Grant Details
Aquatic Invasives Early Detection and Response
Date
8/16/2010
Waters Involved
Dorn Creek
Status
Complete
City Of Middleton: Water Lettuce & Hyacinth: The City of Middleton proposes to manually remove the large population of water lettuce and minor population of water hyacinth from two detention ponds in Orchid Heights Park, Middleton, as well as a small number of plants that have been transported downstream into the Pheasant Branch Marsh. All plants larger than 2\201D in diameter will be removed to prevent viable seed production because there is a risk that the seeds could overwinter in microhabitats kept warm by groundwater fed springs through the winter. Education of local residents will also take place, and the sites will be monitored for these species in 2011.
Grant Details
Aquatic Invasives Early Detection and Response
Date
8/16/2010
Waters Involved
Graber Pond
Status
Complete
City Of Middleton: Water Lettuce & Hyacinth: The City of Middleton proposes to manually remove the large population of water lettuce and minor population of water hyacinth from two detention ponds in Orchid Heights Park, Middleton, as well as a small number of plants that have been transported downstream into the Pheasant Branch Marsh. All plants larger than 2\201D in diameter will be removed to prevent viable seed production because there is a risk that the seeds could overwinter in microhabitats kept warm by groundwater fed springs through the winter. Education of local residents will also take place, and the sites will be monitored for these species in 2011.
Grant Details
Aquatic Invasives Early Detection and Response
Date
4/1/2016
Waters Involved
Halfway Prairie Creek
Status
Complete
Dane County: Indian Lake Carp Removal: Dane County is sponsoring a project to complete a control project of common carp, that are a new (within 5 years) invader in Indian Lake, Dane County.
Project final deliverables include: The final report will include all data collected, and an analysis of the pre-and post-seining water quality and plants.
Specific project activities include: 1) Seining, counting and disposing of carp, 2) in-Lake water quality monitoring from May through October, 2016; and 3) monitoring plant response using sonar and digital mapping
Grant Details
Aquatic Invasives Early Detection and Response
Date
4/1/2016
Waters Involved
Indian Lake
Status
Complete
Dane County: Indian Lake Carp Removal: Dane County is sponsoring a project to complete a control project of common carp, that are a new (within 5 years) invader in Indian Lake, Dane County.
Project final deliverables include: The final report will include all data collected, and an analysis of the pre-and post-seining water quality and plants.
Specific project activities include: 1) Seining, counting and disposing of carp, 2) in-Lake water quality monitoring from May through October, 2016; and 3) monitoring plant response using sonar and digital mapping
Grant Details
Aquatic Invasives Early Detection and Response
Date
8/16/2010
Waters Involved
Lake Mendota
Status
Complete
City Of Middleton: Water Lettuce & Hyacinth: The City of Middleton proposes to manually remove the large population of water lettuce and minor population of water hyacinth from two detention ponds in Orchid Heights Park, Middleton, as well as a small number of plants that have been transported downstream into the Pheasant Branch Marsh. All plants larger than 2\201D in diameter will be removed to prevent viable seed production because there is a risk that the seeds could overwinter in microhabitats kept warm by groundwater fed springs through the winter. Education of local residents will also take place, and the sites will be monitored for these species in 2011.
Grant Details
Aquatic Invasives Early Detection and Response
Date
8/16/2010
Waters Involved
Pheasant Branch
Status
Complete
City Of Middleton: Water Lettuce & Hyacinth: The City of Middleton proposes to manually remove the large population of water lettuce and minor population of water hyacinth from two detention ponds in Orchid Heights Park, Middleton, as well as a small number of plants that have been transported downstream into the Pheasant Branch Marsh. All plants larger than 2\201D in diameter will be removed to prevent viable seed production because there is a risk that the seeds could overwinter in microhabitats kept warm by groundwater fed springs through the winter. Education of local residents will also take place, and the sites will be monitored for these species in 2011.
Grant Details
Aquatic Invasives Early Detection and Response
Date
8/16/2010
Waters Involved
Strickers Pond
Status
Complete
City Of Middleton: Water Lettuce & Hyacinth: The City of Middleton proposes to manually remove the large population of water lettuce and minor population of water hyacinth from two detention ponds in Orchid Heights Park, Middleton, as well as a small number of plants that have been transported downstream into the Pheasant Branch Marsh. All plants larger than 2\201D in diameter will be removed to prevent viable seed production because there is a risk that the seeds could overwinter in microhabitats kept warm by groundwater fed springs through the winter. Education of local residents will also take place, and the sites will be monitored for these species in 2011.
Grant Details
Aquatic Invasives Early Detection and Response
Date
8/16/2010
Waters Involved
Tiedemans Pond
Status
Complete
City Of Middleton: Water Lettuce & Hyacinth: The City of Middleton proposes to manually remove the large population of water lettuce and minor population of water hyacinth from two detention ponds in Orchid Heights Park, Middleton, as well as a small number of plants that have been transported downstream into the Pheasant Branch Marsh. All plants larger than 2\201D in diameter will be removed to prevent viable seed production because there is a risk that the seeds could overwinter in microhabitats kept warm by groundwater fed springs through the winter. Education of local residents will also take place, and the sites will be monitored for these species in 2011.
