Grant Details
Aquatic Invasives Control
Date
4/15/2015
Waters Involved
Bughs Lake
Status
Complete
Bughs Lake Management District: Bughs Lake Hwm Management: The Bughs Lake Management District is sponsoring an AIS control grant for Bughs Lake in Waushara County. The goal of the project is to reduce to the maximum extent possible Hybrid EWM - AIS populations within the system.
The project objectives / activities are as follows:
1. Pre and two post plant point intercept surveys 2. Whole-lake fluridone slow release pellet treatment at 16PPB. 3.Maintain 2-4 PPB within the treatment areas for 120 days with a potential bump application if levels drop below 3 P 4.Residual herbicide monitoring 5.Full point-intercept plant surveys pre and post-treatment 6.Assist Golden Sands Clean Boats / Clean Waters program 7.Scuba diver assisted harvesting of EWM 8.Management report to quantify results, make future recommendations.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional lake coordinator.
Final plan needs Department review and approval.
Grant Details
Aquatic Invasives Control
Date
3/15/2021
Waters Involved
Bughs Lake
Status
Complete
Bughs Lake Management District: Bughs Lake Hwm Control: The Bughs Lake District is sponsoring an AIS Control Grant to Manage Eurasian Water Milfoil (EWM). This will involve the initiation of a large-scale, system wide EWM control in 2021. Direct EWM whole-lake control measures will be taken on Bughs Lake in 2022. To assess results, annual point intercept surveys will be completed in 2021-2024. A comprehensive final report will summarize all project work and lay out management guidelines for the future based on project results.
Project deliverables include: This project will focus on establishing a baseline of the EWM population via a point intercept (PI) survey in 2021. In 2022 a targeted aquatic herbicide application to areas of HWM using ProcellaCOR EC. This application will be in conjunction with herbicide residual & water quality monitoring with protocols approved by the DNR. Whole Lake PI surveys will be completed in 2021-2024. Annual updates will culminate into a comprehensive project summary report in 2024.
Specific project conditions: The project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist. It is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report.
Grant Details
Aquatic Invasives Control
Date
3/15/2022
Waters Involved
Gilbert Lake
Status
Complete
Gilbert Lake Advancment Association Inc: Gilbert Lake 2022-2023 Ewm Monitoring & Management Project: The Gilbert Lake Advancement Association is sponsoring a project to monitor and manage Eurasian Water Milfoil (EWM) via DASH and hand harvesting within Gilbert Lake.
Project final deliverables include: all data collected, agendas and minutes for planning meetings, and an APM plan update, specifically an EWM management strategy, that includes methodologies, results, and management alternatives discussion with an implementation plan.
Specific project activities include: 1) Plan, implement, and monitor 20 days of hand harvesting (10 in 2022, 10 in 2023); 2) Conduct a point intercept survey in 2023; 3) Conduct a strategic planning teleconference; 4) annual project reports; 5) Aquatic plant management plant update.
Special Conditions: DASH harvesting of EWM requires a permit from the DNR.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
The Grantee shall provide the DNR Lake Coordinator with a draft final report for comment on adequacy prior to making final payment to the consultant. DNR is to receive an electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Aquatic Invasives Control
Date
4/1/2006
Waters Involved
Lake Morris
Status
Complete
Mt. Morris Lakes Management District: Mt. Morris Lk Ais Control & Prevention Project: The Mount Morris Lake Management District proposes to control curly-leaf pondweed (CLP) and Eurasian water-milfoil (EWM) through chemical treatment, mechanical and hand removal, and preventative measures in Mount Morris Lake during the period 2006 - 2011. The project elements and deliverables are specified in Mount Morris Lake Management District's Aquatic Invasive Species Grant application, dated January 22, 2006. The project includes monitoring the extent and density of CLP and EWM annually through pre-treatment and post-treatment surveys of known infested areas, and monitoring other lake areas for the presence of aquatic invasive species (AIS); treating CLP infested areas with an aquatic herbicide; conducting hand-removal of CLP and EWM by divers; mechanically harvesting CLP; conducting water quality monitoring; conducting an aquatic plant survey using the point-intercept method and updating the Mount Morris Lake Aquatic Plant Management Plan; and conducting volunteer activities to prevent further AIS infestations, including conducting watercraft inspections. Reimbursement for mechanical harvesting is limited to only CLP infested areas for the purpose of minimizing turion production; harvesting for purposes of nuisance relief or navigation lanes will not be reimbursed. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database. Annual progress reports and a final report summarizing the five-year project will be provided to DNR.
If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.
Grant Details
Aquatic Invasives Control
Date
10/1/2012
Waters Involved
Lake Morris
Status
Complete
Mt. Morris Lakes Management District: Mt. Morris Ais Control/Prevention: The Mount Morris Lakes Management District is sponsoring a four-year AIS control and prevention project with goals to initiate/continue herbicide application strategies to control both CLP and EWM and to initiate CBCW watercraft inspection efforts.
Project activities include: Annual chemical treatments of CLP and residual monitoring; Annual chemical treatments of EWM and residual monitoring; Annual Pre and Post treatment monitoring and analysis; PI surveys and aquatic plant community mapping; Early season AIS survey; Summer EWM peak-biomass mapping survey; Update the current Mount Morris Lake Aquatic Plant Management Plan; Develop annual project report and a final report. Stakeholder participation: Volunteer herbicide concentration monitoring, CBCW training and inspections, Annual volunteer AIS monitoring, planning committee meeting.
Project deliverables include: annual progress and final reports of monitoring and management activities, including aquatic plant survey spreadsheets and pre/post treatment monitoring, any educational materials developed, and an updated Aquatic Plant Management Plan.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional lake coordinator.
Final report needs Department review and approval.
Grant Details
Aquatic Invasives Control
Date
3/15/2023
Waters Involved
Pine Lake
Status
Complete
Pine Lake Property Owners Assn: Pine Lake - Targeted Ewm Control Project: The Pine Lake Property Owners Association is sponsoring an ACEI grant on Pine Lake in the Town of Springwater to be completed in 2023 and possibly 2024. The project will focus on controlling EWM.
Project final deliverables include: 1) Provide all spatial data prior to implementation 2) Point Intercept and EWM Mapping Surveys 3) Annual AIS monitoring and control strategy reports 4) Herbicide concentration results 5) Final report including data, AIS mgmt. and future mgmt.
Specific project activities include: 1) ProcellaCOR herbicide treatment on Pine Lake in 2023 (2024 if needed) 2) Conduct Pre and Post sub-PI surveys to monitor changes to the plant community in herbicide treatment areas 3) Conduct whole lake PI to assess any large-scale impacts to plant community 4) Monitor herbicide concentration levels in lake post treatment 5) Create annual report with results and recommendations for future management.
Special Conditions: If consultant is to provide final report, the Grantee shall provide the DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Grant Details
Aquatic Invasives Control
Date
4/15/2016
Waters Involved
Silver Lake
Status
Complete
Silver Lake Management District: Silver Lake Hwm Control & Prevention: The Silver Lake Mgmt District is sponsoring an AIS control grant on Silver Lake, Waushara County. The goals of the project - control H-EWM populations on a lake-wide basis & enhance the likelihood of long-term control.
Project activities include: Plan a whole-lake pelletized fluridone herbicide, conduct whole-lake herbicide treatment, conduct herbicide concentration monitoring, conduct native plant and HWM population monitoring, conduct (SAV) bio-volume monitoring, update Invasive Species Management Plan, conduct (CBCW) & increase resident volunteer monitoring activities.
Project deliverables include: Submit annual - monitoring & control strategy assessment reports which include results of treatments & recommendations for future mgmt; annual summary of CBCW activities, Submit final report, to District Lake Coordinator, which details & compares all results, makes future mgmt. recommendations and summarizes stakeholder involvement activities.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein.
