Watershed - Yahara River and Lake Mendota (LR09)
Yahara River and Lake Mendota Watershed

Details

This north central Dane County watershed, which extends into a small portion of southern Columbia County, is a mixture of urban, suburban, and agricultural land. Urban areas include DeForest, Windsor-Lake Windsor, and the north side of the city of Madison and a portion of the city of Sun Prairie. Principal streams are the Yahara River and Token Creek. Lake Mendota is the major lake in the watershed. Large portions of wetlands have been drained for agriculture or filled for development since European settlement. Cherokee Marsh is the last large wetland complex in the watershed. Smaller wetland complexes exist, as well as many prior converted wetland areas. In spring, numerous ephemeral ponds are extensively used by migratory waterfowl. Drainage tiles and ponds and intense (sub)urban and rural development threaten or have already destroyed many of these water features. This 85-square mile watershed has a medium susceptibility for groundwater contamination based on WDNR groundwater susceptibility mapping. Increased urban development on the west side of Sun Prairie and extending to Token Creek has raised concern about decreased groundwater recharge and altered base flow in Token Creek, a Class III trout stream. Analysis conducted by the Dane County Regional Planning Commission (DCRPC) ranked this watershed as a high priority candidate for a nonpoint source priority watershed project. Thus, in 1996 a priority watershed appraisal was conducted.

Date  2002

Population, Land Use

This watershed includes rapidly urbanizing areas such as the City of Sun Prairie, and the Village of DeForest. A number of projects have been initiated through priority watershed program funds in the Lake Mendota watersheds (LR09 and LR10). The village of DeForest, along the Yahara River upstream of its confluence with Token Creek, is in the process of developing a comprehensive stormwater management plan. DeForest's overall stormwater management master plan accommodates and includes participation by the towns of Windsor and Vienna. The city of Sun Prairie is also in the process of developing a comprehensive stormwater management plan.

Date  2002

Ecological Landscapes for Yahara River and Lake Mendota Watershed

Ecological Landscapes

The Southeast Glacial Plains Ecological Landscape makes up the bulk of the non-coastal land area in southeast Wisconsin. This Ecological Landscape is made up of glacial till plains and moraines. Most of this Ecological Landscape is composed of glacial materials deposited during the Wisconsin Ice Age, but the southwest portion consists of older, pre-Wisconsin till with a more dissected topography. Soils are lime-rich tills overlain in most areas by a silt-loam loess cap. Agricultural and residential interests throughout the landscape have significantly altered the historical vegetation. Most of the rare natural communities that remain are associated with large moraines or in areas where the Niagara Escarpment occurs close to the surface. Historically, vegetation in the Southeast Glacial Plains consisted of a mix of prairie, oak forests and savanna, and maple-basswood forests. Wet-mesic prairies, southern sedge meadows, emergent marshes, and calcareous fens were found in lower portions of the Landscape. End moraines and drumlins supported savannas and forests. Agricultural and urban land use practices have drastically changed the land cover of the Southeast Glacial Plains since Euro-American settlement. The current vegetation is primarily agricultural cropland. Remaining forests occupy only about 10% of the land area and consist of maple-basswood, lowland hardwoods, and oak. No large mesic forests exist today except on the Kettle Interlobate Moraine which has topography too rugged for agriculture. Some existing forest patches that were formerly savannas have succeeded to hardwood forest due to fire suppression.

Date  2010

Recreational Opportunities

Lake Mendota is the largest waterbody in Dane County and the most heavily used in southern Wisconsin. The lake's recreational boaters spend an estimated $3 million per year in the local economy, making this lake the fifth highest use waterbody in Wisconsin (including the Mississippi and Wisconsin Rivers).

Date  2002

Watershed Documents
Watershed Grants
Grant Details
Aquatic Invasives Control
Date
10/1/2005
Waters Involved
Lake Mendota
Status
Complete

Dane County: Potential Effects Of Zebra Mussels In The Madison Lakes: To learn about potential impact of zebra mussel infestation on lakes, researchers will monitor benthic organisms in comparison lakes, Madison lakes with only the first signs of Zebra Mussel infestation (no reproducing population), and SER lakes with established infestations.


Grant Details
Aquatic Invasives Control
Date
10/1/2005
Waters Involved
Yahara River
Status
Complete

Dane County: Potential Effects Of Zebra Mussels In The Madison Lakes: To learn about potential impact of zebra mussel infestation on lakes, researchers will monitor benthic organisms in comparison lakes, Madison lakes with only the first signs of Zebra Mussel infestation (no reproducing population), and SER lakes with established infestations.


Grant Details
Aquatic Invasives Early Detection and Response
Date
5/1/2013
Waters Involved
Token Creek
Status
Complete

Town Of Windsor: Token Creek Conservancy Knotweed Control- Town Of Windsor: For a period of five years, the Town of Windsor Token Creek Conservancy will cut and treat with herbicide all the Japanese knotweed found growing at the Culver Conservancy, which is headwaters to Token Creek. Cutting and burning of dead stalks, and fall herbicide treatments will be done by volunteers. Photos of the progress will be taken to help document this project. Annual progress reports will assure the project stays on schedule, and will be followed by a final report to the department.


Grant Details
Aquatic Invasives Early Detection and Response
Date
5/1/2013
Waters Involved
Unnamed
Status
Complete

Town Of Windsor: Token Creek Conservancy Knotweed Control- Town Of Windsor: For a period of five years, the Town of Windsor Token Creek Conservancy will cut and treat with herbicide all the Japanese knotweed found growing at the Culver Conservancy, which is headwaters to Token Creek. Cutting and burning of dead stalks, and fall herbicide treatments will be done by volunteers. Photos of the progress will be taken to help document this project. Annual progress reports will assure the project stays on schedule, and will be followed by a final report to the department.


Grant Details
Aquatic Invasives Early Detection and Response
Date
5/1/2013
Waters Involved
Yahara River
Status
Complete

Town Of Windsor: Token Creek Conservancy Knotweed Control- Town Of Windsor: For a period of five years, the Town of Windsor Token Creek Conservancy will cut and treat with herbicide all the Japanese knotweed found growing at the Culver Conservancy, which is headwaters to Token Creek. Cutting and burning of dead stalks, and fall herbicide treatments will be done by volunteers. Photos of the progress will be taken to help document this project. Annual progress reports will assure the project stays on schedule, and will be followed by a final report to the department.


Grant Details
Aquatic Invasives Education
Date
3/15/2023
Waters Involved
Lake Mendota
Status
Complete

Dane County: Lake Mendota Apm Update: The Dane County Land and Water Resources Department is sponsoring a project to update the Aquatic Plant Management (APM) Plan for Lake Mendota.

Project final deliverables include:
1. Complete PI survey using WDNR approved protocol, send raw data to WDNR Regional Lakes Coordinator, and upload to SWIMS database. Any plants not observed historically will be pressed and sent the herbarium.
2. Update existing APM plan utilizing data collected in 2023 PI survey and upload to Dane County Website. An electronic copy of the updated plan must be sent to the WDNR Regional Lakes Coordinator.
3. Meeting minutes and number of participants for the public informational meeting must be sent to the WDNR Regional Lakes Coordinator.


Specific project activities include:
Complete PI survey using WDNR approved protocol, update existing APM plan, and conduct public informational meeting



Special Conditions:
If a survey is used in the public informational meeting survey questions used in public meetings must be approved by WDNR social scientist. Final report and data collected shall be uploaded to SWIMS database and an electronic sent to the WDNR Regional Lakes Coordinator (arthur.watkinson@wisconsin.gov). The aquatic plant survey must follow the WDNR protocol (PUB-SS-1068 2010).


This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Education
Date
3/15/2023
Waters Involved
Yahara River
Status
Complete

Dane County: Lake Mendota Apm Update: The Dane County Land and Water Resources Department is sponsoring a project to update the Aquatic Plant Management (APM) Plan for Lake Mendota.

Project final deliverables include:
1. Complete PI survey using WDNR approved protocol, send raw data to WDNR Regional Lakes Coordinator, and upload to SWIMS database. Any plants not observed historically will be pressed and sent the herbarium.
2. Update existing APM plan utilizing data collected in 2023 PI survey and upload to Dane County Website. An electronic copy of the updated plan must be sent to the WDNR Regional Lakes Coordinator.
3. Meeting minutes and number of participants for the public informational meeting must be sent to the WDNR Regional Lakes Coordinator.


Specific project activities include:
Complete PI survey using WDNR approved protocol, update existing APM plan, and conduct public informational meeting



Special Conditions:
If a survey is used in the public informational meeting survey questions used in public meetings must be approved by WDNR social scientist. Final report and data collected shall be uploaded to SWIMS database and an electronic sent to the WDNR Regional Lakes Coordinator (arthur.watkinson@wisconsin.gov). The aquatic plant survey must follow the WDNR protocol (PUB-SS-1068 2010).


This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Research Grant
Date
4/1/2012
Waters Involved
Lake Mendota
Status
Complete

University Of Wisconsin-Madison: Research On Spiny Waterflea In Madison Lakes: The University of Wisconsin Board of Regents are sponsoring work by the Center for Limnology to increase our understanding of spiny waterflea invasion in lakes, and provide guidance for future management. This three year project will look at many aspects of understanding this species, from identification of transport vectors, determining best methods and timing to detect invasion, assessing the ecological impact of this species on plankton and fish communities in both northern and southern Wisconsin lakes. Annual updates will be submitted and the final report will be presented at local and national conferences, published in peer-reviewed literature, and shared with all project partners.