Grant Details
Aquatic Invasives Early Detection and Response
Date
8/16/2010
Waters Involved
Unnamed
Status
Complete
City Of Middleton: Water Lettuce & Hyacinth: The City of Middleton proposes to manually remove the large population of water lettuce and minor population of water hyacinth from two detention ponds in Orchid Heights Park, Middleton, as well as a small number of plants that have been transported downstream into the Pheasant Branch Marsh. All plants larger than 2\201D in diameter will be removed to prevent viable seed production because there is a risk that the seeds could overwinter in microhabitats kept warm by groundwater fed springs through the winter. Education of local residents will also take place, and the sites will be monitored for these species in 2011.
Grant Details
Aquatic Invasives Education
Date
10/1/2011
Waters Involved
Indian Lake
Status
Complete
Dane County: Aquatic Mgmt Plan Amendment: Dane County Office of Lakes and Watersheds will update Aquatic Plant Management (APM) Plans on the following lakes: Crystal, Fish, Indian, Lower Mud, Upper Mud, and the Yahara River between Lakes Monona and Kegonsa. All these waters are sources of established populations of Eurasian watermilfoil, among other exotics, and are managed via county harvesting operations. In addition, the new Lake Belle View may require harvesting, so a new APM plan will be developed for that lake. Updated monitoring and amended plans are recommended by DNR for the other waters. A consultant will use established point intercept maps to survey current plant populations, and use those data to re-evaluate management plans, ensuring that the best management options are being implemented. Regular updates are presented in public meetings to Dane County staff and the Dane County Lakes and Watershed Commission. Updated plans are posted on the county website.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Barbian Pond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Barbian Pond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Bass Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Bass Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Brandenburg Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Brandenburg Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Carl Buechner Pond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Carl Buechner Pond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
5/25/1995
Waters Involved
Cherokee Lake
Status
Complete
Dane County: Acq-Cherokee Marsh Land Acquisition: Dane County proposes to acquire approximately 110 acres of land as an addition to Cherokee Marsh for low impact recreational opportunities and lake protection. Eligible costs include acquisition of the parcel, appraisal fee and preparation of an environmental assessment.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Cherokee Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Cherokee Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Crystal Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Crystal Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Diedrich Pond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Diedrich Pond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Fish Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Fish Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Fish Lake
Status
Complete
Dane County Parks: Acq-Fish And Mud Lakes-Marx Acquisition: The Marx property has already been purchased by Dane County. The property will protect the majority of the Mud Lake shoreline, which is connected to Fish Lake, a very important resource in NW Dane County. This land is adjacent to other property already purchased by the County. In five years, the property will be converted from row cropping to natural drainage patterns and natural vegetation to encourage wildlife and promote water quality benefits.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Fishers Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Fishers Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Goose Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Goose Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Graber Pond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Graber Pond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Grass Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Grass Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Hook Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Hook Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/1997
Waters Involved
Indian Lake
Status
Complete
Dane County: Acq-Indian Lake - Matz Acquisition: Dane County Parks will acquire 40.23 acres located adjacent to Indian Lake. The acquisition will prevent land use development and maintain a buffer of upland and wetland to filter contaminants from entering Indian Lake. The property also contains wetlands and springs that feed Indian Lake.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Indian Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Indian Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Island Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Island Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Kalscheur Pond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Kalscheur Pond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Barney
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Barney
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Belle View
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Belle View
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Harriett
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Harriett
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2002
Waters Involved
Lake Kegonsa
Status
Complete
Dane County: Acq-Ladd Property Acquisition: Dane County will purchase 80 acres of wetlands (The Ladd Property) in the Town of Dunn along the Door Creek Wetlands in order to preserve wildlife habitat and water quality.
A full description of the project scope and project deliverables is available in the grant application, which is a part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.
Grant Details
Lake Protection Grant
Date
9/1/2002
Waters Involved
Lake Kegonsa
Status
Complete
Dane County: Acq-Wheeler Property Acquisition: Dane County will purchase 20 acres fee acquisition of wetlands (The Wheeler Property) in the Town of Dunn along the Door Creek Wetlands in order to preserve wildlife habitat and water quality.
A full description of the project scope and project deliverables is available in the grant application, which is a part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Kegonsa
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Kegonsa
Status
Complete
Dane County: Acq-Door Crk Wetlands-Bruns/Amundson Acq: Dane County Parks Department is seeking funding for acquisition of the Bruns/Amundson Property in order to acquire 19 acres of land. Acquisition of this land will protect property immediately adjacent to other county and town owned lands. This is part of a parcel of land owned Richard Amundson and Ernie Brun.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Lake Kegonsa
Status
Complete
Dane County Parks: Acq-Vogts Acquisition - Door Creek Wetlands: Acquisition of the Vogts property will meet objectives of the Door Creek Wetlands Resource Protection Plan. This acquisition and the planned restoration of the wetland are expected to improve spawning habitat for northern pike in Lake Kegonsa and better control stormwater and run-off pollution entering Lake Kegonsa from Door Creek.
