indicated by conductivity sensors, collect water samples for Chloride analysis. 4) Publish results in Milwaukee Riverkeeper\2019s Annual River Report Card. 5) Create a 3-5 year Strategic Monitoring Plan to inform future monitoring by Riverkeeper within the Milwaukee River Basin.

Project deliverables include: 1) Provide to the department a final report summarizing results of bacterial community and water sample analyses. 2) Data entry into SWIMS 3) Provide to the department a copy of the final Strategic Water Quality Monitoring Plan.

Special Conditions: 1) Donated professional services and volunteer lists and signatures shall be maintained for reporting in kind donations.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Rivers Biologist.


Grant Details
River Planning Grant
Date
7/1/2002
Waters Involved
Quas Creek
Status
Complete

Washington County Lcd: Quass Creek Watershed Education Program: Washington County will assist in development of a new river organization. Funds will lead the effort to create a private, non-profit Quaas Creek Watershed Protection Group, either as a stand-alone entity or by expanding an existing non-profit group. Information and education efforts for pollution control and land use planning in the watershed will be the primary focus.
Scope change 9/17/02: The Washington County Land Conservation Dept. will coordinate the implementation of a Quass Creek Watershed Education Program. This education program is part of a larger Watershed Protection Plan being developed by an intergovernmental committee called the Quass Creek Watershed Protection Committee. Information and education efforts for pollution control and land use planning in the watershed will be the primary focus. As a result of the project and its success, Washington Co. will assist in the development of a new river organization.. Funds will lead the effort to create a private, non-profit Quass Creek Watershed Protection Group, either as a stand-alone entity or by expanding an existing non-profit group.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
River Protection Grant
Date
7/1/2012
Waters Involved
Unnamed
Status
Complete

Ozaukee County: Restoration Of Aquatic Connectivity - Mineral Springs: Ozaukee County will remediate up to two large-scale and up to two non-structural impediments to fish and aquatic life passage. Conduct remediation of Division Road Crossing: The preliminary anticipated remediation of the Division Road crossing is to utilize a series of cross vanes (i.e., rock bands) into the channel to backwater the structure and incorporate native substrate to increase channel roughness and concentrate baseflow. This will eliminate the perching effect, while mitigate high velocities in spring and excessively shallow baseflow. Conduct remediation at Oakland Avenue: The preliminary anticipated remediation at Oakland Avenue is to remove the accumulated rubble and former abutments. These activities will eliminate channel constrictions and pervious fill issues, allowing for free ingress and egress of migratory fish species. Ozaukee County will complete all requisite reporting and provide project records.

The project deliverables include the following: 1) site photos (before, during, and after construction), and professionally engineered project plan sets (if required for permitting) indicating that key passage criteria (e.g., flow velocities, channel slope, etc.) were met. 2) detailed expenditure records, and any other items as requested. 3) project results from ongoing County education and outreach programs, including press releases, presentations at local, regional, and national conferences, articles in County and partner newsletters, and regular updates on the Program\2019s website, Facebook, and Twitter pages.


Monitoring & Projects

Projects including grants, restoration work and studies shown below have occurred in this watershed. Click the links below to read through the text. While these are not an exhaustive list of activities, they provide insight into the management activities happening in this watershed.

Grants and Management Projects
East and West Branches Milwaukee River Watershed
Watershed Recommendations
Best Management Practices, Implement
Sheboygan County Farm Nonpoint Source BMPs
Date
Status
This project is a landowner installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant.
3/13/2018
In Progress
Projects
 
Best Management Practices, Implement
West Bend - Stormwater Mgmt Plan & MS4 Permit Compliance
Date
Status
This project promotes nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: other new ordinances that affect runoff from the developed urban area; new storm water management plan for part of the developed urban area; and a new storm water management plan for new development.
1/1/2018
In Progress
Projects
 
Best Management Practices, Implement
Ozaukee County Barnyard Phosphorous Runoff Elimination
Date
Status
This project is a landowner installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Specifically, the grantee will implement: roofing to remedy discharges of manure, sediment and phosphorus in runoff entering waters of the state and address the following NR 151 Agricultural Performance Standards and Prohibitions: prevention of direct runoff from a feedlot or stored manure into waters of the state.
1/1/2017
In Progress
Projects
 
Best Management Practices, Implement
Port Washington Gateway Project
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Specifically, the municipality will construct/install a vegetated infiltration swale to remedy discharges of total suspended solids in urban runoff entering waters of the state.
1/1/2017
In Progress
Projects
 
Best Management Practices, Implement
Saukville - Storm Water Management Plan
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: updated construction erosion control ordinance, updated storm water ordinance for new development and re-development, new ordinances that affect runoff from the developed urban area, new feasibility analysis of alternative funding mechanisms, updated storm water management plan for the developed urban area, and updated storm water management plan for new development.
1/1/2016
In Progress
Projects
Documents
 