Grant Details
Aquatic Invasives Control
Date
3/15/2022
Waters Involved
Silver Lake
Status
Complete
Silver Lake Management District: 2022-2023 Hwm Integrated Pest Management Program: The Silver Lake Management District is sponsoring a grant to implement a Hybrid Water Milfoil Integrated Pest Management Program for Silver Lake in Waushara County.
Project final deliverables include: All data collected, agendas and minutes for planning meetings, and a final report that includes methodologies, results, and a management alternatives discussion with recommendations for future management.
Specific project activities include: 1) HWM plant surveys and mapping; 2) HWM hand harvesting and DASH control; 3) Assessment of HWM control strategy based on pre-determined success criteria: 4) Conduct annual point intercept surveys to compare and contrast aquatic plant populations; 5) Create annual project reports; 6) Inform and educate lake stakeholders about project results.
Special Conditions: All DASH activities require a department permit prior to initiating control efforts.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist. It is recommended that Grantee provide DNR Lake Coordinator with a draft of annual / final reports for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Control
Date
3/15/2024
Waters Involved
Silver Lake
Status
Complete
Silver Lake Management District: Big Silver Lake 2024-2025 Hwm Monitoring & Management Project: The Silver Lake Management District is sponsoring a project to conduct a whole-lake ProcellaCOR treatment in 2024 combined with follow-up hand-harvesting and detailed monitoring.
Activities: 1) Pretreatment mapping survey 2) Conduct whole lake (epilimnetic) ProcellaCOR treatment with target rate of 1.0 ppb 3) Conduct herbicide concentration monitoring during treatment 4) Conduct post treatment mapping survey 5) Conduct hand-harvest/DASH follow-up 6) create annual project reports.
Deliverables: 1) Pretreatment survey email-style report with maps 2) Control assessment report with laboratory results 3) Post treatment survey email-style report with maps 4) annual harvesting/DASH reports 5) final report.
Conditions: 1) All monitoring shall follow DNR protocols. 2) Point intercept surveys shall follow Recommended Baseline Monitoring of Aquatic Plants in Wisconsin: Sampling Design, Field and Laboratory Procedures, Data Entry and Analysis, and Applications, publication number PUB-SS-1068 2010. Submit electronic point intercept data to DNRBaselineAquaticPlants@wisconsin.gov
This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.
If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.
Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2008
Waters Involved
Deer Lake
Status
Complete
Deer Lake District: Deer Lake District Ewm Control Project: The Deer Lake District proposes to control Eurasian water-milfoil (EWM) in Deer Lake by implementing control measures during the period 2008 - 2011. The project elements and deliverables are specified in the Deer Lake District's Aquatic Invasive Species Control Grant application, dated November 23, 2008. The project includes conducting pre- and post-treatment surveys and mapping the extent of EWM; controlling EWM with aquatic herbicide treatments; and implementing an aquatic invasive species prevention strategy that includes developing an awareness & education program, and conducting watercraft inspection. Annual progress reports and a final report summarizing the four-year project will be provided to DNR. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database.
If consultant is to provide the final report, it is recommended that the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR will be provided both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request. Any publications produced as part of the project will incorporate the "Stop Aquatic Hitchhikers!"\FFFD brand.
Grant Details
Aquatic Invasives Early Detection and Response
Date
5/11/2020
Waters Involved
Hills Lake
Status
Complete
Golden Sands Rc&D: Edr For Japanes Knotweed In The Tomorrow River Watershed:
Golden Sands RC&D is sponsoring an Aquatic Invasive Species Early Detection and Rapid Response grant for the monitoring, and control of Japanese Knotweed in the Tomorrow River Watershed.
Project activities: Project activities include: 1) Survey each site of JKW prior to treatment; 2) Control JKW in Tomorrow River Watershed and complete additional follow-up monitoring post-treatment; 3) Train landowners on identification of JKW and how to control ; 4) Additional Outreach to the public regarding JKW education and training
Project deliverables include: Project deliverables include: 1) Japanese Knotweed survey data and maps; 2) Annual reports and final report describing the findings of the Japanese Knotweed surveys and summary of control efforts in the watershed; 3) All data will be collected following Department approved protocols and entered into DNR\2019s SWIMS database.
Specific project conditions: Specific conditions for this project: Annual reports and final report need Department review and approval. WDNR AIS Coordinator will be provided with an electronic (pdf or word) copy of reports, all maps, and all invasive plants and any GIS data.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator and Lake\2019s Biologist.
Grant Details
Aquatic Invasives Early Detection and Response
Date
4/1/2013
Waters Involved
Porters Lake
Status
Complete
Porters Lake Management District: Porter'S Lake Ewm Rapid Response: Porters Lake Management District is sponsoring a Rapid Response Grant to manage a new infestation of Eurasian water milfoil in Porters Lake, Waushara County. Major components of this work include:
1. Chain-wide assessment of EWM while plant is at peak biomass
2. Creation of treatment strategy for the following year building on successes and failures documented from previous treatments
3. Verification and refinement of herbicide treatment plan immediately before treatments are implemented
4. Completion of herbicide treatments and hand removal efforts
5. Assessment of control program
Project Deliverables
1. Annual spring pretreatment conformation and refinement survey
2. Annual treatment report
a. Maps detailing survey findings
b. Guidance for the following springs control strategy targeting EWM
3. Stakeholder Participation
a. Volunteer efforts and AIS surveillance monitoring entered into SWIMS
b. Project status/informational meeting
Project Timeline
1. Project will be completed by 06/30/2016
Grant Details
Aquatic Invasives Early Detection and Response
Date
4/10/2008
Waters Involved
Wilson Lake
Status
Complete
Kusel, Wilson, & Round Lakes P & R District: Wilson Lake Treatment Of Re-Established Clp Project: The Kusel, Wilson and Round Lakes P&R District proposes to control Curly Leaf Pondweed (CLP) in Wilson Lake by implementing control measures during the period 2008. The project elements and deliverables are specified in their AIS grant application dated 3/28/2008. The project includes conducting pre- and post-treatment surveys and monitoring, and mapping the extent ot CLP; controlling CLP with aquatic herbicide treatments; implementing an AIS prevention strategy that includes developing an awareness & education program. A final report summarizing the 1-year project will be provided to DNR. If consultant is to provide the final report, it is recommended that the grantee provide the DNR AIS Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR will be provided both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.
Grant Details
Aquatic Invasives Education
Date
2/15/2020
Waters Involved
Emerald Lake
Status
Complete
Mt. Morris Lakes Management District: Mount Morris Drawdown Scoping Project: The Mount Morris Lake Management District is sponsoring an AEPP grant project to assess specific conditions on the lake relative to the potential efficacy of conducting a drawdown on the system.
Specific project activities include: 1) Gather water quality data; 2) Conduct plant surveys to document the populations / spatial distribution of both native and invasive species; 3) Collect advanced sonar data; 4) Conduct water quality sampling and assess results; 5) Conduct a sediment / consolidation study; 6) Hold two public informational meetings and 7) Complete a report of the findings of this project with management recommendations.
Project final deliverables include: 1) All data collected; 2) Agendas and minutes for planning meetings; 3) Educational materials and list of attendees; 4) Final report.
Specific conditions: 1) Coordinate the scheduling of public meetings with the DNR Lakes Coordinator such that at least two weeks advanced notice is given; 2) Data and reports shall be provided in an electronic format; 3) This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein; Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist. 4) It is recommended that Grantee provide DNR Lake Coordinator with a draft of the final report for comment on report adequacy prior to making final payment to the consultant. 5) Grantee shall submit electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Aquatic Invasives Education
Date
3/15/2022
Waters Involved
Emerald Lake
Status
Complete
Mt. Morris Lakes Management District: 2022-2023 Post Drawdown Monitoring: The Morris Lakes Management District is sponsoring a grant to monitor changes to various lake conditions relative to a winter drawdown of the Morris Lake system.