Grant Details
Aquatic Invasives Research Grant
Date
4/1/2012
Waters Involved
Yahara River
Status
Complete

University Of Wisconsin-Madison: Research On Spiny Waterflea In Madison Lakes: The University of Wisconsin Board of Regents are sponsoring work by the Center for Limnology to increase our understanding of spiny waterflea invasion in lakes, and provide guidance for future management. This three year project will look at many aspects of understanding this species, from identification of transport vectors, determining best methods and timing to detect invasion, assessing the ecological impact of this species on plankton and fish communities in both northern and southern Wisconsin lakes. Annual updates will be submitted and the final report will be presented at local and national conferences, published in peer-reviewed literature, and shared with all project partners.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Lake Kegonsa
Status
Complete

Dane County: Dane County 2020 Cbcw: Dane is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 1 public boat landing pairs on MENDOTA/MONONA (MARSHALL PARK, OLBRICH PARK), WAUBESA/KEGONSA (BABCOCK).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Lake Mendota
Status
Complete

Dane County: Mendota & Waubesa 2015 Clean Boats Clean Water Project: Dane County Land & Water Resources is sponsoring a 2015 Clean Boats Clean Waters project at 2 public boat landings including Lake Mendota and Waubesa.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Lake Mendota
Status
Complete

Dane County: Dane County Land And Water Resources Department 2016 Clean Boats Clean Waters: The Dane County Land and Water Resources Department is sponsoring a Clean Boats Clean Waters project in 2016 at two public boat landing on Mendota and MononaLakes.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Lake Mendota
Status
Complete

Dane County: Dane County 2020 Cbcw: Dane is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 1 public boat landing pairs on MENDOTA/MONONA (MARSHALL PARK, OLBRICH PARK), WAUBESA/KEGONSA (BABCOCK).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Lake Monona
Status
Complete

Dane County: Dane County 2020 Cbcw: Dane is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 1 public boat landing pairs on MENDOTA/MONONA (MARSHALL PARK, OLBRICH PARK), WAUBESA/KEGONSA (BABCOCK).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Lake Waubesa
Status
Complete

Dane County: Mendota & Waubesa 2015 Clean Boats Clean Water Project: Dane County Land & Water Resources is sponsoring a 2015 Clean Boats Clean Waters project at 2 public boat landings including Lake Mendota and Waubesa.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Lake Waubesa
Status
Complete

Dane County: Dane County 2020 Cbcw: Dane is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 1 public boat landing pairs on MENDOTA/MONONA (MARSHALL PARK, OLBRICH PARK), WAUBESA/KEGONSA (BABCOCK).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Yahara River
Status
Complete

Dane County: Mendota & Waubesa 2015 Clean Boats Clean Water Project: Dane County Land & Water Resources is sponsoring a 2015 Clean Boats Clean Waters project at 2 public boat landings including Lake Mendota and Waubesa.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Yahara River
Status
Complete

Dane County: Dane County Land And Water Resources Department 2016 Clean Boats Clean Waters: The Dane County Land and Water Resources Department is sponsoring a Clean Boats Clean Waters project in 2016 at two public boat landing on Mendota and MononaLakes.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Yahara River
Status
Complete

Dane County: Dane County 2020 Cbcw: Dane is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 1 public boat landing pairs on MENDOTA/MONONA (MARSHALL PARK, OLBRICH PARK), WAUBESA/KEGONSA (BABCOCK).


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Barbian Pond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Barbian Pond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Bass Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Bass Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Brandenburg Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Brandenburg Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Carl Buechner Pond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Carl Buechner Pond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/14/1994
Waters Involved
Cherokee Lake
Status
Complete

City Of Madison: Acq-Cherokee Marsh Expansion - Muller Parcel: The City of Madison Parks Commission will acquire approximately 13.6 acres of land, for lake protection and outdoor recreation purposes, on the north shore of Lake Mendota, adjacent to property they already own. This parcel acquisition is consistent with the 1981 Cherokee Long-Range Open Space Plan (1981) which designated this land as high priority for acquisition. The land will be developed as bicycle/pedestrian/jogging and hiking trails, preservation of a scenic Lake Mendota overlook, natural woodlands and Indian burial mounds. Eligible costs include acquisition of the parcel, appraisal fee and prepration of an environmental assesment.


Grant Details
Lake Protection Grant
Date
5/25/1995
Waters Involved
Cherokee Lake
Status
Complete

Dane County: Acq-Cherokee Marsh Land Acquisition: Dane County proposes to acquire approximately 110 acres of land as an addition to Cherokee Marsh for low impact recreational opportunities and lake protection. Eligible costs include acquisition of the parcel, appraisal fee and preparation of an environmental assessment.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Cherokee Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Cherokee Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Crystal Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Crystal Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Diedrich Pond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Diedrich Pond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Fish Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Fish Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Fish Lake
Status
Complete

Dane County Parks: Acq-Fish And Mud Lakes-Marx Acquisition: The Marx property has already been purchased by Dane County. The property will protect the majority of the Mud Lake shoreline, which is connected to Fish Lake, a very important resource in NW Dane County. This land is adjacent to other property already purchased by the County. In five years, the property will be converted from row cropping to natural drainage patterns and natural vegetation to encourage wildlife and promote water quality benefits.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Fishers Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Fishers Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Goose Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Goose Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Graber Pond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Graber Pond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Grass Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Grass Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Hook Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Hook Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/1997
Waters Involved
Indian Lake
Status
Complete

Dane County: Acq-Indian Lake - Matz Acquisition: Dane County Parks will acquire 40.23 acres located adjacent to Indian Lake. The acquisition will prevent land use development and maintain a buffer of upland and wetland to filter contaminants from entering Indian Lake. The property also contains wetlands and springs that feed Indian Lake.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Indian Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Indian Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Island Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Island Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Kalscheur Pond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Kalscheur Pond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Barney
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Barney
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Belle View
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Belle View
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Harriett
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Harriett
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2002
Waters Involved
Lake Kegonsa
Status
Complete

Dane County: Acq-Ladd Property Acquisition: Dane County will purchase 80 acres of wetlands (The Ladd Property) in the Town of Dunn along the Door Creek Wetlands in order to preserve wildlife habitat and water quality.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
9/1/2002
Waters Involved
Lake Kegonsa
Status
Complete

Dane County: Acq-Wheeler Property Acquisition: Dane County will purchase 20 acres fee acquisition of wetlands (The Wheeler Property) in the Town of Dunn along the Door Creek Wetlands in order to preserve wildlife habitat and water quality.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Kegonsa
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Kegonsa
Status
Complete

Dane County: Acq-Door Crk Wetlands-Bruns/Amundson Acq: Dane County Parks Department is seeking funding for acquisition of the Bruns/Amundson Property in order to acquire 19 acres of land. Acquisition of this land will protect property immediately adjacent to other county and town owned lands. This is part of a parcel of land owned Richard Amundson and Ernie Brun.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Lake Kegonsa
Status
Complete

Dane County Parks: Acq-Vogts Acquisition - Door Creek Wetlands: Acquisition of the Vogts property will meet objectives of the Door Creek Wetlands Resource Protection Plan. This acquisition and the planned restoration of the wetland are expected to improve spawning habitat for northern pike in Lake Kegonsa and better control stormwater and run-off pollution entering Lake Kegonsa from Door Creek.

A full description of deliverables is included in the grant application, which is a part of this agreement.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Kegonsa
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Koshkonong
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Koshkonong
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
5/15/1995
Waters Involved
Lake Mendota
Status
Complete

City Of Madison: Acq-Lake Mendota James Madison Park Acquisition- Hoover Property: The City of Madison Parks Division proposes to acquire the property at 628 East Gorham Street, adjacent to James Madison Park to expand the park for passive recreation and for lake protection. The building will be demolished and the hillside will be restored to natural vegetation.