A full description of deliverables is included in the grant application, which is a part of this agreement.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Kegonsa
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Koshkonong
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Koshkonong
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/1997
Waters Involved
Lake Mendota
Status
Complete
City Of Middleton: Lmi-Pheasant Branch Watershed - In Lake Mendota Priority Watersh: The City of Middleton will contract with the U.S. Geological Survey to monitor and model the surface and groundwater flow within a portion of the Pheasant Branch watershed to locate effective combination of storm water treatment and control sites within the North Fork to mitigate the impacts of urbanization on the quality and quantity of water reaching Lake Mendota. Activities of the project include developing a surface and groundwater model based on existing data, collecting various field data for model inputs (including monitoring precipitation and flow discharge) refine the model and calibrate it to field measurements, calculate present and future pollution loads, and conduct analyses to accomplish the project objectives. Deliverables include: a report summarizing the project work, results and recommendations, maps showing recharge areas, hydrologfical sensitive sites, and the final calibrated computer model.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Mendota
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Mendota
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Monona
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Monona
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Waubesa
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Waubesa
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Wingra
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Wingra
Status
Complete
Dane County: Res-Lake Wingra Shoreline Habitat Restoration: The Dane County Land Conservation Department will implement a Lake Wingra Shoreline Habitat Restoration project in order to restore native species and natural habitats, to control exotic and invasive speies that threaten native species and habitats and to reduce the impacts of stormwater runoff on Lake Wingra's water quality. Project deliverables include: creation of a natural vegetation buffer along 500 feet of the lake's shoreline, installing a carp removal exclosure and purple loosestrife and buckthorn control.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Wingra
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Louis Buechner Pond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Louis Buechner Pond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Maher Pond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Maher Pond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Marshall Millpond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Marshall Millpond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Maunesha Flowage
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Maunesha Flowage
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Meier Pond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Meier Pond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Morse Pond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Morse Pond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Mortenson Pond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Mortenson Pond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
10/8/1996
Waters Involved
Mud Lake
Status
Complete
Dane County: Acq-Dane County Lower Mud Lake Affholder Acquisition: Dane County shall participate in the Lake Protection Grant Program by purchasing 95 acres of land for public outdoor recreation.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Mud Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Mud Lake
Status
Complete
Dane County: Acq-Marcus Marx Property Acquisition: Dane County Parks Department will acquire 58 acres of land adjacent to Mud Lake in the Town of Roxbury in order to restore native vegetation and provide a permanent buffer that will filter upstream runoff before it enters Mud Lake and Fish Lakes. The acquisition of this property will protect the land and the waters from further degradation.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Mud Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Rice Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Rice Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Rockdale Millpond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Rockdale Millpond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Salmo Pond (Raemisch Pond)
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Salmo Pond (Raemisch Pond)
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Springfield Pond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Springfield Pond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Stebbinsville Pond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Stebbinsville Pond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
1/24/1997
Waters Involved
Stewart Lake
Status
Complete
Dane County: Lmi-Stewart Lake Water And Sediment Control Basins: Dane County Proposes to construct 5 storm water detention basins to reduce the amount of sediment entering Stewart Lake.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Stewart Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Stewart Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Stoughton Millpond 429
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Stoughton Millpond 429
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Strickers Pond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Strickers Pond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Tenney Park Lagoon
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Tenney Park Lagoon
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Tiedemans Pond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Tiedemans Pond
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
5/25/1995
Waters Involved
Token Creek
Status
Complete
Dane County: Acq-Cherokee Marsh Land Acquisition: Dane County proposes to acquire approximately 110 acres of land as an addition to Cherokee Marsh for low impact recreational opportunities and lake protection. Eligible costs include acquisition of the parcel, appraisal fee and preparation of an environmental assessment.
Grant Details
Lake Protection Grant
Date
3/2/1994
Waters Involved
Unnamed
Status
Complete
Dane County: Acq-Pheasant Branch Marsh - Frederick Acquisition: Dane County will acquire approximately 161 acres of land within the Pheasant Branch Marsh for lake protection and public outdoor recreation purposes. Amendment 1: The scope is changed to reflect a change of acreage to 100.5 acres.
Grant Details
Lake Protection Grant
Date
5/25/1995
Waters Involved
Unnamed
Status
Complete
Dane County: Acq-Cherokee Marsh Land Acquisition: Dane County proposes to acquire approximately 110 acres of land as an addition to Cherokee Marsh for low impact recreational opportunities and lake protection. Eligible costs include acquisition of the parcel, appraisal fee and preparation of an environmental assessment.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Unnamed
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Unnamed
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Unnamed
Status
Complete
Dane County Parks: Aulik Acquisition-Patrick Marsh: Dane County will acquire acreage within Patrick Marsh, a DNR and Dane County project area that is identified in both the Land Legacy Report and the Dane County Parks and Open Space Plan. The Aulik property is approximately 11.6 acres along the southern shore of Patrick Marsh. The acquisition of this property will protect and enhance this natural resource site.