Project final deliverables include: All data collected, agendas and minutes for planning meetings, and a project report that includes methodologies, results, and a management ramifications / alternatives discussion in final report.
Specific project activities include: 1) In-lake water quality monitoring; 2) Conduct four different types of aquatic plant surveys; 3) Conduct bathymetric sonar mapping of lake bed 4) Compare / contrast pre and post bathymetric data for changes in lake depth and hydrologic volume; 4) Inform and educate lake stakeholders about results of drawdown.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft of final report for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Fox River
Status
Complete
Fox Wolf Watershed Alliance: Prev - Adopt A Launch - Fox Wolf Watershed Alliance: The FWWA is sponsoring a project to run their Adopt-a-Launch Program to engage community to take ownership of lakes by helping to monitor for AIS and improving boat launches with volunteer efforts.
Activities: 1) Recruit and coordinate volunteers to adopt and monitor boat launches in Brown, Calumet, Fond du Lac, Outagamie, and Winnebago Counties; 2) Prevent the spread of AIS in a containment and response strategy via volunteer monitoring at adopted launches; 3) Build partnerships with local boat launch owners for increased AIS prevention activities, such as introducing them to the CBCW
Deliverables: 1) Hold 3 volunteer trainings including AIS ID and monitoring; 2) Goal of 15 boat launches adopted, including associated signage placed; 3) Goal of 200 monitoring hours by Adopt-a-Launch volunteers; 4) 6 social media posts highlighting the program; 5) Final report detailing project results (launches adopted, monitoring results, any infographics produced, etc.) and lessons learned
Conditions:
1) DNR has determined that LMPN efforts will not be duplicated by this project.
2) 200 hours of CBCW is not required for this project due to past and ongoing CBCW work in the project area.
3) Volunteer monitoring shall follow WDNR-approved protocols.
4) Monitoring data collected will be entered into SWIMS database under the grant project number.
5) All outreach and education materials shall use DNR messaging; DNR Biologist may request review and approval of materials before dissemination.
6) DNR AIS Biologist will be promptly notified of any new detections of an AIS species.
7) Final Report needs DNR review/approval and will be provided in an electronic format.
This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.
Grant Details
Aquatic Invasives Education
Date
8/1/2004
Waters Involved
Gilbert Lake
Status
Complete
Town Of Springwater: Gilbert Lake Aquatic Plant Survey: The Town of Springwater proposes to address current and future management and status of EWM and to develop aquatic invasive species prevention strategy recommendations for Gilbert Lake, Waushara County, and the Gilbert Lake Advancement Association, Inc.
Objectives of the project include: 1) Determining locations and extent of Eurasian watermilfoil (EWM) in Gilbert Lake. 2) Preparation of an Annual Report/Gilbert Lake AIS Management Plan 2005-2009.
The report will include: A) The spring 2005 EWM survey map. B) Summary of past herbicide treatment results. C) Comparisons of aquatic plant survey data collected from 2000 through 2004. Species composition, percent frequency, and relative abundance will be analyzed for significant differences between surveys. D) Gilbert Lake's Self-Help Lake Monitoring Program data analysis for changes in water quality in response to EWM control. E) Recommendations for future EWM management and for aquatic invasive species prevention strategies for Gilbert Lake and the Gilbert Lake Advancement Association.
Copies of the EWM survey map will be provided to the WDNR and the Gilbert Lake Advancement Association prior to management implementation. Copies of the Gilbert lake AIS Management Plan 2005-2009 will be provided to Gilbert lake Advancement Association members and other supporting organizations. In addition to one hardcopy of the Gilbert Lake AIS Management Plan 2005-2009, all data gathered during the project and the Gilbert Lake AIS Management Plan 2005-2009 will be provided in an electronic format to the DNR. See October 4, 2004 Gilbert Lake Aquatic Invasive Species Grant Proposal for further details.
Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Hills Lake
Status
Complete
Big Hills Lake Management District: Big Hills Lake Aquatic Plant Management Planning: The Big Hills Lake Management District is sponsoring a project to updated aquatic plant management plan for Big Hills Lake. It would gather and analyze historical and current ecological data for comparisons, to identify threats, determine the goals and values of stakeholders, and present feasible management actions. The plan would include goals and actions aimed at restoring ecological lake functions, if necessary, protecting high value lake attributes, and increasing the lake group's capacity to implement the management plan.
Activities: 1) Conduct an assessment of water quality data 2) Collect and analyze a paleocore 3) Assess aquatic plant community 4) Conduct a district-wide survey 5) Meeting with district commissioners 6) Write an aquatic plant management plan.
Deliverables: 1) Copy of the meeting presentation 2) Aquatic plant management plan.
Conditions: 1) Provide DNR Biologist with draft version of the management plan for review. 2) All monitoring shall follow DNR protocols.
This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.
If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.
Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Lake Butte des Morts
Status
Complete
Fox Wolf Watershed Alliance: Prev - Adopt A Launch - Fox Wolf Watershed Alliance: The FWWA is sponsoring a project to run their Adopt-a-Launch Program to engage community to take ownership of lakes by helping to monitor for AIS and improving boat launches with volunteer efforts.
Activities: 1) Recruit and coordinate volunteers to adopt and monitor boat launches in Brown, Calumet, Fond du Lac, Outagamie, and Winnebago Counties; 2) Prevent the spread of AIS in a containment and response strategy via volunteer monitoring at adopted launches; 3) Build partnerships with local boat launch owners for increased AIS prevention activities, such as introducing them to the CBCW
Deliverables: 1) Hold 3 volunteer trainings including AIS ID and monitoring; 2) Goal of 15 boat launches adopted, including associated signage placed; 3) Goal of 200 monitoring hours by Adopt-a-Launch volunteers; 4) 6 social media posts highlighting the program; 5) Final report detailing project results (launches adopted, monitoring results, any infographics produced, etc.) and lessons learned
Conditions:
1) DNR has determined that LMPN efforts will not be duplicated by this project.
2) 200 hours of CBCW is not required for this project due to past and ongoing CBCW work in the project area.
3) Volunteer monitoring shall follow WDNR-approved protocols.
4) Monitoring data collected will be entered into SWIMS database under the grant project number.
5) All outreach and education materials shall use DNR messaging; DNR Biologist may request review and approval of materials before dissemination.
6) DNR AIS Biologist will be promptly notified of any new detections of an AIS species.
7) Final Report needs DNR review/approval and will be provided in an electronic format.
This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.
Grant Details
Aquatic Invasives Education
Date
2/15/2020
Waters Involved
Lake Morris
Status
Complete
Mt. Morris Lakes Management District: Mount Morris Drawdown Scoping Project: The Mount Morris Lake Management District is sponsoring an AEPP grant project to assess specific conditions on the lake relative to the potential efficacy of conducting a drawdown on the system.
Specific project activities include: 1) Gather water quality data; 2) Conduct plant surveys to document the populations / spatial distribution of both native and invasive species; 3) Collect advanced sonar data; 4) Conduct water quality sampling and assess results; 5) Conduct a sediment / consolidation study; 6) Hold two public informational meetings and 7) Complete a report of the findings of this project with management recommendations.
Project final deliverables include: 1) All data collected; 2) Agendas and minutes for planning meetings; 3) Educational materials and list of attendees; 4) Final report.