Grant Details
Lake Protection Grant
Date
9/1/1997
Waters Involved
Lake Mendota
Status
Complete

City Of Middleton: Lmi-Pheasant Branch Watershed - In Lake Mendota Priority Watersh: The City of Middleton will contract with the U.S. Geological Survey to monitor and model the surface and groundwater flow within a portion of the Pheasant Branch watershed to locate effective combination of storm water treatment and control sites within the North Fork to mitigate the impacts of urbanization on the quality and quantity of water reaching Lake Mendota. Activities of the project include developing a surface and groundwater model based on existing data, collecting various field data for model inputs (including monitoring precipitation and flow discharge) refine the model and calibrate it to field measurements, calculate present and future pollution loads, and conduct analyses to accomplish the project objectives. Deliverables include: a report summarizing the project work, results and recommendations, maps showing recharge areas, hydrologfical sensitive sites, and the final calibrated computer model.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Lake Mendota
Status
Complete

Town Of Windsor: Acq-Token Creek Acquisition: The goal of this project is to acquire the stream corridor, spring discharge areas, and riparian lands which have been flooded since the stream was dammed in 1850. This purchase (approximately 49 acres) will give resource managers the opportunity to greatly improve the water quality of Token Creek (the largest single contributor of baseflow to Lake Mendota) and to re-establish Token Creek as one of Southern Wisconsin's premier cold water resources.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Mendota
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Mendota
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Monona
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Monona
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Waubesa
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Waubesa
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Wingra
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Wingra
Status
Complete

Dane County: Res-Lake Wingra Shoreline Habitat Restoration: The Dane County Land Conservation Department will implement a Lake Wingra Shoreline Habitat Restoration project in order to restore native species and natural habitats, to control exotic and invasive speies that threaten native species and habitats and to reduce the impacts of stormwater runoff on Lake Wingra's water quality. Project deliverables include: creation of a natural vegetation buffer along 500 feet of the lake's shoreline, installing a carp removal exclosure and purple loosestrife and buckthorn control.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Wingra
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
5/25/1995
Waters Involved
Lake Wisconsin
Status
Complete

Town Of Lodi: Acq-Lake Wisconsin Okee Community Park Land Acquisition: The Town of Lodi proposes to acquire 8.5 acres of land in the Okee Bay area of Lake Wisconsin for recreational opportunities and lake protection. Eligible costs include acquisition of the parcel, appraisal fee and preparation of an environmental assessment.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Louis Buechner Pond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Louis Buechner Pond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Maher Pond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Maher Pond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Marshall Millpond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Marshall Millpond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Maunesha Flowage
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Maunesha Flowage
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Meier Pond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Meier Pond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Morse Pond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Morse Pond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Mortenson Pond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Mortenson Pond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
10/8/1996
Waters Involved
Mud Lake
Status
Complete

Dane County: Acq-Dane County Lower Mud Lake Affholder Acquisition: Dane County shall participate in the Lake Protection Grant Program by purchasing 95 acres of land for public outdoor recreation.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Mud Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Mud Lake
Status
Complete

Dane County: Acq-Marcus Marx Property Acquisition: Dane County Parks Department will acquire 58 acres of land adjacent to Mud Lake in the Town of Roxbury in order to restore native vegetation and provide a permanent buffer that will filter upstream runoff before it enters Mud Lake and Fish Lakes. The acquisition of this property will protect the land and the waters from further degradation.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Mud Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2008
Waters Involved
Park Lake
Status
Complete

Columbia County: Lmi-Tmdl Development-Phase Ii-Park Lake: Columbia County Land and Water Conservation Department will conduct phase 2 of its TMDL development program for Park Lake. This phase will focus on continued monitoring along with the use of a graduate student to conduct water quality modeling to allow for final development of a TMDL for Park Lake, a 303(d) listed lake. The objectives of this study are to quantify P export from the watershed, and link water quality with nutrient loss from the land. Project deliverables include 1) monitoring of wetland effectiveness by measuring upstream and downstream flow and concentration; 2) Field-scale Snap-Plus and watershed-scale modeling; 3) simulating water quality changes caused by wetlands in this watershed using Army Corp PRE-WET model; 4) continuation of water quality monitoring/data collection along with targeting water sample collection adjacent to wetlands; 5) information/education efforts throughout project; and 6) compilation, documentation, and recommendations of findings. Education efforts include a news release, providing updates and final presentation through regular and annual meetings of the Lake District.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Rice Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Rice Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Rockdale Millpond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Rockdale Millpond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Salmo Pond (Raemisch Pond)
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Salmo Pond (Raemisch Pond)
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Springfield Pond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Springfield Pond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Stebbinsville Pond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Stebbinsville Pond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
1/24/1997
Waters Involved
Stewart Lake
Status
Complete

Dane County: Lmi-Stewart Lake Water And Sediment Control Basins: Dane County Proposes to construct 5 storm water detention basins to reduce the amount of sediment entering Stewart Lake.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Stewart Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Stewart Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Stoughton Millpond 429
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Stoughton Millpond 429
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Strickers Pond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Strickers Pond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Tenney Park Lagoon
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Tenney Park Lagoon
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Tiedemans Pond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Tiedemans Pond
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
5/25/1995
Waters Involved
Token Creek
Status
Complete

Dane County: Acq-Cherokee Marsh Land Acquisition: Dane County proposes to acquire approximately 110 acres of land as an addition to Cherokee Marsh for low impact recreational opportunities and lake protection. Eligible costs include acquisition of the parcel, appraisal fee and preparation of an environmental assessment.


Grant Details
Lake Protection Grant
Date
3/2/1994
Waters Involved
Unnamed
Status
Complete

Dane County: Acq-Pheasant Branch Marsh - Frederick Acquisition: Dane County will acquire approximately 161 acres of land within the Pheasant Branch Marsh for lake protection and public outdoor recreation purposes. Amendment 1: The scope is changed to reflect a change of acreage to 100.5 acres.


Grant Details
Lake Protection Grant
Date
5/25/1995
Waters Involved
Unnamed
Status
Complete

Dane County: Acq-Cherokee Marsh Land Acquisition: Dane County proposes to acquire approximately 110 acres of land as an addition to Cherokee Marsh for low impact recreational opportunities and lake protection. Eligible costs include acquisition of the parcel, appraisal fee and preparation of an environmental assessment.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Unnamed
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Unnamed
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Unnamed
Status
Complete

Dane County Parks: Aulik Acquisition-Patrick Marsh: Dane County will acquire acreage within Patrick Marsh, a DNR and Dane County project area that is identified in both the Land Legacy Report and the Dane County Parks and Open Space Plan. The Aulik property is approximately 11.6 acres along the southern shore of Patrick Marsh. The acquisition of this property will protect and enhance this natural resource site.


Grant Details
Lake Protection Grant
Date
4/1/2015
Waters Involved
Unnamed
Status
Complete

Village Of Mazomanie: Lmi-Lake Marion Family Recreational Fishery: The Village of Mazomanie will complete a large, multi-faceted lake restoration project on Lake Marion by installing an access sign at the boat landing, installing an aeration system, stocking fish, placing habitat structures on the bed, and reconfiguring and restoring large lengths of shoreline consistent with department recommendations. The boat landing access sign will explicitly reflect the Village ordinance allowing non-motorized boat use of the lake. Current steep shorelines will be graded to provide a healthy diversity of habitat, dead trees will be introduced and anchored to shore, and trees, shrubs and understory natives will be planted. Water quality will be monitored to track lake improvements. Project updates will be shared via social media, press releases, public meetings, and community volunteer workdays and celebration. Final report and other deliverables are detailed in the grant application form.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Upper Mud Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Upper Mud Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Verona Gravel Pit
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Verona Gravel Pit
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Virgin Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Virgin Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Windsor Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane Cnty Lk & Stream Classification: Dane County Department of Planning and Development will hire a project staff in order to develop a Lake Classification project, which is seen as the first step toward developing a consistent set of county-wide standards and procedures to protect Dane County Waters. Project deliverables include:a written report describing the Dane County Water Body Classification System, a bibliography of research sources, a list of navigable water bodies in Dane County sorted according to classification, and a map and GIS layer showing classified water bodies.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Windsor Lake
Status
Complete

Dane County Dept. Of Planning & Dev: Lco-Dane County Lake Classification - Phase 2: Dane County Lake Classification-Phase 2: The Phase 1 classification grant classified all county lakes and streams. This grant will take the next step by developing a management program based on the classification.

Detailed goals, methods and deliverables are outlined in the application.


Grant Details
Lake Protection Grant
Date
9/14/1994
Waters Involved
Yahara River
Status
Complete

City Of Madison: Acq-Cherokee Marsh Expansion - Muller Parcel: The City of Madison Parks Commission will acquire approximately 13.6 acres of land, for lake protection and outdoor recreation purposes, on the north shore of Lake Mendota, adjacent to property they already own. This parcel acquisition is consistent with the 1981 Cherokee Long-Range Open Space Plan (1981) which designated this land as high priority for acquisition. The land will be developed as bicycle/pedestrian/jogging and hiking trails, preservation of a scenic Lake Mendota overlook, natural woodlands and Indian burial mounds. Eligible costs include acquisition of the parcel, appraisal fee and prepration of an environmental assesment.


Grant Details
Lake Protection Grant
Date
5/25/1995
Waters Involved
Yahara River
Status
Complete

Dane County: Acq-Cherokee Marsh Land Acquisition: Dane County proposes to acquire approximately 110 acres of land as an addition to Cherokee Marsh for low impact recreational opportunities and lake protection. Eligible costs include acquisition of the parcel, appraisal fee and preparation of an environmental assessment.


Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Badger Mill Creek
Status
Complete

City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Barbian Pond
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Bass Lake
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Brandenburg Lake
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Carl Buechner Pond
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Cherokee Lake
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Cherokee Lake
Status
Complete

City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Cherokee Lake
Status
Complete

Dane County: Restoring Cherokee Lake- Sed. Hydrodynamics: Dane County Land and Water Resources Department proposes to subcontract to the UW-Madison Dept. of Civil and Environmental Engineering an integrated research effort to understand the sediment dynamics in order to plan a restoration approach. Monitoring and modeling of water flow, wave characteristics, and sediment dynamics will be done. The resulting data will be used to evaluate methods to stabilize sediments and improve water clarity in this lake and downstream waters. A high-resolution bathymetric map and a sediment profile map will be created. Partners include Town of Westport, USGS and City of Madison.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Cherokee Lake
Status
Complete

Dane County: Restoring Cherokee Lake-Carp Telemetry: Dane County Land and Water Resources Department proposes to subcontract to the UW-Madison Dept. of Civil and Environmental Engineering an integrated research effort to understand the sediment dynamics in order to plan a restoration approach. Carp movement within the lake will be monitored via telemetry tracking through a sub-contract with UW-Madison Center for Limnology, which will help determine when and where carp might be vulnerable to removal efforts as part of the overall restoration project. A final report with recommendations for restoration of Cherokee Lake will be produced and shared widely.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Crystal Lake
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Diedrich Pond
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Door Creek
Status
Complete

City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Fish Lake
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Fishers Lake
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Goose Lake
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Graber Pond
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Grass Lake
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Hook Lake
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Indian Lake
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Island Lake
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Kalscheur Pond
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Barney
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Belle View
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Harriett
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Kegonsa
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Koshkonong
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
4/1/1991
Waters Involved
Lake Mendota
Status
Complete

Dane County: Lake Mendota Storm Event Monitoring (Usgs) Phosphorus Budget: Storm-event monitoring to determine present phosphorus loadings and a phosphorus budget for Lake Mendota. Phosphorus loading will be determined through continuous flow gauging stations located at the Yahara River at the Windsor Golf Course, the SpringHarbor storm sewer in the City of Madison, and Pheasant Branch Creek in the City of Middleton. Samples collected year-round by USGS personnel at the Yahara River station and at least one of the other two stations to be anlayzed for total P and totalreactive P. Phosphorus loading from the third site will be estimated if funding constraints prevent actual sampling. Monitoring and information will be coordinated with DNR Bureau of Research and UW, which are currently conducting in-lake studies ofLake Mendota. USGS is providing 50% matching funds, local funding support is being provided by the cities of Madison and Middleton. Dane County's contribution will exceed $3,333. Information will be disseminated to the public by entire report mailings,summary report mailings. Project results will be reposited at the Dane County Regional Planning Commission and DNR-Southern District.


Grant Details
Large Scale Lake Planning
Date
4/1/1997
Waters Involved
Lake Mendota
Status
Complete

Natural Heritage Land Trust: Lake Mendota/Token Creek Watershed Study: The Dane County Natural Heritage Foundation proposes to collect hydrological, biological, and chemical information on the Token Creek watershed to develop a "water atlas" for land use and water resource planning and decision making. The atlas will include a summary of flow rates and water quality for the watershed both under current conditions and projected conditions based on future developement scenarios with and without the implementation of management measures to maintain spring flow and protect the riparian environment.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Lake Mendota
Status
Complete

Dane County: Lake Mendota Quant. Of Soilids Loading From Const.: Dane County Land Conservation Department proposes to quantify total solids loading from two residential construction sites and one commercial construction site during all phases of construction. Data will be collected prior to construction, during construction, and after final landscaping so that a complete time-series of solids loading will be obtained. Photographic documentary will occur during all phases.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Mendota
Status
Complete

City Of Middleton: Mendota Middleton Lake Rehabilitation Plan: The City of Middleton will: study the silting-in of the mouth of Pheasant Branch Creek where it enters in to Lake Mendota: update recent watershed studies to identify sediment sources, critical areas, and sensitive areas; involve the public in supporting best management practices to reduce future sedimentation; prepare a plan for dredging the area; assess the fishery; and involve the public in identifying opportunities to improve public access for fishing. A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Mendota
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2005
Waters Involved
Lake Mendota
Status
Complete

City Of Middleton: Lakeview Park Stormwater Treatment: Project will study the channel leading to an outlet on the lake where sediment is accumulating, the outfall and inventory the system. This will help evaluate and make recommendations for stormwater treatment alternatives to reduce pollutant loading to the lake.


Grant Details
Large Scale Lake Planning
Date
10/1/2005
Waters Involved
Lake Mendota
Status
Complete

Dane County: Preparation Of Apm Plan--Lake Mendota: Aquatic plant and substrate surveys will be conducted, followed by evaluation of changes over time to develop or modify APM plans for these waters.


Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Lake Mendota
Status
Complete

City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."


Grant Details
Large Scale Lake Planning
Date
2/15/2019
Waters Involved
Lake Mendota
Status
Complete

Clean Lakes Alliance: Yahara Clean 3.0 - Lake Mendota: The Clean Lakes Alliance is sponsoring a project to update the previous Yahara CLEAN watershed plan for Lake Mendota with the following goals: reconvene planning parters to a) update the 2012 watershed plan; b) include a timeline for achievement of specific goals, identify resource gaps, make recommendations on communication to the public, evaluate funding improvements, and after department review of draft survey, conduct a social survey to assess attitudes and behaviors; and c) create a partnership compact to formally adopt the plan with defined roles and expectations. Public input opportunities will be provided. Project deliverables include an updated watershed nutrient reduction plan including outreach and funding recommendations that can be formally adopted by Yahara CLEAN partners. Specific project conditions: The department must review a draft social survey instrument prior to the survey being finalized and disseminated.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Monona
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Lake Monona
Status
Complete

City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Waubesa
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Lake Waubesa
Status
Complete

City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Wingra
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Lake Wingra
Status
Complete

City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Louis Buechner Pond
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Maher Pond
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Marshall Millpond
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Maunesha Flowage
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Meier Pond
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Morse Pond
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Morse Pond
Status
Complete

City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Mortenson Pond
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Mud Lake
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Nine Springs Creek
Status
Complete

City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Rice Lake
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Rockdale Millpond
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Salmo Pond (Raemisch Pond)
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Springfield Pond
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Starkweather Creek
Status
Complete

City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Stebbinsville Pond
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Stewart Lake
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Stoughton Millpond 429
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Strickers Pond
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Strickers Pond
Status
Complete

City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Tenney Park Lagoon
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Tenney Park Lagoon
Status
Complete

City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Tiedemans Pond
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/18/1994
Waters Involved
Unnamed
Status
Complete

Dane County: Yahara River Lakes Dredging Feasibility Study: Establish criteria to evaluate potential dredging projects. Describe approaches to overall dredging program and spoils disposal alternatives. Determine general criterial and arrangements for equitably financing dredging projects.Information will be disseminated to the public by newsletter, entire report and summary report mailings, public meetings, and local newspaper articles. Project results will be reposited at Dane county Lakes & Watershed Div., Regional Planning Commissionand DNR Southern District Office.


Grant Details
Large Scale Lake Planning
Date
10/18/1994
Waters Involved
Unnamed
Status
Complete

Dane County: Yahara River Lakes Recreational Use Managment Planning: Conduct field surveys of the Yahara River lakes of the swimming beach and boat launch activities. Conduct on opinion surveys of lake users and general public, to identify the type and frequency of summer recreational activities, as well as perceivedproblems, deficiencies and conflicts. Develop recommendations to improve recreational management of the Yahara River lakes. The grantee will disseminate information to the public by newsletter, entire and summary report mailings, public meetings andlocal newspaper articles. Project results will be reposited at Dane County Lakes and Watershed Division, Regional Planning Commission and DNR Southern District.


Grant Details
Large Scale Lake Planning
Date
10/1/2000
Waters Involved
Unnamed
Status
Complete

Dane County: Development Of A Calibrated Yahara Lakes Reservior Routing Model: Dane County will work with the United States Geological Survey to develop a calibrated Yahara Lakes Reservoir routing model which will be capable of simulating lake levels and flows through the full range of conditions calibrated to historical records.

The full description of project scope and deliverables is available in the grant application, which is part of this agreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Unnamed
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Unnamed
Status
Complete

City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Upper Mud Lake
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Upper Mud Lake
Status
Complete

City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Verona Gravel Pit
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Virgin Lake
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
12/20/1990
Waters Involved
Windsor Lake
Status
Complete

Windsor Area Lake P & R District: Lake Windsor Watershed Data Collection & Sediment Study: Mapping of watershed boundaries. Mapping of land use and land cover along with slopes, soils and rainfall data. Data to be used with DNR sediment delivery model if available. One soil sample each to be taken from lake and watershed. Samples to beanalyzed for: particle size, total Kjeldahl N, P, N, K, Ca, C1, Mg, Na, pH SO4, and SDWA pesticides and herbicides. Water chemistry sampling to include one sample right after ice-out in the spring at a depth of 2-3 feet. Sample to be analyzed for: NO2NO3, total Kjeldahl N, dissolved P, total P, Ca, C1, Mg, Na, K, pH, dissolved solids, SO4, and SDWA pesticides and herbicides. Water quality analysis to be conducted by the State Lab or Hygiene. Water quality sampling will attempt to determine cause ofrecent fish kills. Estimates of volume and characteristics of incoming sediment will be made and recommendations developed to reduce erosion from high erosion producing areas. Recommendations will be made on ways to trap sediment and nutrients.Information will be distributed to the public by newsletter mailings, public meetings, local newspaper articles, and TV spots (Madison). Project results will be reposited at Windsor Town Hall and Windsor Lake office.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Windsor Lake
Status
Complete

Dane County: Comprehensive Rainfall Runoff Model For The Yahara River System: The Comprehensive Rainfall Runoff Model for the Yahara River System project will result in a comprehensive rainfall runoff model for the Yahara River System that will enable improved system management and enhance lake biota and recreation values. The model will be used to better manage lake levels, provide flood protection benefits, and enhance aquatic resources in the Yahara River and associated lakes and wetlands.