Grant Details
Lake Protection Grant
Date
4/1/2015
Waters Involved
Unnamed
Status
Complete
Village Of Mazomanie: Lmi-Lake Marion Family Recreational Fishery: The Village of Mazomanie will complete a large, multi-faceted lake restoration project on Lake Marion by installing an access sign at the boat landing, installing an aeration system, stocking fish, placing habitat structures on the bed, and reconfiguring and restoring large lengths of shoreline consistent with department recommendations. The boat landing access sign will explicitly reflect the Village ordinance allowing non-motorized boat use of the lake. Current steep shorelines will be graded to provide a healthy diversity of habitat, dead trees will be introduced and anchored to shore, and trees, shrubs and understory natives will be planted. Water quality will be monitored to track lake improvements. Project updates will be shared via social media, press releases, public meetings, and community volunteer workdays and celebration. Final report and other deliverables are detailed in the grant application form.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Upper Mud Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Upper Mud Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Verona Gravel Pit
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Verona Gravel Pit
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Virgin Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Virgin Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Windsor Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Windsor Lake
Status
Complete
Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.
Detailed goals, methods and deliverables are outlined in the application.
Grant Details
Lake Protection Grant
Date
5/25/1995
Waters Involved
Yahara River
Status
Complete
Dane County: Acq-Cherokee Marsh Land Acquisition: Dane County proposes to acquire approximately 110 acres of land as an addition to Cherokee Marsh for low impact recreational opportunities and lake protection. Eligible costs include acquisition of the parcel, appraisal fee and preparation of an environmental assessment.
Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Badger Mill Creek
Status
Complete
City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Barbian Pond
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Bass Lake
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Brandenburg Lake
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Carl Buechner Pond
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Cherokee Lake
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Cherokee Lake
Status
Complete
City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Crystal Lake
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Diedrich Pond
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Door Creek
Status
Complete
City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Fish Lake
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Fishers Lake
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Goose Lake
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Graber Pond
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Grass Lake
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2005
Waters Involved
Halfway Prairie Creek
Status
Complete
Dane County: Preparation Of Apm Plans--Lower Mud, Fish, Crystal, Wingra & Indian Lakes: Aquatic plant and substrate surveys will be conducted, followed by evaluation of changes over time to develop or modify APM plans for these waters.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Hook Lake
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/18/1994
Waters Involved
Indian Lake
Status
Complete
Dane County: Indian Lake Management Planning: Determine existing physical and chemical lake conditions. Obtain information on recreational uses of the lake. Define resource limitations and recommed feasible management activities to address desired recreational use objectives. The grantee willdisseminate information to the public by entire report and summary report mailings and public meetings. Project results will be reposited at Dane COunty Lakes and Watershed Division, Regional Planning Commission, and DNR Southern District.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Indian Lake
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2005
Waters Involved
Indian Lake
Status
Complete
Dane County: Preparation Of Apm Plans--Lower Mud, Fish, Crystal, Wingra & Indian Lakes: Aquatic plant and substrate surveys will be conducted, followed by evaluation of changes over time to develop or modify APM plans for these waters.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Island Lake
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Kalscheur Pond
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Barney
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Belle View
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Harriett
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Kegonsa
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Koshkonong
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Mendota
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Lake Mendota
Status
Complete
City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Monona
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Lake Monona
Status
Complete
City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Waubesa
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Lake Waubesa
Status
Complete
City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Wingra
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Lake Wingra
Status
Complete
City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Louis Buechner Pond
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Maher Pond
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Marshall Millpond
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Maunesha Flowage
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Meier Pond
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Morse Pond
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Morse Pond
Status
Complete
City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Mortenson Pond
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Mud Lake
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Nine Springs Creek
Status
Complete
City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Rice Lake
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Rockdale Millpond
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Salmo Pond (Raemisch Pond)
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Springfield Pond
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Starkweather Creek
Status
Complete
City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Stebbinsville Pond
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Stewart Lake
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Stoughton Millpond 429
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Strickers Pond
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Strickers Pond
Status
Complete
City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Tenney Park Lagoon
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Tenney Park Lagoon
Status
Complete
City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Tiedemans Pond
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Unnamed
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Unnamed
Status
Complete
City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Upper Mud Lake
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Upper Mud Lake
Status
Complete
City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Verona Gravel Pit
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Virgin Lake
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Windsor Lake
Status
Complete
Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.
A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.
Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Wingra Creek
Status
Complete
City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."
Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Yahara River
Status
Complete
City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Badger Mill Creek
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Badger Mill Creek
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Barbian Pond
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Barbian Pond
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Bass Lake
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Bass Lake
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Brandenburg Lake
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Brandenburg Lake
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Carl Buechner Pond
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Carl Buechner Pond
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Cherokee Lake
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Cherokee Lake
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Cherokee Lake
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Cherokee Lake
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Crystal Lake
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Crystal Lake
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Diedrich Pond
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Diedrich Pond
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Door Creek
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Door Creek
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Fish Lake
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Fish Lake
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Fishers Lake
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Fishers Lake
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Goose Lake
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Goose Lake
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2001
Waters Involved
Graber Pond
Status
Complete
City Of Middleton: Organization And Development Of Pond Friends - Education: This project will: 1) broaden community awareness and understanding of the kettle pond communities, kettle pond ecosystem conditions, and restoration management techniques through the dissemination of existing information related to the kettle ponds, and 2) assist local units of government in implementing the goals and objectives for the long term restoration and management of kettle ponds.