Specific conditions: 1) Coordinate the scheduling of public meetings with the DNR Lakes Coordinator such that at least two weeks advanced notice is given; 2) Data and reports shall be provided in an electronic format; 3) This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein; Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist. 4) It is recommended that Grantee provide DNR Lake Coordinator with a draft of the final report for comment on report adequacy prior to making final payment to the consultant. 5) Grantee shall submit electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Aquatic Invasives Education
Date
3/15/2022
Waters Involved
Lake Morris
Status
Complete
Mt. Morris Lakes Management District: 2022-2023 Post Drawdown Monitoring: The Morris Lakes Management District is sponsoring a grant to monitor changes to various lake conditions relative to a winter drawdown of the Morris Lake system.
Project final deliverables include: All data collected, agendas and minutes for planning meetings, and a project report that includes methodologies, results, and a management ramifications / alternatives discussion in final report.
Specific project activities include: 1) In-lake water quality monitoring; 2) Conduct four different types of aquatic plant surveys; 3) Conduct bathymetric sonar mapping of lake bed 4) Compare / contrast pre and post bathymetric data for changes in lake depth and hydrologic volume; 4) Inform and educate lake stakeholders about results of drawdown.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft of final report for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Lake Poygan
Status
Complete
Winnebago Lakes Council, Inc.: Winnebago Pool Lakes Ais Education & Outreach Project: The Winnebago Lakes Council proposes to develop a comprehensive plan for preventing the spread of aquatic invasive species (AIS) into and from the Winnebago Pool (Lakes Winnebago, Butte des Morts, Winneconne and Poygan) during the period 2008 - 2009. The project elements and deliverables are specified in Winnebago Lake Council's Aquatic Invasive Species Grant application, dated February 1, 2008. The project includes initiating the first phase of a two-phase strategic planning process to produce a Strategic Plan for AIS prevention in the Winnebago Pool Lakes; implementing the "Clean Boats, Clean Waters" and citizen-based monitoring programs, including hiring watercraft inspectors and training volunteers to conduct watercraft inspection and AIS monitoring; conducting scientific analyses of current AIS infestations and a risk assessment for potential invasive species; and conducting outreach activities at public events. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database. Annual progress reports and a final report summarizing the five-year project will be provided to DNR.
If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.
Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Lake Poygan
Status
In_Progress
Winnebago Lakes Council, Inc.: Winnebago Pool Lks Ais Strategic Planning Phase 2: The Winnebago Lakes Council proposes to implement the comprehensive plan designed in phase I for preventing the spread of aquatic invasive species (AIS) into and from the Winnebago Pool (Lakes Winnebago, Butte des Morts, Winneconne and Poygan) during the period 2009-2010. The project elements and deliverables are specified in the Winnebago Lake Council's Aquatic Invasive Species grant application, dated January 30, 2009. The project includes; finalizing the regional AIS plan; continuing the "Clean Boats, Clean Waters" inspection program, including hiring an intern watercraft inspector, an intern coordinator and a project coordinator; and hosting a two day educational workshop aimed at local policy makers and waterfront property owners. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database. Annual progress reports and a final report summarizing the two-year project will be provided to the DNR. If consultant is to provide the final report, it is recommended the grantee provide the DNR Aquatic invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.
Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Lake Winnebago
Status
Complete
Fox Wolf Watershed Alliance: Prev - Adopt A Launch - Fox Wolf Watershed Alliance: The FWWA is sponsoring a project to run their Adopt-a-Launch Program to engage community to take ownership of lakes by helping to monitor for AIS and improving boat launches with volunteer efforts.
Activities: 1) Recruit and coordinate volunteers to adopt and monitor boat launches in Brown, Calumet, Fond du Lac, Outagamie, and Winnebago Counties; 2) Prevent the spread of AIS in a containment and response strategy via volunteer monitoring at adopted launches; 3) Build partnerships with local boat launch owners for increased AIS prevention activities, such as introducing them to the CBCW
Deliverables: 1) Hold 3 volunteer trainings including AIS ID and monitoring; 2) Goal of 15 boat launches adopted, including associated signage placed; 3) Goal of 200 monitoring hours by Adopt-a-Launch volunteers; 4) 6 social media posts highlighting the program; 5) Final report detailing project results (launches adopted, monitoring results, any infographics produced, etc.) and lessons learned
Conditions:
1) DNR has determined that LMPN efforts will not be duplicated by this project.
2) 200 hours of CBCW is not required for this project due to past and ongoing CBCW work in the project area.
3) Volunteer monitoring shall follow WDNR-approved protocols.
4) Monitoring data collected will be entered into SWIMS database under the grant project number.
5) All outreach and education materials shall use DNR messaging; DNR Biologist may request review and approval of materials before dissemination.
6) DNR AIS Biologist will be promptly notified of any new detections of an AIS species.
7) Final Report needs DNR review/approval and will be provided in an electronic format.
This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.
Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Lake Winneconne
Status
Complete
Winnebago Lakes Council, Inc.: Winnebago Pool Lakes Ais Education & Outreach Project: The Winnebago Lakes Council proposes to develop a comprehensive plan for preventing the spread of aquatic invasive species (AIS) into and from the Winnebago Pool (Lakes Winnebago, Butte des Morts, Winneconne and Poygan) during the period 2008 - 2009. The project elements and deliverables are specified in Winnebago Lake Council's Aquatic Invasive Species Grant application, dated February 1, 2008. The project includes initiating the first phase of a two-phase strategic planning process to produce a Strategic Plan for AIS prevention in the Winnebago Pool Lakes; implementing the "Clean Boats, Clean Waters" and citizen-based monitoring programs, including hiring watercraft inspectors and training volunteers to conduct watercraft inspection and AIS monitoring; conducting scientific analyses of current AIS infestations and a risk assessment for potential invasive species; and conducting outreach activities at public events. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database. Annual progress reports and a final report summarizing the five-year project will be provided to DNR.
If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.
Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Lake Winneconne
Status
In_Progress
Winnebago Lakes Council, Inc.: Winnebago Pool Lks Ais Strategic Planning Phase 2: The Winnebago Lakes Council proposes to implement the comprehensive plan designed in phase I for preventing the spread of aquatic invasive species (AIS) into and from the Winnebago Pool (Lakes Winnebago, Butte des Morts, Winneconne and Poygan) during the period 2009-2010. The project elements and deliverables are specified in the Winnebago Lake Council's Aquatic Invasive Species grant application, dated January 30, 2009. The project includes; finalizing the regional AIS plan; continuing the "Clean Boats, Clean Waters" inspection program, including hiring an intern watercraft inspector, an intern coordinator and a project coordinator; and hosting a two day educational workshop aimed at local policy makers and waterfront property owners. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database. Annual progress reports and a final report summarizing the two-year project will be provided to the DNR. If consultant is to provide the final report, it is recommended the grantee provide the DNR Aquatic invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.
Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Lake Winneconne
Status
Complete
Fox Wolf Watershed Alliance: Prev - Adopt A Launch - Fox Wolf Watershed Alliance: The FWWA is sponsoring a project to run their Adopt-a-Launch Program to engage community to take ownership of lakes by helping to monitor for AIS and improving boat launches with volunteer efforts.
Activities: 1) Recruit and coordinate volunteers to adopt and monitor boat launches in Brown, Calumet, Fond du Lac, Outagamie, and Winnebago Counties; 2) Prevent the spread of AIS in a containment and response strategy via volunteer monitoring at adopted launches; 3) Build partnerships with local boat launch owners for increased AIS prevention activities, such as introducing them to the CBCW
Deliverables: 1) Hold 3 volunteer trainings including AIS ID and monitoring; 2) Goal of 15 boat launches adopted, including associated signage placed; 3) Goal of 200 monitoring hours by Adopt-a-Launch volunteers; 4) 6 social media posts highlighting the program; 5) Final report detailing project results (launches adopted, monitoring results, any infographics produced, etc.) and lessons learned
Conditions:
1) DNR has determined that LMPN efforts will not be duplicated by this project.