Best Management Practices, Implement
Watermark Project Permeable Pavement Installation
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Specifically, the municipality will construct/install a permeable pavement surface to remedy discharges of total suspended solids in urban runoff entering waters of the state.
1/1/2016
Cancelled
Projects
Documents
 
Best Management Practices, Implement
Washington Co Urban Storm Water Planning Project
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: updated construction erosion control ordinance, updated storm water ordinance for new development and re-development, updated ordinances that affect runoff from the developed urban area, new feasibility analysis of alternative funding mechanisms, new storm water management plan for the developed urban area, and new storm water management plan for new development.
1/1/2016
In Progress
Projects
Documents
 
Citizen-Based Stream Monitoring
 
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
4/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
 
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
4/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Monitor Fish Tissue
Confirm FCA: IW pre-2000 data
Date
Status
11/7/2011
Proposed
Projects
 
Monitor Fish Tissue
Confirm FCA: IW pre-2000 data
Date
Status
10/24/2011
Proposed
Projects
 
Monitor Water Quality or Sediment
Monitor Lake Fifteen Creek for Temperature
Date
Status
Station with temperature data is very close to lake outlet and likely warmer as a result. Please review. More temperature data needed in representative stream sections to determine impairment status
8/21/2019
Proposed
 
Monitor Water Quality or Sediment
GLPF2018_LM1802_ChlorideStudy
Date
Status
Chloride Impact Study for the Southeastern Wisconsin Region
6/1/2018
In Progress
Projects
 
Monitor Water Quality or Sediment
East Branch Milwaukee River Temp
Date
Status
More data collect, continuous monitoring, biology not showing impairment. AU: 5534185; ID: 10029682
5/1/2018
Proposed
Projects
 
Monitor Water Quality or Sediment
Milwaukee River TP
Date
Status
Category 5A. Biology is not being impacted based on data just upstream of this site. 2018 TP Results: May Exceed. Station: 10037390 AU: 481605.
1/1/2018
Proposed
Projects
 
Monitor Water Quality or Sediment
Kewaskum Creek TP
Date
Status
New Category 2 based on temperature. 2018 TP Results: may exceed. Station: 673125. AU: 10113.
1/1/2018
Proposed
Projects
 
Monitor Water Quality or Sediment
West Branch Milwaukee River
Date
Status
Monitor stream for temperature to confirm that it should not be listed.
5/1/2016
Proposed
Projects
 
Navigability Determination
 
Date
Status
NW S31 T14N R18E; West Branch Milw River, trib;
2/22/2005
Verify
Projects
 
Nine Key Element Plan
Fond du Lac County - Nine Key Element Plan Development
Date
Status
Great Lakes Nine Key Plan Development
6/1/2018
In Progress
Projects
Documents
 
Stormwater Planning, Implementation
TMDL Storm Water Control Practice Evaluation
Date
Status
Storm water planning activities will be undertaken by the municipality and will result in the following products: updated storm water management plan for the entire developed urban area; and an updated storm water management plan for new development.
1/1/2018
In Progress
Projects
 
Stormwater Planning, Implementation
Fond du Lac Co Stormwater Mgmt Plan - TMDL Analysis & Recs
Date
Status
This project promotes nonpoint source best management practices to contribute to the restoration of Wisconsin?s waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: updated storm water management plan for the entire developed urban area; and an updated storm water management plan for new development.
1/1/2018
In Progress
Projects
 
Stormwater Planning, Implementation
Citywide Water Quality Master Plan Update
Date
Status
Storm water planning activities will be undertaken by the municipality and will result in the following products: updated storm water management plan for the entire developed urban area.
1/1/2018
In Progress
Projects
 
Stormwater Planning, Implementation
Germantown Stormwater Quality Management Plan Update
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin?s waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: updated construction erosion control ordinance; updated storm water ordinance for new development and re-development; other updated ordinances that affect runoff from the developed urban area; updated storm water management plan for the entire developed urban area; and an updated storm water management plan for new development.
1/1/2018
In Progress
Projects
 
Stormwater Planning, Implementation
Taycheedah Stormwater Management Plan - TMDL Analysis & Recs
Date
Status
This project promotes nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: updated storm water management plan for the entire developed urban area; and an updated storm water management plan for new development.
1/1/2018
In Progress
Projects
 
Stormwater Planning, Implementation
Fond du Lac Stormwater Mgmt Plan - TMDL Analysis & Recs
Date
Status
This project promotes nonpoint source best management practices to contribute to the restoration of Wisconsin?s waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: updated storm water management plan for the entire developed urban area; and an updated storm water management plan for new development.
1/1/2018
In Progress
Projects
 
Stormwater Planning, Implementation
City of Plymouth Stormwater Planning
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin?s waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: new construction erosion control ordinance; new low impact development/conservation subdivision ordinance; new storm water ordinance for new development and re-development; other new ordinances that affect runoff from the developed urban area; and development and implementation of a new financing mechanism for funding the storm water program; and a new storm water management plan for the entire developed urban area.
1/1/2018
In Progress
Projects
 