A full description of this project and its deliverables is available in the grant application, which is a part of this agreement.


Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Wingra Creek
Status
Complete

City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."


Grant Details
Large Scale Lake Planning
Date
10/18/1994
Waters Involved
Yahara River
Status
Complete

Dane County: Yahara River Lakes Dredging Feasibility Study: Establish criteria to evaluate potential dredging projects. Describe approaches to overall dredging program and spoils disposal alternatives. Determine general criterial and arrangements for equitably financing dredging projects.Information will be disseminated to the public by newsletter, entire report and summary report mailings, public meetings, and local newspaper articles. Project results will be reposited at Dane county Lakes & Watershed Div., Regional Planning Commissionand DNR Southern District Office.


Grant Details
Large Scale Lake Planning
Date
10/18/1994
Waters Involved
Yahara River
Status
Complete

Dane County: Yahara River Lakes Recreational Use Managment Planning: Conduct field surveys of the Yahara River lakes of the swimming beach and boat launch activities. Conduct on opinion surveys of lake users and general public, to identify the type and frequency of summer recreational activities, as well as perceivedproblems, deficiencies and conflicts. Develop recommendations to improve recreational management of the Yahara River lakes. The grantee will disseminate information to the public by newsletter, entire and summary report mailings, public meetings andlocal newspaper articles. Project results will be reposited at Dane County Lakes and Watershed Division, Regional Planning Commission and DNR Southern District.


Grant Details
Large Scale Lake Planning
Date
10/1/2000
Waters Involved
Yahara River
Status
Complete

Dane County: Development Of A Calibrated Yahara Lakes Reservior Routing Model: Dane County will work with the United States Geological Survey to develop a calibrated Yahara Lakes Reservoir routing model which will be capable of simulating lake levels and flows through the full range of conditions calibrated to historical records.

The full description of project scope and deliverables is available in the grant application, which is part of this agreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2005
Waters Involved
Yahara River
Status
Complete

City Of Middleton: Lakeview Park Stormwater Treatment: Project will study the channel leading to an outlet on the lake where sediment is accumulating, the outfall and inventory the system. This will help evaluate and make recommendations for stormwater treatment alternatives to reduce pollutant loading to the lake.


Grant Details
Large Scale Lake Planning
Date
10/1/2005
Waters Involved
Yahara River
Status
Complete

Dane County: Preparation Of Apm Plan--Lake Mendota: Aquatic plant and substrate surveys will be conducted, followed by evaluation of changes over time to develop or modify APM plans for these waters.


Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Yahara River
Status
Complete

City Of Madison: Infos Model For Yahara Lakes: "The City of Madison proposes to develop the first phase of an evaluation and prediction model for the upper half of the Yahara Watershed, called Integrated Nowcast and Forecast Operation System (INFOS). This is a real-time, three-dimensional, operational model that can provide information to lake managers to assess water level orders in conjunction with dam operations on the Yahara system, predict flood heights under various scenarios which may assist planning efforts, and identify constrictions that need to be removed to reduce flooding. The model can help define floodplain zones for improved planning, among other benefits. The deliverable will consist of a final report in hard copy and electronic copy describing the web browser interface, and give the final site address of the online model. All raw data will be included in digital format."


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Yahara River
Status
Complete

Dane County: Restoring Cherokee Lake- Sed. Hydrodynamics: Dane County Land and Water Resources Department proposes to subcontract to the UW-Madison Dept. of Civil and Environmental Engineering an integrated research effort to understand the sediment dynamics in order to plan a restoration approach. Monitoring and modeling of water flow, wave characteristics, and sediment dynamics will be done. The resulting data will be used to evaluate methods to stabilize sediments and improve water clarity in this lake and downstream waters. A high-resolution bathymetric map and a sediment profile map will be created. Partners include Town of Westport, USGS and City of Madison.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Yahara River
Status
Complete

Dane County: Restoring Cherokee Lake-Carp Telemetry: Dane County Land and Water Resources Department proposes to subcontract to the UW-Madison Dept. of Civil and Environmental Engineering an integrated research effort to understand the sediment dynamics in order to plan a restoration approach. Carp movement within the lake will be monitored via telemetry tracking through a sub-contract with UW-Madison Center for Limnology, which will help determine when and where carp might be vulnerable to removal efforts as part of the overall restoration project. A final report with recommendations for restoration of Cherokee Lake will be produced and shared widely.


Grant Details
Large Scale Lake Planning
Date
2/15/2019
Waters Involved
Yahara River
Status
Complete

Clean Lakes Alliance: Yahara Clean 3.0 - Lake Mendota: The Clean Lakes Alliance is sponsoring a project to update the previous Yahara CLEAN watershed plan for Lake Mendota with the following goals: reconvene planning parters to a) update the 2012 watershed plan; b) include a timeline for achievement of specific goals, identify resource gaps, make recommendations on communication to the public, evaluate funding improvements, and after department review of draft survey, conduct a social survey to assess attitudes and behaviors; and c) create a partnership compact to formally adopt the plan with defined roles and expectations. Public input opportunities will be provided. Project deliverables include an updated watershed nutrient reduction plan including outreach and funding recommendations that can be formally adopted by Yahara CLEAN partners. Specific project conditions: The department must review a draft social survey instrument prior to the survey being finalized and disseminated.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Badger Mill Creek
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Badger Mill Creek
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Barbian Pond
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Barbian Pond
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Bass Lake
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Bass Lake
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Brandenburg Lake
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Brandenburg Lake
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Carl Buechner Pond
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Carl Buechner Pond
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Cherokee Lake
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Cherokee Lake
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Cherokee Lake
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Cherokee Lake
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
2/15/2015
Waters Involved
Cherokee Lake
Status
Complete

Dane County: Evaluation Of Floating Bog Initiative As Fish Habitat: Dane County Land & Water Conservation Department will monitor small, non-game fish that may be utilizing the Floating Bog Interceptor structures in Cherokee Marsh, Dane County. Cherokee Marsh, a key estuary of Lake Mendota, has been the subject of much chemistry monitoring. Carp tend to dominate the limnetic zone, but no studies have examined whether remnant populations of small fish may still be living in the lake. If they are, they are likely near the FBI\2019s. This monitoring effort will investigate this. The nearshore fish are important indicators of lake health and water quality, and this evaluation will assist lake managers in ongoing efforts to improve the Yahara Chain of Lakes. Information will be shared with the department, Friends of Cherokee Marsh, and the University, as well as posted on the Dane County website.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Crystal Lake
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Crystal Lake
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Diedrich Pond
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Diedrich Pond
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Door Creek
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Door Creek
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Fish Lake
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Fish Lake
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Fishers Lake
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Fishers Lake
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Goose Lake
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Goose Lake
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Graber Pond
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Graber Pond
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Grass Lake
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Grass Lake
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Hook Lake
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Hook Lake
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Indian Lake
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Indian Lake
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Island Lake
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Island Lake
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Kalscheur Pond
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Kalscheur Pond
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Barney
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Barney
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Belle View
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Belle View
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Harriett
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Harriett
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Kegonsa
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Kegonsa
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Koshkonong
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Koshkonong
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Mendota
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Mendota
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Lake Mendota
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Lake Mendota
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2010
Waters Involved
Lake Mendota
Status
Complete

Dane County: Algae Boom Study- Dane Co: Dane County is investigating the utility of beach booms to improve water quality for swimmers at area beaches. The booms are intended to divert floating planktonic algae scums from the beach areas being tested. Since they received the initial grant ((SPL-226-10, \201CAlgae Boom Study \2013 Dane County\201D), the scope of this project has expanded, advancing the knowledge even further than originally intended, and they are working with many more partners. In 2010, Dane County partnered with City of Madison Engineering and Parks, DNR, and UW Limnology staff, and used county funds to purchase and install floating booms around the swim areas of Bernie\2019s and BB Clarke Beach to act as deflectors for floating weeds and algae scum. The first year was a success and the project was expanded to Brittingham Beach in 2011.

In 2011, the County Board allocated additional funding for beach deflector pilot projects, and those funds are being used in 2012 to support purchase and installation of an additional floating boom system at Warner Beach in the City of Madison, in order to keep algae scum and nuisance floating weeds away from the swim area. Dane County will apply the $3000 grant (SPL-226-10) to the costs of purchasing this floating boom system for Warner Beach.

Part of the county funding in 2012 will support development of a detailed written report of the various deflector projects on different beaches and under different current situations, and associated City of Madison water quality testing. The written report will include a discussion of project results and their applicability to other areas, and recommendations about the need for funding and program continuation. This report, including beach and boom photos, will be provided to DNR and all project partners, and posted on Dane County and partner websites.




Grant Details
Small Scale Lake Planning
Date
2/15/2015
Waters Involved
Lake Mendota
Status
Complete

Clean Lakes Alliance: Near Shore Water Quality Monitoring: Clean Lakes Alliance will run a program to increase near-shore water quality monitoring in the Madison Lakes in 2015 to help with beach closure timeliness, and improve ability of the public to make decisions about swimming. They will recruit, train and equip lifeguards or volunteers monitor a minimum of 6 and up to a maximum of 16 public beaches, with a focus on once per week E. coli sampling. In addition, up to 44 citizen volunteers will do weekly end-of-pier assessments of turbidity, temperature and blue green algae presence. Samples will be collected and delivered to the city-county health lab. Data will be analyzed and shared with researchers at UW Madison who are interested in modeling algae blooms within near-shore areas, and made available to the public on a mobile-ready website. Also, a community presentation will be given at the end of the season to discuss findings and recommendations, and a final report, including raw data, will be submitted to the department.