A full description pf project scope and deliverables is available in the grant application , which is a part of this agreement.
Grant Details
Small Scale Lake Planning
Date
4/1/2002
Waters Involved
Graber Pond
Status
Complete
City Of Middleton: Org. & Develop. Of A Community-Based Edu. Program To Improve Wq: The City of Middleton will attempt to: 1) broaden community awareness and understanding of the kettle ponds, water quality issues and there effect on surrounding watershed areas, 2) educate the community regarding ecosystem conditions and restoration management techniques for vegetative buffers and 3) assist local units of government in implementing the goals and objectives for establishing a the long term nutrient management program.
A full description of the project scope and deliverables is available in the grant application, which is part of this agreement.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Graber Pond
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Graber Pond
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Grass Lake
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Grass Lake
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Hook Lake
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Hook Lake
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Indian Lake
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Indian Lake
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Island Lake
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Island Lake
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Kalscheur Pond
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Kalscheur Pond
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Barney
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Barney
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Belle View
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Belle View
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Harriett
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Harriett
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Kegonsa
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Kegonsa
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Koshkonong
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Koshkonong
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2001
Waters Involved
Lake Mendota
Status
Complete
City Of Middleton: Organization And Development Of Pond Friends - Education: This project will: 1) broaden community awareness and understanding of the kettle pond communities, kettle pond ecosystem conditions, and restoration management techniques through the dissemination of existing information related to the kettle ponds, and 2) assist local units of government in implementing the goals and objectives for the long term restoration and management of kettle ponds.
A full description pf project scope and deliverables is available in the grant application , which is a part of this agreement.
Grant Details
Small Scale Lake Planning
Date
4/1/2002
Waters Involved
Lake Mendota
Status
Complete
City Of Middleton: Org. & Develop. Of A Community-Based Edu. Program To Improve Wq: The City of Middleton will attempt to: 1) broaden community awareness and understanding of the kettle ponds, water quality issues and there effect on surrounding watershed areas, 2) educate the community regarding ecosystem conditions and restoration management techniques for vegetative buffers and 3) assist local units of government in implementing the goals and objectives for establishing a the long term nutrient management program.
A full description of the project scope and deliverables is available in the grant application, which is part of this agreement.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Mendota
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Mendota
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Lake Mendota
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Lake Mendota
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Monona
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Monona
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Lake Monona
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Lake Monona
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Waubesa
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Waubesa
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Lake Waubesa
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Lake Waubesa
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Wingra
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Wingra
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Lake Wingra
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Lake Wingra
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Louis Buechner Pond
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Louis Buechner Pond
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Maher Pond
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Maher Pond
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Marshall Millpond
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Marshall Millpond
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Maunesha Flowage
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Maunesha Flowage
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Meier Pond
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Meier Pond
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Morse Pond
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Morse Pond
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Morse Pond
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Morse Pond
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Mortenson Pond
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Mortenson Pond
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Mud Lake
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Mud Lake
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Nine Springs Creek
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Nine Springs Creek
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Rice Lake
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Rice Lake
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Rockdale Millpond
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Rockdale Millpond
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Salmo Pond (Raemisch Pond)
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Salmo Pond (Raemisch Pond)
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Springfield Pond
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Springfield Pond
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Starkweather Creek
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Starkweather Creek
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Stebbinsville Pond
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Stebbinsville Pond
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Stewart Lake
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Stewart Lake
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Stoughton Millpond 429
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Stoughton Millpond 429
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2001
Waters Involved
Strickers Pond
Status
Complete
City Of Middleton: Organization And Development Of Pond Friends - Education: This project will: 1) broaden community awareness and understanding of the kettle pond communities, kettle pond ecosystem conditions, and restoration management techniques through the dissemination of existing information related to the kettle ponds, and 2) assist local units of government in implementing the goals and objectives for the long term restoration and management of kettle ponds.
A full description pf project scope and deliverables is available in the grant application , which is a part of this agreement.
Grant Details
Small Scale Lake Planning
Date
4/1/2002
Waters Involved
Strickers Pond
Status
Complete
City Of Middleton: Org. & Develop. Of A Community-Based Edu. Program To Improve Wq: The City of Middleton will attempt to: 1) broaden community awareness and understanding of the kettle ponds, water quality issues and there effect on surrounding watershed areas, 2) educate the community regarding ecosystem conditions and restoration management techniques for vegetative buffers and 3) assist local units of government in implementing the goals and objectives for establishing a the long term nutrient management program.