2) 200 hours of CBCW is not required for this project due to past and ongoing CBCW work in the project area.
3) Volunteer monitoring shall follow WDNR-approved protocols.
4) Monitoring data collected will be entered into SWIMS database under the grant project number.
5) All outreach and education materials shall use DNR messaging; DNR Biologist may request review and approval of materials before dissemination.
6) DNR AIS Biologist will be promptly notified of any new detections of an AIS species.
7) Final Report needs DNR review/approval and will be provided in an electronic format.
This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.
Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Little Lake Butte Des Morts
Status
Complete
Fox Wolf Watershed Alliance: Prev - Adopt A Launch - Fox Wolf Watershed Alliance: The FWWA is sponsoring a project to run their Adopt-a-Launch Program to engage community to take ownership of lakes by helping to monitor for AIS and improving boat launches with volunteer efforts.
Activities: 1) Recruit and coordinate volunteers to adopt and monitor boat launches in Brown, Calumet, Fond du Lac, Outagamie, and Winnebago Counties; 2) Prevent the spread of AIS in a containment and response strategy via volunteer monitoring at adopted launches; 3) Build partnerships with local boat launch owners for increased AIS prevention activities, such as introducing them to the CBCW
Deliverables: 1) Hold 3 volunteer trainings including AIS ID and monitoring; 2) Goal of 15 boat launches adopted, including associated signage placed; 3) Goal of 200 monitoring hours by Adopt-a-Launch volunteers; 4) 6 social media posts highlighting the program; 5) Final report detailing project results (launches adopted, monitoring results, any infographics produced, etc.) and lessons learned
Conditions:
1) DNR has determined that LMPN efforts will not be duplicated by this project.
2) 200 hours of CBCW is not required for this project due to past and ongoing CBCW work in the project area.
3) Volunteer monitoring shall follow WDNR-approved protocols.
4) Monitoring data collected will be entered into SWIMS database under the grant project number.
5) All outreach and education materials shall use DNR messaging; DNR Biologist may request review and approval of materials before dissemination.
6) DNR AIS Biologist will be promptly notified of any new detections of an AIS species.
7) Final Report needs DNR review/approval and will be provided in an electronic format.
This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Long Lake
Status
Complete
Town Of Saxeville: Long Lake Clean Boats/Clean Waters Project: The Town of Saxeville, on behalf of the Long Lake Association, proposes to conduct aquatic invasives species education and prevention activities in 2007. The project elements and deliverables are specified in the Town of Saxeville Aquatic Invasive Species Control Grant application, dated January 25, 2007. The project includes designing and installing a sign at the Long Lake boat landing; designing and obtaining keychains for distribution to boaters; and implementing the "Clean Boats, Clean Waters" watercraft inspection program. The sign and keychains will incorporate the "Stop Aquatic Hitchhikers!"brand (partnership details are at http://www.protectyourwaters.org). Sign and keychain designs created for this project will be submitted to DNR for approval prior to construction/printing, and copies of the designs will be provided to DNR as part of the project's deliverables. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database. A final report summarizing the project will be provided to DNR. If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.
Grant Details
Aquatic Invasives Education
Date
4/1/2004
Waters Involved
Pearl Lake
Status
Complete
Pearl Lake Protection & Rehabilitation Dist: Pearl Lake Aquatic Invasive Species Study: The Pearl Lake District proposes to contact a project focused on aquatic plant management, to include:
1. Conduct a submergent aquatic plant appraisal via line transect methods and map existing stands of EWM, curly leaf pondweed, and purple loosestrife
2. Conduct a emergent plant appraisal via line transect -transect methodology
3. Summarization of available lake data, especially self-help volunteer information
4. Conduct an evaluation of habitat relative to fishery, existing data (abundance, age, length, weight), fish stocking with cooperative consultation from DNR fish program staff.
5. Prepare a final report and make recommendations.
6. Specific actions are identified within the original planning grant proposal.
Grant Details
Aquatic Invasives Education
Date
10/1/2011
Waters Involved
Porters Lake
Status
Complete
Porters Lake Management District: Porter'S Lake Monitoring & Prev.: Porters Lake Management District proposes to conduct education, prevention and planning activities to control and prevent the spread of aquatic invasive species (AIS) into Porters Lake during the period of 2011-2013. The project elements and deliverables are specified in Porters Lake Aquatic Invasive Species Grant application, dated 7/24/11.
The project incluldes the following: monitoring, education, shoreline restoration and boat landing modifications. The Porters Lake group will participate in the Fourth of July Landing Blitz, install new State AIS signs, provide garbage cans and a boat wash at their landing. Monitoring will be conducted by SCUBA surveys and by trained lakes people. 200 hours of CBCW will be conducted per year. Watercraft inspection and Citizen Lake Monitoring records will be entered into the State's online Watercraft Inspection Database (SWIMS). Porters Lake group will continue their biocontrol efforts to control purple loostrife around the lake and start working on shoreline restoration as outlined in their deliverables. This grant project will also develop an updated lake management plan.
Any publications or signs produced as part of this project will incorporate the "Stop Aquatic Hitchhikers" brand. Annual progress reports and a final report summarizing the two-year project will be provided to DNR. If a consultant is to provide the final report, is is recommended the Grantee provide the DNR AIS Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic.pdf copies of the final report along with, or prior to, submission of grantee's final payment request.
Grant Details
Aquatic Invasives Education
Date
3/15/2023
Waters Involved
Twin Lake
Status
Complete
Twin Lakes Property Owners Association: Twin Lake Apm Plan: The Twin Lake Association is sponsoring a project to update their Aquatic Plant Management (APM) Plan.
Project final deliverables include: all data collected, agendas and minutes for planning meetings, and an APM plan that includes methodologies, results, and management alternatives discussion with an implementation plan.
Specific project activities include: 1) Aquatic plant monitoring surveys; 2) New species voucher samples; 3) Bathymetry; 4) DNR approved stakeholder survey; 5) Planning meetings; 6) Final Aquatic Plant Management Plan
Special Conditions: If consultant is to provide final report, the Grantee shall provide the DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Grant Details
Aquatic Invasives Education
Date
4/1/2004
Waters Involved
Wilson Lake
Status
Complete
Kusel, Wilson, & Round Lakes P & R District: Wilson Lake Aquatic Invasive Species Study: The Kusel-Wilson-Round Protection & Rehab District proposes to conduct an aquatic plant survey on Wilson Lake, to include:
1. Conduct a submergent aquatic plant appraisal via line transect methods and map existing stands of EWM, curly leaf pondweed, and purple loosestrife
2. Conduct lake profiling, clarity, pH, Chla and T Phosphorous monitoring in April 04
3. Prepare a final report and make recommendations.
4. Specific actions are identified within the original planning grant proposal
Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Wolf River
Status
Complete
Fox Wolf Watershed Alliance: Prev - Adopt A Launch - Fox Wolf Watershed Alliance: The FWWA is sponsoring a project to run their Adopt-a-Launch Program to engage community to take ownership of lakes by helping to monitor for AIS and improving boat launches with volunteer efforts.
Activities: 1) Recruit and coordinate volunteers to adopt and monitor boat launches in Brown, Calumet, Fond du Lac, Outagamie, and Winnebago Counties; 2) Prevent the spread of AIS in a containment and response strategy via volunteer monitoring at adopted launches; 3) Build partnerships with local boat launch owners for increased AIS prevention activities, such as introducing them to the CBCW
Deliverables: 1) Hold 3 volunteer trainings including AIS ID and monitoring; 2) Goal of 15 boat launches adopted, including associated signage placed; 3) Goal of 200 monitoring hours by Adopt-a-Launch volunteers; 4) 6 social media posts highlighting the program; 5) Final report detailing project results (launches adopted, monitoring results, any infographics produced, etc.) and lessons learned
Conditions:
1) DNR has determined that LMPN efforts will not be duplicated by this project.