Grant Details
Small Scale Lake Planning
Date
2/15/2015
Waters Involved
Lake Mendota
Status
Complete

Clean Lakes Alliance: Yahara Lakes And Beaches Mobile-Ready Website Development: Clean Lakes Alliance will develop a website for mobile-phone use particularly by users of the Madison Lakes to get up-to-date information about lake water quality in the nearshore area, which has been collected and reported by an existing volunteer and municipal lifeguard network. This will allow the public to be better informed of risks and opportunities for lake recreation. They will deliver a user-friendly website that displays real-time information about public beaches and near-shore waters, and a final report with recommendations for improving monitoring, partner collaboration, data entry, user-interface, and information sharing. They will also hold meetings with various local entities to evaluate the program and strengthen partnerships. Data summaries will be shared with participants, researchers and other interested people. At least one community presentation will be given at the end of the season.


Grant Details
Small Scale Lake Planning
Date
2/15/2017
Waters Involved
Lake Mendota
Status
Complete

Dane County: Survey Of Lake Mendota Nearshore Fish Populations: Dane County will survey sensitive, nearshore fish populations to evaluate their status in Lake Mendota, and factors that may be affecting species diversity. Nongame and juvenile stage sportfish will be surveyed using a towed electroshocker at about 20 nearshore sites. Habitat features will be documented. Deliverables include fish community and habitat data, and a final report that includes baseline raw data for comparison to future surveys, and an assessment of likely environmental factors that influence these species. The final report will be shared with key lake partners including DNR, City of Madison, City of Monona, Clean Lakes Alliance and Yahara Fish Club.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Monona
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Monona
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Lake Monona
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Lake Monona
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Waubesa
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Waubesa
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Lake Waubesa
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Lake Waubesa
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Wingra
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Wingra
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Lake Wingra
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Lake Wingra
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Louis Buechner Pond
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Louis Buechner Pond
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Maher Pond
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Maher Pond
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Marshall Millpond
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Marshall Millpond
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Maunesha Flowage
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Maunesha Flowage
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Meier Pond
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Meier Pond
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Morse Pond
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Morse Pond
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Morse Pond
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Morse Pond
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Mortenson Pond
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Mortenson Pond
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Mud Lake
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Mud Lake
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Nine Springs Creek
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Nine Springs Creek
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Rice Lake
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Rice Lake
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Rockdale Millpond
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Rockdale Millpond
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Salmo Pond (Raemisch Pond)
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Salmo Pond (Raemisch Pond)
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Springfield Pond
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Springfield Pond
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Starkweather Creek
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Starkweather Creek
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Stebbinsville Pond
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Stebbinsville Pond
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Stewart Lake
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Stewart Lake
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Stoughton Millpond 429
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Stoughton Millpond 429
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Strickers Pond
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Strickers Pond
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Strickers Pond
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Strickers Pond
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Tenney Park Lagoon
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Tenney Park Lagoon
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Tenney Park Lagoon
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Tenney Park Lagoon
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Tiedemans Pond
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Tiedemans Pond
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Unnamed
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Unnamed
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Unnamed
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Unnamed
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Upper Mud Lake
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Upper Mud Lake
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Upper Mud Lake
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Upper Mud Lake
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Verona Gravel Pit
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Verona Gravel Pit
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Virgin Lake
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Virgin Lake
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Windsor Lake
Status
Complete

Dane County: Dane County Workshop For Local Resource Groups: Dane County will use this grant to provide a local workshop for networking between local resource protection groups. This networking would allow sharing of information and strategies for resource protection, strengthen relationships and create new ones, and continue to collaborate on county-wide lake and watershed protection and improvement issues. This project will also involve printing an in-depth "State of Dane County Waters" document.

The deliverable will be evidence that the workshop was planned, evidence that groups participated in the event, and 2500 copies of the in-depth "State of Dane County Waters" document.


Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Windsor Lake
Status
Complete

Dane County: State Of The Waters' Publication: Dane County will use this grant to complete and publish a popularized"State of Dane County Waters" brochure. Draft documents will be reviewed by DNR staff and others.

The deliverable will be the comprehensive documents.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Wingra Creek
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Wingra Creek
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Yahara River
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 1: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at the Vilas Park Beach on Lake Wingra, and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Yahara River
Status
Complete

City Of Madison: Yahara Lakes Beach Bacteria Reduction-Phase 2: Public Health- Madison and Dane County proposes to evaluate and design a conceptual plan using BMPs to reduce bacterial contamination of the water at Bernie's Beach on Lake Monona (Monona Bay) , and to decrease the number of days per summer during which the beach is closed due to bacterial pollution. Deliverables include a final report in hard and electronic copy describing the ranking process, and the conceptual engineering plan design. One meeting with the relevant neighborhood group will take place.


Grant Details
Small Scale Lake Planning
Date
4/1/2010
Waters Involved
Yahara River
Status
Complete

Dane County: Algae Boom Study- Dane Co: Dane County is investigating the utility of beach booms to improve water quality for swimmers at area beaches. The booms are intended to divert floating planktonic algae scums from the beach areas being tested. Since they received the initial grant ((SPL-226-10, \201CAlgae Boom Study \2013 Dane County\201D), the scope of this project has expanded, advancing the knowledge even further than originally intended, and they are working with many more partners. In 2010, Dane County partnered with City of Madison Engineering and Parks, DNR, and UW Limnology staff, and used county funds to purchase and install floating booms around the swim areas of Bernie\2019s and BB Clarke Beach to act as deflectors for floating weeds and algae scum. The first year was a success and the project was expanded to Brittingham Beach in 2011.

In 2011, the County Board allocated additional funding for beach deflector pilot projects, and those funds are being used in 2012 to support purchase and installation of an additional floating boom system at Warner Beach in the City of Madison, in order to keep algae scum and nuisance floating weeds away from the swim area. Dane County will apply the $3000 grant (SPL-226-10) to the costs of purchasing this floating boom system for Warner Beach.

Part of the county funding in 2012 will support development of a detailed written report of the various deflector projects on different beaches and under different current situations, and associated City of Madison water quality testing. The written report will include a discussion of project results and their applicability to other areas, and recommendations about the need for funding and program continuation. This report, including beach and boom photos, will be provided to DNR and all project partners, and posted on Dane County and partner websites.




Grant Details
Small Scale Lake Planning
Date
2/15/2015
Waters Involved
Yahara River
Status
Complete

Clean Lakes Alliance: Near Shore Water Quality Monitoring: Clean Lakes Alliance will run a program to increase near-shore water quality monitoring in the Madison Lakes in 2015 to help with beach closure timeliness, and improve ability of the public to make decisions about swimming. They will recruit, train and equip lifeguards or volunteers monitor a minimum of 6 and up to a maximum of 16 public beaches, with a focus on once per week E. coli sampling. In addition, up to 44 citizen volunteers will do weekly end-of-pier assessments of turbidity, temperature and blue green algae presence. Samples will be collected and delivered to the city-county health lab. Data will be analyzed and shared with researchers at UW Madison who are interested in modeling algae blooms within near-shore areas, and made available to the public on a mobile-ready website. Also, a community presentation will be given at the end of the season to discuss findings and recommendations, and a final report, including raw data, will be submitted to the department.


Grant Details
Small Scale Lake Planning
Date
2/15/2015
Waters Involved
Yahara River
Status
Complete

Clean Lakes Alliance: Yahara Lakes And Beaches Mobile-Ready Website Development: Clean Lakes Alliance will develop a website for mobile-phone use particularly by users of the Madison Lakes to get up-to-date information about lake water quality in the nearshore area, which has been collected and reported by an existing volunteer and municipal lifeguard network. This will allow the public to be better informed of risks and opportunities for lake recreation. They will deliver a user-friendly website that displays real-time information about public beaches and near-shore waters, and a final report with recommendations for improving monitoring, partner collaboration, data entry, user-interface, and information sharing. They will also hold meetings with various local entities to evaluate the program and strengthen partnerships. Data summaries will be shared with participants, researchers and other interested people. At least one community presentation will be given at the end of the season.


Grant Details
Small Scale Lake Planning
Date
2/15/2015
Waters Involved
Yahara River
Status
Complete

Dane County: Evaluation Of Floating Bog Initiative As Fish Habitat: Dane County Land & Water Conservation Department will monitor small, non-game fish that may be utilizing the Floating Bog Interceptor structures in Cherokee Marsh, Dane County. Cherokee Marsh, a key estuary of Lake Mendota, has been the subject of much chemistry monitoring. Carp tend to dominate the limnetic zone, but no studies have examined whether remnant populations of small fish may still be living in the lake. If they are, they are likely near the FBI\2019s. This monitoring effort will investigate this. The nearshore fish are important indicators of lake health and water quality, and this evaluation will assist lake managers in ongoing efforts to improve the Yahara Chain of Lakes. Information will be shared with the department, Friends of Cherokee Marsh, and the University, as well as posted on the Dane County website.