A full description of the project scope and deliverables is available in the grant application, which is part of this agreement.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Strickers Pond
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Strickers Pond
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Strickers Pond
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Strickers Pond
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Tenney Park Lagoon
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Tenney Park Lagoon
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Tenney Park Lagoon
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Tenney Park Lagoon
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2001
Waters Involved
Tiedemans Pond
Status
Complete
City Of Middleton: Organization And Development Of Pond Friends - Education: This project will: 1) broaden community awareness and understanding of the kettle pond communities, kettle pond ecosystem conditions, and restoration management techniques through the dissemination of existing information related to the kettle ponds, and 2) assist local units of government in implementing the goals and objectives for the long term restoration and management of kettle ponds.
A full description pf project scope and deliverables is available in the grant application , which is a part of this agreement.
Grant Details
Small Scale Lake Planning
Date
4/1/2002
Waters Involved
Tiedemans Pond
Status
Complete
City Of Middleton: Org. & Develop. Of A Community-Based Edu. Program To Improve Wq: The City of Middleton will attempt to: 1) broaden community awareness and understanding of the kettle ponds, water quality issues and there effect on surrounding watershed areas, 2) educate the community regarding ecosystem conditions and restoration management techniques for vegetative buffers and 3) assist local units of government in implementing the goals and objectives for establishing a the long term nutrient management program.
A full description of the project scope and deliverables is available in the grant application, which is part of this agreement.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Tiedemans Pond
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Tiedemans Pond
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Unnamed
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Unnamed
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Unnamed
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Unnamed
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Upper Mud Lake
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Upper Mud Lake
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Upper Mud Lake
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Upper Mud Lake
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Verona Gravel Pit
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Verona Gravel Pit
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Virgin Lake
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Virgin Lake
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Windsor Lake
Status
Complete
Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.
The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Windsor Lake
Status
Complete
Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.
The deliverable will be the comprehensive documents.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Wingra Creek
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Wingra Creek
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Yahara River
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Yahara River
Status
Complete
City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.
Grant Details
Targeted Runoff - Rural Construction
Date
8/10/2005
Waters Involved
Black Earth Creek
Status
Complete
Dane County: Statz Farm Noi-Black Earth Ck: To cost-share installation of best management practices to mitigate agricultural runoff to Black Earth Creek.
Grant Details
Targeted Runoff - Rural Construction
Date
4/1/2006
Waters Involved
German Valley Br
Status
Complete
Dane County Land Conservation Dept: German Valley Creek Middle: To cost-share installation of streambank restoration and protection practices designed to prevent unlimited livestock access to waters of the state.
Grant Details
Targeted Runoff - Rural Construction
Date
4/1/2006
Waters Involved
German Valley Br
Status
Complete
Dane County: German Valley North: Installation of streambank restoration/protection practices, to include: Riprap, rock weirs, shaping & seeding, critical area stabilization, and lunkers along approximately 14,000 feet of German Valley Creek north of grantee's 2004 project.
Grant Details
Targeted Runoff - Rural Construction
Date
4/1/2006
Waters Involved
German Valley Br
Status
Complete
Dane County: German Valley South: to costshare at 70% streambank rehabilitation within the southern segment of German Valley Creek
Grant Details
Total Maximum Daily Load
Date
4/1/2006
Waters Involved
German Valley Br
Status
Complete
Dane County Land Conservation Dept: German Valley Creek Middle: To cost-share installation of streambank restoration and protection practices designed to prevent unlimited livestock access to waters of the state.
Grant Details
Urban Nonpoint - Stormwater Construction
Date
1/1/2015
Waters Involved
Lake Monona
Status
Complete
City Of Monona: Storm Water Treatment Devices: This grant provides funding and authorizes cost-share reimbursement by the department for the above-named project as described in the grant application submitted for calendar year 2015 for the eligible storm water construction activities listed in the application to address nonpoint sources of pollution. The cost-share reimbursement rate will be up to 18% of the actual eligible project costs, to the maximum amount contained in Part 2.
Grant Details
River Planning Grant
Date
10/18/2000
Waters Involved
Black Earth Creek
Status
Complete
Black Earth Creek Watershed Association: Black Earth Creek: Protection Into Perpetuity: The Black Earth Creek Watershed Association (BECWA) will hire a director who will manage BECWA, perform a study of long term funding mechanisms, and implement a program of action to obtain permanent funding for BECWA; thus ensuring the organization's permanent presence for the protection of Black Earth Creek.
A full description of the project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
River Planning Grant
Date
7/1/2001
Waters Involved
Black Earth Creek
Status
Complete
Dane County: Black Earth Creek Valley Resource Area Plan: In this project, Dane County will develop a resource plan for the Black Earth Creek Valley.
A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
River Planning Grant
Date
7/1/2001
Waters Involved
Black Earth Creek
Status
Complete
Trout Unlimited-Southern Wisconsin Chapter: Organizational Capacity Building: SW Trout Unlimited will work on enhancing the organization and strengthening its activity as a river protection organiztion in order to continue its work on protecting the Black Earth Creek. This will include develop a data base for strategic organization decisions, review the Bylaws, develop a set of operating procedures, develop a long term strategic financial strategy and train officers, members and partners in organizational capacity building to enhance watereshed protection.