2) 200 hours of CBCW is not required for this project due to past and ongoing CBCW work in the project area.
3) Volunteer monitoring shall follow WDNR-approved protocols.
4) Monitoring data collected will be entered into SWIMS database under the grant project number.
5) All outreach and education materials shall use DNR messaging; DNR Biologist may request review and approval of materials before dissemination.
6) DNR AIS Biologist will be promptly notified of any new detections of an AIS species.
7) Final Report needs DNR review/approval and will be provided in an electronic format.
This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.
Grant Details
Aquatic Invasives Research Grant
Date
4/1/2011
Waters Involved
Norwegian Lake
Status
Complete
Golden Sands Rc&D: Weevil Rearing Statewide: Golden Sands RC&D proposes to fund a study as to the efficacy of helping lake groups raise weevils for the purpose of controling Eurasian Watermilfoil on inland lakes throughout the state. Major project elements to include: a) equipment and staff time associated with mass rearing of weevils, b) administration, c) weevil release, d) final report.
Grant Details
Aquatic Invasives Research Grant
Date
4/1/2011
Waters Involved
Unnamed
Status
Complete
Golden Sands Rc&D: Weevil Rearing Statewide: Golden Sands RC&D proposes to fund a study as to the efficacy of helping lake groups raise weevils for the purpose of controling Eurasian Watermilfoil on inland lakes throughout the state. Major project elements to include: a) equipment and staff time associated with mass rearing of weevils, b) administration, c) weevil release, d) final report.
Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Hills Lake
Status
Complete
Golden Sands Rc&D: Big Hill Lake 2014 Clean Boats Clean Waters Project: The Golden Sands RC&D is sponsoring a Clean Boats Clean Waters project on Big Hills Lake. The project includes a CBCW program at one public landing in 2014.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Hills Lake
Status
Complete
Big Hills Lake Management District: Big Hills Lake Management District 2019 Cbcw: Big Hills Lake Management District is sponsoring a Clean Boats Clean Waters project in 2019 at 1 single public boat landings and 0 public boat landing pairs on BIG HILLS LAKE (BIG HILLS LAKE, N/A).
Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Pearl Lake
Status
Complete
Golden Sands Rc&D: Golden Sands Rc&D Pearl Lake 2015 Clean Boats Clean Waters Project: The Golden Sands RC&D Council is sponsoring a 2015 Clean Boats Clean Waters project on Pearl Lake and includes one public landing.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Pearl Lake
Status
Complete
Golden Sands Rc&D: Golden Sands Rc&D (Pearl Lk): The Golden Sands RC&D Council, Inc. is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Pearl Lake.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Pearl Lake
Status
Complete
Pearl Lake Protection & Rehabilitation Dist: Pearl Lake Protection & Rehabilitation Dist 2017 Cbcw: Pearl Lake Protection & Rehabilitation Dist is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on PEARL LAKE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2018
Waters Involved
Pearl Lake
Status
Complete
Pearl Lake Protection & Rehabilitation Dist: Pearl Lake Protection & Rehabilitation Dist 2018 Cbcw: Pearl Lake Protection & Rehabilitation Dist is sponsoring a Clean Boats Clean Waters project in 2018 at 1 single public boat landings and 0 public boat landing pairs on PEARL LAKE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Pearl Lake
Status
Complete
Pearl Lake Protection & Rehabilitation Dist: Pearl Lake Protection & Rehabilitation Dist 2019 Cbcw: Ppearl Lake Protection & Rehabilitation Dist is sponsoring a Clean Boats Clean Waters project in 2019 at 1 single public boat landings and 0 public boat landing pairs on PEARL LAKE (PEARL LAKE LANDING).
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Pearl Lake
Status
Complete
Pearl Lake Protection & Rehabilitation Dist: Pearl Lake Protection & Rehabilitation Dist 2020 Cbcw: Pearl Lake Protection & Rehabilitation Dist is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 0 public boat landing pairs on PEARL LAKE (PEARL LAKE LANDING).
Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Silver Lake
Status
Complete
Golden Sands Rc&D: Golden Sands Rc&D (Big) Silver Lk 2015 Clean Boats Clean Waters Project: The Golden Sands RC& D Council is sponsoring a 2015 Clean Boats Clean Waters Project on (Big) Silver Lake including one public landing.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Silver Lake
Status
Complete
Silver Lake Management District: Silver Lake Management District 2016 Clean Boats Clean Water: The Silver Lake Management District is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Silver Lake.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Silver Lake
Status
Complete
Silver Lake Management District: Silver Lake Management District 2017 Cbcw: Silver Lake Management District is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on SILVER LAKE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2018
Waters Involved
Silver Lake
Status
Complete
Silver Lake Management District: Silver Lake Management District 2018 Cbcw: Silver Lake Management District is sponsoring a Clean Boats Clean Waters project in 2018 at 1 single public boat landings and 0 public boat landing pairs on SILVER LAKE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Silver Lake
Status
Complete
Silver Lake Management District: Silver Lake Management District 2019 Cbcw: Silver Lake Management District is sponsoring a Clean Boats Clean Waters project in 2019 at 1 single public boat landings and 0 public boat landing pairs on SILVER LAKE (WEST LANDING, N/A).
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Silver Lake
Status
Complete
Silver Lake Management District: Silver Lake Management District 2020 Cbcw: Silver Lake Management District is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 0 public boat landing pairs on SILVER LAKE (WEST LANDING, N/A).
Grant Details
Date
3/15/2021
Waters Involved
Beaver Dam Lake
Status
Complete
University Of Wisconsin-Madison: Determining Fate Of The Novel Herbicide Florpyrauxifen-Benzy: The Board Of Regents of the University of Wisconsin System is sponsoring a project to conduct an aquatic invasive species research study on the degradation of florpyrauxifen-benzyl [FPB] following herbicide treatments conducted for aquatic plant management in Wisconsin lakes. The project aims to determine the mechanisms responsible for FPB breakdown in lakes by: 1) quantifying both direct and indirect photolysis of FPB in lake water using lab experiments; 2) quantifying FPB degradation in water-only and water-sediment environments; 3) determining the primary degradation pathway of FPB following in field applications; and 4) quantifying FPB persistence and degradation products post treatment in lakes.
Project deliverables include: Data on the relative importance of both direct and indirect FPB photodegradation; data on microbial degradation of FPB in water and sediment matrices; data on the spatial distribution and persistence of FPB in water and sediment following aquatic plant control activities in lakes.
Special Conditions: Quarterly reports and a final report summarizing these findings will be submitted to WDNR. WDNR will meet with sponsor periodically during project to discuss progress on deliverables and overall project goals.
Grant Details
Date
3/15/2021
Waters Involved
Bughs Lake
Status
Complete
University Of Wisconsin-Madison: Determining Fate Of The Novel Herbicide Florpyrauxifen-Benzy: The Board Of Regents of the University of Wisconsin System is sponsoring a project to conduct an aquatic invasive species research study on the degradation of florpyrauxifen-benzyl [FPB] following herbicide treatments conducted for aquatic plant management in Wisconsin lakes. The project aims to determine the mechanisms responsible for FPB breakdown in lakes by: 1) quantifying both direct and indirect photolysis of FPB in lake water using lab experiments; 2) quantifying FPB degradation in water-only and water-sediment environments; 3) determining the primary degradation pathway of FPB following in field applications; and 4) quantifying FPB persistence and degradation products post treatment in lakes.