Grant Details
Small Scale Lake Planning
Date
2/15/2017
Waters Involved
Yahara River
Status
Complete

Dane County: Survey Of Lake Mendota Nearshore Fish Populations: Dane County will survey sensitive, nearshore fish populations to evaluate their status in Lake Mendota, and factors that may be affecting species diversity. Nongame and juvenile stage sportfish will be surveyed using a towed electroshocker at about 20 nearshore sites. Habitat features will be documented. Deliverables include fish community and habitat data, and a final report that includes baseline raw data for comparison to future surveys, and an assessment of likely environmental factors that influence these species. The final report will be shared with key lake partners including DNR, City of Madison, City of Monona, Clean Lakes Alliance and Yahara Fish Club.


Grant Details
Date
2/24/2003
Waters Involved
Lake Mendota
Status
Complete

City Of Middleton: Res-Lakeview Park North Wetland Restoration: The City of Middleton will do a vegetative restoration of the Area G wetland ditch at Lakeview Park North on the West shore of Lake Mendota. They will do a trash cleanup, remove hazard trees, work to eradicate exotic plant species, and restore native wetland species at the site.


A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Date
3/14/2003
Waters Involved
Lake Mendota
Status
Complete

City Of Middleton: Res-Middleton Hills Detention Pond & Savanna Restoration: The City of Middleton will revegetate the degraded detention pond shoreline of the Middleton Hills Detention Pond and surrounding upland using native perennial species in order to protect the wetland area from the continued erosional losses. ( Government Lot 10 in Section 1, Township 7 North, Range 8 East, Dane County Wisconsin)

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Date
9/1/2002
Waters Involved
Unnamed
Status
Complete

City Of Madison: Res-Stabilization & Restoration Of Wetlands Adjacent Ot Yahara River: The City of Madison will revegetate the Cherokee Marsh adjacent to the Yahara River.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Date
9/1/2002
Waters Involved
Yahara River
Status
Complete

City Of Madison: Res-Stabilization & Restoration Of Wetlands Adjacent Ot Yahara River: The City of Madison will revegetate the Cherokee Marsh adjacent to the Yahara River.

A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.


Grant Details
Targeted Runoff - Rural Construction
Date
4/1/2006
Waters Involved
German Valley Br
Status
Complete

Dane County Land Conservation Dept: German Valley Creek Middle: To cost-share installation of streambank restoration and protection practices designed to prevent unlimited livestock access to waters of the state.


Grant Details
Targeted Runoff - Rural Construction
Date
4/1/2006
Waters Involved
German Valley Br
Status
Complete

Dane County: German Valley North: Installation of streambank restoration/protection practices, to include: Riprap, rock weirs, shaping & seeding, critical area stabilization, and lunkers along approximately 14,000 feet of German Valley Creek north of grantee's 2004 project.


Grant Details
Targeted Runoff - Rural Construction
Date
4/1/2006
Waters Involved
German Valley Br
Status
Complete

Dane County: German Valley South: to costshare at 70% streambank rehabilitation within the southern segment of German Valley Creek


Grant Details
Total Maximum Daily Load
Date
4/1/2006
Waters Involved
German Valley Br
Status
Complete

Dane County Land Conservation Dept: German Valley Creek Middle: To cost-share installation of streambank restoration and protection practices designed to prevent unlimited livestock access to waters of the state.


Grant Details
Urban Nonpoint - Stormwater Construction
Date
1/1/2015
Waters Involved
Lake Monona
Status
Complete

City Of Monona: Storm Water Treatment Devices: This grant provides funding and authorizes cost-share reimbursement by the department for the above-named project as described in the grant application submitted for calendar year 2015 for the eligible storm water construction activities listed in the application to address nonpoint sources of pollution. The cost-share reimbursement rate will be up to 18% of the actual eligible project costs, to the maximum amount contained in Part 2.


Grant Details
Urban Nonpoint - Stormwater Planning
Date
1/1/2005
Waters Involved
Yahara River
Status
Complete

Village Of De Forest: Stormwater Planning Updates: updating of the Villages's storm water management plan, to include revision of stormwater, erosion & illicit discharge control ordinances, mapping, assessment of alternative practice installations, and creation/implementation of a municipal storm water utility.


Grant Details
River Planning Grant
Date
5/1/2000
Waters Involved
Token Creek
Status
Complete

Token Creek Watershed Association: Token Creek Watershed Strategic Plan: The Token Creek Watershed Association will integrate public education and professionally lead workshops to:1) raise public awareness of stream protection benefits, 2) increase grass-roots membership in the organization, 3) train members of TCWA, and 4) aid in the ongoing process of strategic planning. Increasing public awareness of the watershed and TCWA will increase public support for TCWA activities as well as increasing memberships in the organization.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
River Planning Grant
Date
7/1/2001
Waters Involved
Token Creek
Status
Complete

Token Creek Watershed Association: Token Creek Watershed Association Capacity Building: The Token Creek Watershed Association will work to enhance their capacity as an organization by hiring a half time employee and by expanding their community education.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
River Planning Grant
Date
7/1/2001
Waters Involved
Yahara River
Status
Complete

Village Of De Forest: Yahara River Streambank Planning: The Village of DeForest will address the problem of erosion of Yahara River Streambank by hiring a consultant to assist with restoring the river's streambanks, creating a buffer zone throughout the river corridor, creating an ordinance to protect the buffer zone and river quality, and developing informational brochures to be distributed to the public regarding the Yahara River.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
River Planning Grant
Date
7/1/2006
Waters Involved
Yahara River
Status
Complete

Village Of De Forest: Upper Yahara River Protection Organization: The primary goals and objectives of this project are to use the resources obtained through this grant in a concurrent effort to educate, raise awareness and energize activists in the DeForest community so as to be ready to partner with other public units to attack the problems facing the Yahara River, and at the same time, enhance its public benefits.

A full description of the project goal and objectives are in the grant application, which is a part of the application. The DNR will be provided with both a paper copy and an electronic copy of the final report.




Grant Details
River Planning Grant
Date
7/1/2008
Waters Involved
Yahara River
Status
Complete

Dane County: Water Resources Practicum-Yahara River Basin: The Dane County Office of Lakes and Watersheds will sponsor a project involving the UW Water Resource Management graduate class. This class will assist in the assessment and modeling of sediment and phosphorus in the Yahara River and its tributaries. Additionally, this class will also identify and design the most promising strategies for reducing these pollutants. Project deliverables will include a final report and public presentation of the findings.


Grant Details
River Planning Grant
Date
7/1/2008
Waters Involved
Yahara River
Status
Complete

Friends Of Cherokee Marsh: Friends Of Cherokee Marsh Group Building & Planning: The Friends of Cherokee Marsh, Inc.,will sponsor a project involving Cherokee Marsh, Dane County. The goal of this project is to strengthen and expand membership of this group in order to more effectively protect, preserve, and restore the beauty, value and health of the Cherokee Marsh and Upper Yahara river watershed. Project deliverables include: 1) obtain federal 501(c)(3) status; 2) design and print brochures; 3) educate the public with the issuance of informational pieces in the neighborhood newspaper; and 4) work with Natural Heritage Land Trust and hold a strategic planning session.


Grant Details
River Planning Grant
Date
7/1/2008
Waters Involved
Yahara River
Status
Complete

Gathering Waters, Inc.: Yahara Watershed Visioning Website Development: Gathering Waters, Inc. will sponsor a project to create a website involving the Yahara Watershed, Dane County. As part of this visioning process, an internet site will be developed to educate and inform the public of water issues specific to the Yahara River watershed. Deliverables include: 1) creation of a basin-wide website, Facebook Page, and YouTube materials; 2) at least one MP3 download and 1 powerpoint; 3) gather/poll/survey information and views from the public on water issues (to include bilingual polling/survey capabilities); and 4) partner with other Friends groups and entities to facilitate more comprehensive planning.


Grant Details
River Planning Grant
Date
7/1/2010
Waters Involved
Yahara River
Status
Complete

Friends Of Yahara River Headwaters, Inc: Volunteer Monitoring: The Friends of the Yahara River Headwaters, Inc. will sponsor a project to create a volunteer water quality monitoring program focused on the Yahara River and its tributaries where they flow through the Village of DeForest. Project deliverables include: 1.) establish a program to obtain Level 1 & 2 quality water quality data using basic and advanced monitoring equipment, 2) increase sampling intensity and frequency over current levels of WDNR & CARPC monitoring, 3) increase the membership of FYRH through public presentations and workshops of water quality monitoring and recruitment of volunteer water quality monitors, 4) provide the names of ten new members in FYRH and the names of four new monitoring volunteers, 5) foster future watershed stewards by providing a local high school class the opportunity to incorporate water quality monitoring into its curriculum. , 6) provide one monitoring training session agenda with date and location and attendance list, 7) provide two public meeting attendance lists with date and location, 8) provide an electronic copy or weblink to monthly sampling data for nine Level 1 and 2 parameters, 9) provide an electronic copy, weblink or photos of Watershed and river channel maps, 10) provide an electronic copy of data provided to Deforest Public Works and DNR - Mike Sorge


Grant Details
River Protection Grant
Date
5/1/2008
Waters Involved
Yahara River
Status
Complete

River Alliance Of Wisconsin: Stebbinsville Dam Removal-Yahara River: River Alliance of Wisconsin is sponsoring a project to remove the Stebbinsville Dam on the Yahara River in Rock County. The removal of the Stebbinsville Dam and its impoundment will promote further fish migration and further the Yahara River's improvement as an aquatic riverine habitat. Removal of the dam will allow the river channel to return to its natural flow and course. This project will also include activities to stabilize, restore, and enahnce habitat.