A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
River Planning Grant
Date
7/1/2003
Waters Involved
Black Earth Creek
Status
Complete
Black Earth Creek Watershed Association: Black Earth Crk: Protection Into Perpetuity Ii: The Black Earth Creek Watershed Association will enhance their existing organization in order increase educational efforts and protection of the Black Earth Creek Watershed. Project deliverables include: securing funding for the long term, developing a River Protection Strategy, increasing membership and continuing the watershed planning workshops and newsletter.
A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
River Planning Grant
Date
7/1/2003
Waters Involved
Black Earth Creek
Status
Complete
Village Of Cross Plains: Bec Watershed Modeling Proj, Brewery Crk To Garfoot Crk Ph 1: The Village of Cross Plains will increase the understanding of the existing hydrologic system by developing a coupled groundwater and surface water model for the BEC watershed, segment Brewery Creek to Garfoot Creek.
A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
River Planning Grant
Date
7/1/2003
Waters Involved
Black Earth Creek
Status
Complete
Village Of Cross Plains: Bec Watershed Modeling Proj. Garfoot Crk To Blk Earth, Ph. 1: The Village of Cross Plains will increase the understanding of the existing hydrologic system by developing a coupled groundwater and surface water model for the BEC watershed, segment Garfoot Creek to Black Earth.
A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
River Planning Grant
Date
7/1/2003
Waters Involved
Black Earth Creek
Status
Complete
Village Of Cross Plains: Bec Watershed Modeling Proj. Headwaters To Cross Plains, Phase 1: The Village of Cross Plains will increase the understanding of the existing hydrologic system by developing a coupled groundwater and surface water model for the BEC watershed, segment Headwaters to Cross Plains.
A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
River Planning Grant
Date
7/1/2004
Waters Involved
Black Earth Creek
Status
Complete
Groundswell Conservancy: Black Earth Creek Site Conservation Planning: The Natural Heritage Land Trust will conduct a planning process and develop a site conservation plan for the Black Earth Creek Watershed. A full description of the project and its goals, objectives and deliverables is included in the grant application which is a part of this contract.
Grant Details
River Planning Grant
Date
7/1/2009
Waters Involved
Black Earth Creek
Status
Complete
Village Of Cross Plains: Black Earth Creek Restoration Study: The Village of Cross Plains will conduct a comprehensive study of Black Earth Creek, within the village limits, in order to document and monitor current water quality, streambank characteristics, and native/non-native/invasive species in order to develop options and management recommendations to restore the stream course and adjacent watershed. Along with a final report, project deliverables include: 1) documented study with results and recommendations; and 2) presentations to public and sponsor or participate in at least one public forum to discuss study and gather stakeholder input.
Grant Details
River Planning Grant
Date
7/1/2010
Waters Involved
Black Earth Creek
Status
Complete
Wolf Run Association, Inc: Lower Black Earth Creek Watershed Restoration & Capacity Building: Wolf Run Association, Inc. will sponsor a project on the Black Earth Creek (BEC) to protect and enhance the lower reaches of the creek downstream from the Village of Black Earth (including Lake Marion and the Village of Mazomanie). Part of the project includes making a decision about the future of the current dam structure on Lake Marion which derives its water supply from BEC. This decision point offers both a challenge to citizens and the communities, and a unique opportunity for a broader and more comprehensive environmental restoration of the lower BEC region and Lake Marion. Project deliverables include: gathering key information about the various management options available regarding the Lake Marion dam and Lake Marion, development of a Wolf Run Association website, facilitating restoration activities, land/stream corridor enhancement and protection, creation of signage along key access areas, conservation lands and trails, holding public meetings, and preparing other public information products.
Grant Details
River Planning Grant
Date
7/1/2011
Waters Involved
Black Earth Creek
Status
Complete
Village Of Cross Plains: Black Earth Creek Monitoring: The Village of Cross Plains will participate in the River Planning Grant Program by partnering with USGS to conduct a water quantity and quality monitoring on the Black Earth Creek within the Village limits. Project deliverables include: 1.) Supporting the collection of water quality and quantity data at USGS monitoring station(s) along the Creek. 2.) Preparing a summary report of the findings. 3.) Raising awareness of the important work that continues in the watershed to improve this critical natural resource by sharing findings with stakeholder groups through a public meeting (s) and other venues and means, posting the results on the Village\2019s website, and including an article (s) in the quarterly Village newsletter and/or other media.
Grant Details
River Planning Grant
Date
3/15/2024
Waters Involved
Black Earth Creek
Status
Complete
Capital Area Regional Planning Commission: Usgs Monitoring Station On Lower Black Earth Creek: The Capital Area Regional Planning Commission is sponsoring a project to continue monitoring water quality and quantity at existing USGS station (05406500) on lower Black Earth Creek.