Project deliverables include: Data on the relative importance of both direct and indirect FPB photodegradation; data on microbial degradation of FPB in water and sediment matrices; data on the spatial distribution and persistence of FPB in water and sediment following aquatic plant control activities in lakes.
Special Conditions: Quarterly reports and a final report summarizing these findings will be submitted to WDNR. WDNR will meet with sponsor periodically during project to discuss progress on deliverables and overall project goals.
Grant Details
Date
3/15/2021
Waters Involved
Cedar Lake
Status
Complete
University Of Wisconsin-Madison: Determining Fate Of The Novel Herbicide Florpyrauxifen-Benzy: The Board Of Regents of the University of Wisconsin System is sponsoring a project to conduct an aquatic invasive species research study on the degradation of florpyrauxifen-benzyl [FPB] following herbicide treatments conducted for aquatic plant management in Wisconsin lakes. The project aims to determine the mechanisms responsible for FPB breakdown in lakes by: 1) quantifying both direct and indirect photolysis of FPB in lake water using lab experiments; 2) quantifying FPB degradation in water-only and water-sediment environments; 3) determining the primary degradation pathway of FPB following in field applications; and 4) quantifying FPB persistence and degradation products post treatment in lakes.
Project deliverables include: Data on the relative importance of both direct and indirect FPB photodegradation; data on microbial degradation of FPB in water and sediment matrices; data on the spatial distribution and persistence of FPB in water and sediment following aquatic plant control activities in lakes.
Special Conditions: Quarterly reports and a final report summarizing these findings will be submitted to WDNR. WDNR will meet with sponsor periodically during project to discuss progress on deliverables and overall project goals.
Grant Details
Date
3/15/2021
Waters Involved
Crescent Lake
Status
Complete
University Of Wisconsin-Madison: Determining Fate Of The Novel Herbicide Florpyrauxifen-Benzy: The Board Of Regents of the University of Wisconsin System is sponsoring a project to conduct an aquatic invasive species research study on the degradation of florpyrauxifen-benzyl [FPB] following herbicide treatments conducted for aquatic plant management in Wisconsin lakes. The project aims to determine the mechanisms responsible for FPB breakdown in lakes by: 1) quantifying both direct and indirect photolysis of FPB in lake water using lab experiments; 2) quantifying FPB degradation in water-only and water-sediment environments; 3) determining the primary degradation pathway of FPB following in field applications; and 4) quantifying FPB persistence and degradation products post treatment in lakes.
Project deliverables include: Data on the relative importance of both direct and indirect FPB photodegradation; data on microbial degradation of FPB in water and sediment matrices; data on the spatial distribution and persistence of FPB in water and sediment following aquatic plant control activities in lakes.
Special Conditions: Quarterly reports and a final report summarizing these findings will be submitted to WDNR. WDNR will meet with sponsor periodically during project to discuss progress on deliverables and overall project goals.
Grant Details
Date
3/15/2021
Waters Involved
Kawaguesaga Lake
Status
Complete
University Of Wisconsin-Madison: Determining Fate Of The Novel Herbicide Florpyrauxifen-Benzy: The Board Of Regents of the University of Wisconsin System is sponsoring a project to conduct an aquatic invasive species research study on the degradation of florpyrauxifen-benzyl [FPB] following herbicide treatments conducted for aquatic plant management in Wisconsin lakes. The project aims to determine the mechanisms responsible for FPB breakdown in lakes by: 1) quantifying both direct and indirect photolysis of FPB in lake water using lab experiments; 2) quantifying FPB degradation in water-only and water-sediment environments; 3) determining the primary degradation pathway of FPB following in field applications; and 4) quantifying FPB persistence and degradation products post treatment in lakes.
Project deliverables include: Data on the relative importance of both direct and indirect FPB photodegradation; data on microbial degradation of FPB in water and sediment matrices; data on the spatial distribution and persistence of FPB in water and sediment following aquatic plant control activities in lakes.
Special Conditions: Quarterly reports and a final report summarizing these findings will be submitted to WDNR. WDNR will meet with sponsor periodically during project to discuss progress on deliverables and overall project goals.
Grant Details
Date
3/15/2021
Waters Involved
Minocqua Lake
Status
Complete
University Of Wisconsin-Madison: Determining Fate Of The Novel Herbicide Florpyrauxifen-Benzy: The Board Of Regents of the University of Wisconsin System is sponsoring a project to conduct an aquatic invasive species research study on the degradation of florpyrauxifen-benzyl [FPB] following herbicide treatments conducted for aquatic plant management in Wisconsin lakes. The project aims to determine the mechanisms responsible for FPB breakdown in lakes by: 1) quantifying both direct and indirect photolysis of FPB in lake water using lab experiments; 2) quantifying FPB degradation in water-only and water-sediment environments; 3) determining the primary degradation pathway of FPB following in field applications; and 4) quantifying FPB persistence and degradation products post treatment in lakes.
Project deliverables include: Data on the relative importance of both direct and indirect FPB photodegradation; data on microbial degradation of FPB in water and sediment matrices; data on the spatial distribution and persistence of FPB in water and sediment following aquatic plant control activities in lakes.
Special Conditions: Quarterly reports and a final report summarizing these findings will be submitted to WDNR. WDNR will meet with sponsor periodically during project to discuss progress on deliverables and overall project goals.
Grant Details
Date
3/15/2021
Waters Involved
Tomahawk Lake
Status
Complete
University Of Wisconsin-Madison: Determining Fate Of The Novel Herbicide Florpyrauxifen-Benzy: The Board Of Regents of the University of Wisconsin System is sponsoring a project to conduct an aquatic invasive species research study on the degradation of florpyrauxifen-benzyl [FPB] following herbicide treatments conducted for aquatic plant management in Wisconsin lakes. The project aims to determine the mechanisms responsible for FPB breakdown in lakes by: 1) quantifying both direct and indirect photolysis of FPB in lake water using lab experiments; 2) quantifying FPB degradation in water-only and water-sediment environments; 3) determining the primary degradation pathway of FPB following in field applications; and 4) quantifying FPB persistence and degradation products post treatment in lakes.
Project deliverables include: Data on the relative importance of both direct and indirect FPB photodegradation; data on microbial degradation of FPB in water and sediment matrices; data on the spatial distribution and persistence of FPB in water and sediment following aquatic plant control activities in lakes.
Special Conditions: Quarterly reports and a final report summarizing these findings will be submitted to WDNR. WDNR will meet with sponsor periodically during project to discuss progress on deliverables and overall project goals.
Grant Details
Date
3/15/2021
Waters Involved
Twin Lakes (North)
Status
Complete
University Of Wisconsin-Madison: Determining Fate Of The Novel Herbicide Florpyrauxifen-Benzy: The Board Of Regents of the University of Wisconsin System is sponsoring a project to conduct an aquatic invasive species research study on the degradation of florpyrauxifen-benzyl [FPB] following herbicide treatments conducted for aquatic plant management in Wisconsin lakes. The project aims to determine the mechanisms responsible for FPB breakdown in lakes by: 1) quantifying both direct and indirect photolysis of FPB in lake water using lab experiments; 2) quantifying FPB degradation in water-only and water-sediment environments; 3) determining the primary degradation pathway of FPB following in field applications; and 4) quantifying FPB persistence and degradation products post treatment in lakes.
Project deliverables include: Data on the relative importance of both direct and indirect FPB photodegradation; data on microbial degradation of FPB in water and sediment matrices; data on the spatial distribution and persistence of FPB in water and sediment following aquatic plant control activities in lakes.
Special Conditions: Quarterly reports and a final report summarizing these findings will be submitted to WDNR. WDNR will meet with sponsor periodically during project to discuss progress on deliverables and overall project goals.