Stormwater Planning, Implementation
City of Cedarburg TMDL Storm Water Control Practice Eval
Date
Status
Storm water planning activities will be undertaken by the municipality and will result in the following products: updated storm water management plan for the entire developed urban area; and an updated storm water management plan for new development.
1/1/2018
In Progress
Projects
 
Stormwater Planning, Implementation
City of Sheboygan Stormwater Management Plan Update
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin?s waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: updated storm water management plan for the entire developed urban area; and an updated storm water management plan for new development.
1/1/2018
In Progress
Projects
 
Stormwater Planning, Implementation
Grafton Stormwater Quality Management Plan Update
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin?s waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: updated construction erosion control ordinance; updated low impact development/conservation subdivision ordinance; updated storm water ordinance for new development and re-development; other updated ordinances that affect runoff from the developed urban area; updated storm water management plan for the entire developed urban area; and an updated storm water management plan for new development.
1/1/2018
In Progress
Projects
 
Stormwater Planning, Implementation
Eden MS4 Planning
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin?s waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: new construction erosion control ordinance, new storm water ordinance for new development and re-development, new ordinances that affect runoff from the developed urban area, new storm water management plan for the developed urban area, and new storm water management plan for new development.
1/1/2016
In Progress
Projects
Documents
 
Stormwater Planning, Implementation
Fond du Lac - TMDL Storm Water Plan
Date
Status
Storm water planning activities will be undertaken by the municipality and will result in the following products: updated construction erosion control ordinance, updated storm water ordinance for new development and re-development, updated ordinances that affect runoff from the developed urban area, new feasibility analysis of alternative funding mechanisms, updated storm water management plan for the developed urban area, and updated storm water management plan for new development.
1/1/2016
In Progress
Projects
Documents
 
Stormwater Planning, Implementation
Cedarburg City Wide Storm Water Quality Mgmt Plan Update
Date
Status
Storm water planning activities will be undertaken by the municipality and will result in the following products: updated construction erosion control ordinance, updated storm water ordinance for new development and re-development, updated ordinances that affect runoff from the developed urban area, updated feasibility analysis of alternative funding mechanisms, updated storm water management plan for the developed urban area, and updated storm water management plan for new development.
1/1/2016
In Progress
Projects
Documents
 
Stormwater Planning, Implementation
Slinger - Storm Water Management Planning
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant.
1/1/2015
In Progress
Projects
 
TMDL Development
Parsons Creek TMDL
Date
Status
Parsons Creek is currently being impacted by sediment, phosphorus, and ammonia. Due to excessive inputs of sediment and nutrients, Parsons Creek is experiencing degraded habitat, sedimentation, and aquatic toxicity due to high ammonia levels. On the 2006 303(d) Impaired Waters list, Parsons Creek is listed for the following: (1) Pollutants: Sediment, Nutrients (phosphorus, ammonia) (2) Impairments: Sediment, Degraded Habitat, Aquatic Toxicity (ammonia)
4/12/2016
In Progress
Projects
Documents
 
Train Volunteers to Do Watercraft Inspections
 
Date
Status
7/28/2011
Proposed
Projects
 
Train Volunteers to Monitor Lakes for Invasive Species
 
Date
Status
7/28/2011
Proposed
Projects
 
Water Quality Planning
River Basin Partnership Willow Creek
Date
Status
The impact of current and future land use on water quality conditions in Willow Creek are not well understood. Therefore, planning needs to be completed to help guide the types of BMP?s and management policies that will be needed to preserve and restore water quality and habitat in the watershed. The watershed plan can identify types of restoration and stream improvement projects that could be implemented.
12/21/2009
In Progress
Projects
 
East and West Branches Milwaukee River WatershedWatershed History Note

The Village of Kewaskum and the City of West Bend are located in the Watershed of the East and West Branches of the Milwaukee River. Before the arrival of European settlers in southeastern Wisconsin, the Potawatomi and Menominee Indians inhabited this area. The Village of Kewaskum was named for Chief Kewaskum of the Potowatomi tribe. In 1845, the Wisconsin Territorial Legislature authorized the building of a road to connect Fond du Lac and Milwaukee. Byron Kilbourn, one of the highway commissioners, and Jasper Vliet, a surveyor, were put in charge of determining the route the road would take and of identifying a good halfway point for travelers. The path they chose is now U.S. Route 45 and the rest stop is present-day West Bend. Because many people used the resting place, it evolved into a popular area. The Milwaukee River running through the town eventually played a major role in the city's history. It was because of the western bend in the river that West Bend got its name. The river also produced enough energy to power saw mills and gristmills. The railroad arrived in 1873, bringing with it more settlers and industrialization. At this time, West Bend saw a growth spurt, and in 1885 the city officially became an incorporated Wisconsin community. Today Kewaskum and West Bend are known at the Gateway to, and the Heart of, the Kettle Morraine State Forest.

Date  2011