Activities: 1) Collect real-time discharge data at 15 minute intervals including gage height, discharge flow, and stream water level elevation on Black Earth Creek monitoring station and will display on website. 2) Collect continuous water quality data including temperature, conductance, dissolved oxygen, and turbidity using multi-parameter sondes. 3) Use automated water quality samplers to measure concentrations of total phosphorus (TP), total suspended solids (TSS), and ammonia during stormflow and baseflow periods to help calculate loads across a range of flows. 4) Combine annual discharge and water quality information to compute annual loads of sampled nutrients including TSS, TP, and Ammonia.
Deliverables: 1) Real-time, online water quality information will be posted on the web at the USGS National Water Dashboard (https://dashboard.waterdata.usgs.gov) and USGS WaterAlert (https://
accounts.waterdata.usgs.gov/wateralert/) for municipalities and the public to view and download. 2) USGS report on the water quality of Black Earth Creek. 3) Water quality data (TP, TSS, and Ammonia) entered into SWIMS.
Conditions:
1) Enter data collected into SWIMS database under the grant project number.
This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.
Grant Details
River Planning Grant
Date
3/15/2024
Waters Involved
Black Earth Creek
Status
Complete
Capital Area Regional Planning Commission: Usgs Monitoring Stations On Upper Black Earth Creek: The Capital Area Regional Planning Commission is sponsoring a project to continue monitoring water quality and quantity at existing USGS stations (05406457 and 05406479) on upper Black Earth Creek.
Activities: 1) Collect real-time discharge data at 15 minute intervals including gage height, discharge flow, and stream water level elevation on Black Earth Creek monitoring stations and will display on website. 2) Collect continuous water quality data including temperature, conductance, dissolved oxygen, and turbidity using multi-parameter sondes. 3) Use automated water quality samplers to measure concentrations of total phosphorus (TP), total suspended solids (TSS), and ammonia during stormflow and baseflow periods to help calculate loads across a range of flows. 4) Combine annual discharge and water quality information to compute annual loads of sampled nutrients including TSS, TP, and Ammonia.
Deliverables: 1) Real-time, online water quality information will be posted on the web at the USGS National Water Dashboard (https://dashboard.waterdata.usgs.gov) and USGS WaterAlert (https://
accounts.waterdata.usgs.gov/wateralert/) for municipalities and the public to view and download. 2) USGS report on the water quality of Black Earth Creek. 3) Water quality data (TP, TSS, and Ammonia) entered into SWIMS.
Conditions:
1) Enter data collected into SWIMS database under the grant project number.
This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.
Grant Details
River Planning Grant
Date
7/1/2004
Waters Involved
Brewery Creek
Status
Complete
Dane County: Brewery Creek Assessment And Education: Dane County will conduct stream-monitoring activities on Brewery Creek to document physical and biological changes to the Creek as a result of residential homes being constructed on the stream as a part of the Saint Francis Development. A full description of the data collection methods and sampling locations are in the revised grant application, which is a part of this contract.
Grant Details
River Planning Grant
Date
3/15/2024
Waters Involved
Brewery Creek
Status
Complete
Capital Area Regional Planning Commission: Usgs Monitoring Station On Brewery Creek: The Capital Area Regional Planning Commission is sponsoring a project to continue monitoring water quality and quantity at existing USGS station (05406469) on Brewery Creek.
Activities: 1) Collect real-time discharge data at 15 minute intervals including gage height, discharge flow, and stream water level elevation on Brewery Creek monitoring station and will display on website. 2) Collect continuous water quality data including temperature, conductance, dissolved oxygen, and turbidity using multi-parameter sondes. 3) Use automated water quality samplers to measure concentrations of total phosphorus (TP), total suspended solids (TSS), and ammonia during stormflow and baseflow periods to help calculate loads across a range of flows. 4) Combine annual discharge and water quality information to compute annual loads of sampled nutrients including TSS, TP, and Ammonia.
Deliverables: 1) Real-time, online water quality information will be posted on the web at the USGS National Water Dashboard (https://dashboard.waterdata.usgs.gov) and USGS WaterAlert (https://
accounts.waterdata.usgs.gov/wateralert/) for municipalities and the public to view and download. 2) USGS report on the water quality of Brewery Creek. 3) Water quality data (TP, TSS, and Ammonia) entered into SWIMS.
Conditions:
1) Enter data collected into SWIMS database under the grant project number.
This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.
Grant Details
River Protection Grant
Date
7/1/2013
Waters Involved
Black Earth Creek
Status
Complete
Wolf Run Association, Inc: Black Earth Creek Streambank Improvement: Wolf Run Association, Inc. will undertake a River Management project on the Black Earth Creek. Project deliverables are as follows: 1.) Improve fish habitat and water quality by stabilizing eroding banks, narrowing the stream channel (thereby increasing velocity and oxygenation), improve substrate, and increase connectivity with floodplain on \00BD mile of BEC, 2.) Improve scenic and recreational values and public access along Black Earth Creek in concert with the Wolf permanent conservation easement and multi-use trail on the eastern side of the stream, 3.) Enhance outdoor educational opportunities in the watershed, 4.) Add to the regional economy by extending a high quality resource and the capacity for more users, 5.) Install structures as outlined in the grant application, cost estimate tables, 8.) Provide pre-restoration and post-restoration photos taken at several locations on each stream.