Grant Details
River Protection Grant
Date
3/15/2024
Waters Involved
Yahara River
Status
Complete

Village Of Deforest: Res - Yahara River Streambank Stabilization - Phase 1: The Village of De Forest is sponsoring a project to address streambank erosion to enhance the ecological integrity of the Yahara River corridor south of South Street.

Activities: 1) Review topographic and geomorphic data and collect additional survey 2) Conduct NHI and historic/archaeological assessment 3) If needed, conduct wetland delineation 4) Prepare construction plan sheets in alignment with NRCS Standard 580 5) Obtain necessary permits and approvals 6) Use bioengineering to stabilize the streambank 7) Revegetate streambanks with native seed 8) Conduct water quality monitoring 9) Monitor sites for at least 2 years post-construction.

Deliverables: 1) Topographic and geomorphic field surveys and data 2) Endangered resources review and a Phase 1 report 3) Wetland delineation report, if needed 4) Final construction documents 5) Copies of approvals and permits 6) Before and after photos of streambank stabilization and native seeding 8) Water quality monitoring data and summary report with pre- and post- data compared.

Conditions:
1) Do not duplicate scope of work defined and funded under grant TUC13118Y24.
2) Enter into land use agreements for lands not owned by Grantee and provide copy of agreement recorded at the County Register of Deeds office. The recorded landuse agreement must contain a 20-year operation and maintenance plan.
4) Note all parcels owned by the Village on this grant agreement and record the agreement at the County Register of Deeds office.

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.



Monitoring & Projects

Projects including grants, restoration work and studies shown below have occurred in this watershed. Click the links below to read through the text. While these are not an exhaustive list of activities, they provide insight into the management activities happening in this watershed.

Grants and Management Projects
Yahara River and Lake Mendota Watershed
Watershed Recommendations
Adaptive Management WQ Trading
Deerfield WWTF Adaptive Management Plan
Date
Status
AMP to achieve compliance with phosphorus water quality standards in accordance with s. NR 217.19, Wis. Adm. Code.
2/1/2019
In Progress
Projects
 
Best Management Practices, Implement
Byrne Pond Retrofit
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin?s waters and was funded by the 319 grant. Specifically, the municipality will construct/install a bioretention for infiltration basin to remedy discharges of total suspended solids in urban runoff.
1/1/2017
In Progress
Projects
 
Best Management Practices, Implement
Columbia County TRM 2017
Date
Status
This project is a landowner installation of nonpoint source best management practices to contribute to the restoration of Wisconsin?s waters and was funded by the 319 grant. Specifically, the grantee will implement: a manure storage system, a barnyard runoff control system, critical area stabilization, roof runoff systems, a waste transfer system, wastewater treatment strips to remedy discharges of manure, sediment and phosphorus in runoff entering waters of the state and address the following NR 151 Agricultural Performance Standards and Prohibitions: sheet, rill, and wind erosion; manure storage facilities-new/significant alterations; process wastewater handling; clean water diversions; nutrient management; prevention of overflow from manure storage facilities; prevention of direct runoff from a feedlot or stored manure
1/1/2017
In Progress
Projects
 
Best Management Practices, Implement
Columbia County TRM 2017
Date
Status
This project is a landowner installation of nonpoint source best management practices to contribute to the restoration of Wisconsin?s waters and was funded by the 319 grant. Specifically, the grantee will implement: a manure storage system, a manure storage system closure, a barnyard runoff control system, critical area stabilization, diversions, heavy use area protection, roofing, roof runoff systems, a waste transfer system, wastewater treatment strips, relocation/abandonment of animal feeding operation, a milking center waste control system, and a feed storage runoff control system to remedy discharges of manure, sediment and phosphorus in runoff entering waters of the state and address the following NR 151 Agricultural Performance Standards and Prohibitions: sheet, rill, and wind erosion; process wastewater handling; clean water diversions; nutrient management; prevention of overflow from manure storage facilities; and prevention of direct runoff from a feedlot or stored manure.
1/1/2017
In Progress
Projects
 
Best Management Practices, Implement
Middleton Storm Water Master Plan Update
Date
Status
This project promotes nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: updated construction erosion control ordinance, updated storm water ordinance for new development and re-development, new ordinances that affect runoff from the developed urban area, updated ordinances that affect runoff from the developed urban area, new feasibility analysis of alternative funding mechanisms, updated storm water management plan for the developed urban area, and updated storm water management plan for new development.
1/1/2016
In Progress
Projects
Documents
 
Best Management Practices, Implement
Deforest Storm Water Master Plan
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin?s waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: updated construction erosion control ordinance, updated storm water ordinance for new development and re-development, updated low impact development/conservation subdivision ordinance, updated ordinances that affect runoff from the developed urban area, updated storm water financing mechanism, updated storm water management plan for the developed urban area, and updated storm water management plan for new development.
1/1/2016
In Progress
Projects
Documents
 
Best Management Practices, Implement
Middleton Beach Road - Green Street Design
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Specifically, the grantee will implement: green street design.
1/1/2015
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
CBSM Program in place in 2012
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Fish Management, Access
northern pike spawning habitat
Date
Status
Dane County should work with WDNR to establish water levels that accommodate northern pike spawning habitat and improved water quality on tributaries to the Madison Lakes.
1/1/2010
Proposed
 
Hire County Aquatic Invasives Coordinator
 
Date
Status
Hire Aquatic Invasives (AIS) County Coordinator - Columbia
1/1/2011
In Progress
Projects
 
Monitor Water Quality or Sediment
Pine Spring TP
Date
Status
Category 2. 2018 TP Results: May Exceed. Station: 133472. AU: 3991043.
1/1/2018
Proposed
Projects
 
Restore Riparian Habitat
2015 Pheasant Branch Streambank Rest. & Habitat Enhancement
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin?s waters and was funded by the 319 grant. Specifically, the grantee will implement: restoration and habitat enhancement.
1/1/2015
In Progress
Projects
Documents
 
Stormwater Planning, Implementation
Stormwater Pretreatment and Diversion to Manitou Pond
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. The municipality will construct/install a proprietary storm water sedimentation device to remedy discharges of total suspended solids in urban runoff.
1/1/2017
In Progress
Projects
 
Stormwater Planning, Implementation
Stoughton - TMDL Storm Water Plan
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: updated construction erosion control ordinance, updated storm water ordinance for new development and re-development, updated ordinances that affect runoff from the developed urban area, updated storm water financing mechanism, updated storm water management plan for the developed urban area, and updated storm water management plan for new development.
1/1/2016
In Progress
Projects
Documents
 
Stormwater Planning, Implementation
Cross Plains - Storm Water Quality Management Plan
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin?s waters and was funded by the 319 grant. Specifically, the grantee will implement: storm water quality management plan.
1/1/2015
In Progress
Projects
 
TMDL Monitoring
Token Creek TMDL
Date
Status
Token Creek was approved and implemented in 1999. The Dam was removed and the stream restored.
7/1/2009
In Progress
Projects
Documents
 
Water Quality Planning
ARRA 18 CARPC Supplemental WQM Plan Funding
Date
Status
Supplemental funds for water quality planning in designated management areas; multi-agency watershed initiative to restore, protect, and maintain Yahara Watershed; contract with Capital Area Regional Planning Commission.
1/31/2010
In Progress
Projects
Documents
 
Watershed Mapping or Assessment
ARRA 18 CARPC Supplemental WQM Plan Funding
Date
Status
Supplemental funds for water quality planning in designated management areas; multi-agency watershed initiative to restore, protect, and maintain Yahara Watershed; contract with Capital Area Regional Planning Commission.
1/31/2010
In Progress
Projects
Documents
 
Yahara River and Lake Mendota WatershedWatershed History Note

Morrisonville (nicknamed Frogtown, USA) is an unincorporated community in Dane County and is located within the Yahara River-Lake Mendota watershed. Morrisonville is named after James Morrison, a Scottish immigrant who settled in the area in 1843. He purchased approximately 290 acres of land from the United States government. He and his family originally lived in a temporary shelter above the headwaters of the Yahara River before moving into a permanent log structure. In the 1860s, construction began on the Milwaukee Road railroad. Morrison sold 43 acres of land to a prospective railroad company in 1862 on the contingency that a station would be built in the area where Morrison and his family lived. It is not known exactly when construction began on the Morrisonville depot, but the structure was designed by J.U. Nettenstrom. The Madison and Portage Railroad Company formed on August 9, 1870 in order to build a portion of the railroad running from Madison to Portage. In 1871, the railroad was activated. The railway was leased and later sold in 1878 to the Chicago, Milwaukee, St. Paul and Pacific Railroad. In the early years of Morrisonville, and into the 20th century, the railroad brought much business and commerce to the community. Many residences and businesses, including a hotel and stable, were established. A large number of goods, including tobacco, passed through the town, making it a local center for commerce. By the mid-20th century, travel and commerce on the railways had declined greatly, and passenger service for the Madison to Portage railroad ended in 1952. The railroad, now part of the Soo Line, still runs through the community almost daily.

Date  2010