Grant Details
Date
3/15/2021
Waters Involved
Twin River
Status
Complete
University Of Wisconsin-Madison: Determining Fate Of The Novel Herbicide Florpyrauxifen-Benzy: The Board Of Regents of the University of Wisconsin System is sponsoring a project to conduct an aquatic invasive species research study on the degradation of florpyrauxifen-benzyl [FPB] following herbicide treatments conducted for aquatic plant management in Wisconsin lakes. The project aims to determine the mechanisms responsible for FPB breakdown in lakes by: 1) quantifying both direct and indirect photolysis of FPB in lake water using lab experiments; 2) quantifying FPB degradation in water-only and water-sediment environments; 3) determining the primary degradation pathway of FPB following in field applications; and 4) quantifying FPB persistence and degradation products post treatment in lakes.
Project deliverables include: Data on the relative importance of both direct and indirect FPB photodegradation; data on microbial degradation of FPB in water and sediment matrices; data on the spatial distribution and persistence of FPB in water and sediment following aquatic plant control activities in lakes.
Special Conditions: Quarterly reports and a final report summarizing these findings will be submitted to WDNR. WDNR will meet with sponsor periodically during project to discuss progress on deliverables and overall project goals.
Grant Details
Date
3/15/2021
Waters Involved
Unnamed
Status
Complete
University Of Wisconsin-Madison: Determining Fate Of The Novel Herbicide Florpyrauxifen-Benzy: The Board Of Regents of the University of Wisconsin System is sponsoring a project to conduct an aquatic invasive species research study on the degradation of florpyrauxifen-benzyl [FPB] following herbicide treatments conducted for aquatic plant management in Wisconsin lakes. The project aims to determine the mechanisms responsible for FPB breakdown in lakes by: 1) quantifying both direct and indirect photolysis of FPB in lake water using lab experiments; 2) quantifying FPB degradation in water-only and water-sediment environments; 3) determining the primary degradation pathway of FPB following in field applications; and 4) quantifying FPB persistence and degradation products post treatment in lakes.
Project deliverables include: Data on the relative importance of both direct and indirect FPB photodegradation; data on microbial degradation of FPB in water and sediment matrices; data on the spatial distribution and persistence of FPB in water and sediment following aquatic plant control activities in lakes.
Special Conditions: Quarterly reports and a final report summarizing these findings will be submitted to WDNR. WDNR will meet with sponsor periodically during project to discuss progress on deliverables and overall project goals.
Grant Details
Date
3/15/2021
Waters Involved
Whitewater Creek
Status
Complete
University Of Wisconsin-Madison: Determining Fate Of The Novel Herbicide Florpyrauxifen-Benzy: The Board Of Regents of the University of Wisconsin System is sponsoring a project to conduct an aquatic invasive species research study on the degradation of florpyrauxifen-benzyl [FPB] following herbicide treatments conducted for aquatic plant management in Wisconsin lakes. The project aims to determine the mechanisms responsible for FPB breakdown in lakes by: 1) quantifying both direct and indirect photolysis of FPB in lake water using lab experiments; 2) quantifying FPB degradation in water-only and water-sediment environments; 3) determining the primary degradation pathway of FPB following in field applications; and 4) quantifying FPB persistence and degradation products post treatment in lakes.
Project deliverables include: Data on the relative importance of both direct and indirect FPB photodegradation; data on microbial degradation of FPB in water and sediment matrices; data on the spatial distribution and persistence of FPB in water and sediment following aquatic plant control activities in lakes.
Special Conditions: Quarterly reports and a final report summarizing these findings will be submitted to WDNR. WDNR will meet with sponsor periodically during project to discuss progress on deliverables and overall project goals.
Grant Details
Date
3/15/2021
Waters Involved
Whitewater Lake
Status
Complete
University Of Wisconsin-Madison: Determining Fate Of The Novel Herbicide Florpyrauxifen-Benzy: The Board Of Regents of the University of Wisconsin System is sponsoring a project to conduct an aquatic invasive species research study on the degradation of florpyrauxifen-benzyl [FPB] following herbicide treatments conducted for aquatic plant management in Wisconsin lakes. The project aims to determine the mechanisms responsible for FPB breakdown in lakes by: 1) quantifying both direct and indirect photolysis of FPB in lake water using lab experiments; 2) quantifying FPB degradation in water-only and water-sediment environments; 3) determining the primary degradation pathway of FPB following in field applications; and 4) quantifying FPB persistence and degradation products post treatment in lakes.
Project deliverables include: Data on the relative importance of both direct and indirect FPB photodegradation; data on microbial degradation of FPB in water and sediment matrices; data on the spatial distribution and persistence of FPB in water and sediment following aquatic plant control activities in lakes.
Special Conditions: Quarterly reports and a final report summarizing these findings will be submitted to WDNR. WDNR will meet with sponsor periodically during project to discuss progress on deliverables and overall project goals.
Grant Details
Lake Protection Grant
Date
7/1/2011
Waters Involved
Alpine Lake
Status
Complete
Waushara County: Lco-Waushara County Lakes Study And Plan (Group A Lakes): Phase Two of this Lake Planning study will involve up to seventeen Waushara County lakes (Group A) : Alpine Lake, Beans Lake, Bughs Lake, Curtis Lake, Deer Lake, Fish Lake, Little Hills Lake, Irogami Lake, Lake Huron, Long Lake, Marl Lake, Pine Lake, Pleasant Lake, Silver Lake, West Branch Mill P.(White River), White River Fl (Lower Pond), Witters Lake. The goals are to characterize the existing aquatic plant communities, characterize existing water quality, develop tools for relating lake water quality to land use, predict sensitivity of water and habitat quality to future changes in land use, identify critical landscape features, provide a practical summary of these results for use by citizens and county staff, and characterize and map levels of shoreline development and determine any relationships between development and wildlife communities.
Grant Details
Lake Protection Grant
Date
7/1/2011
Waters Involved
Beans Lake
Status
Complete
Waushara County: Lco-Waushara County Lakes Study And Plan (Group A Lakes): Phase Two of this Lake Planning study will involve up to seventeen Waushara County lakes (Group A) : Alpine Lake, Beans Lake, Bughs Lake, Curtis Lake, Deer Lake, Fish Lake, Little Hills Lake, Irogami Lake, Lake Huron, Long Lake, Marl Lake, Pine Lake, Pleasant Lake, Silver Lake, West Branch Mill P.(White River), White River Fl (Lower Pond), Witters Lake. The goals are to characterize the existing aquatic plant communities, characterize existing water quality, develop tools for relating lake water quality to land use, predict sensitivity of water and habitat quality to future changes in land use, identify critical landscape features, provide a practical summary of these results for use by citizens and county staff, and characterize and map levels of shoreline development and determine any relationships between development and wildlife communities.
Grant Details
Lake Protection Grant
Date
7/1/2011
Waters Involved
Bughs Lake
Status
Complete
Waushara County: Lco-Waushara County Lakes Study And Plan (Group A Lakes): Phase Two of this Lake Planning study will involve up to seventeen Waushara County lakes (Group A) : Alpine Lake, Beans Lake, Bughs Lake, Curtis Lake, Deer Lake, Fish Lake, Little Hills Lake, Irogami Lake, Lake Huron, Long Lake, Marl Lake, Pine Lake, Pleasant Lake, Silver Lake, West Branch Mill P.(White River), White River Fl (Lower Pond), Witters Lake. The goals are to characterize the existing aquatic plant communities, characterize existing water quality, develop tools for relating lake water quality to land use, predict sensitivity of water and habitat quality to future changes in land use, identify critical landscape features, provide a practical summary of these results for use by citizens and county staff, and characterize and map levels of shoreline development and determine any relationships between development and wildlife communities.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Bughs Lake
Status
Complete
Bughs Lake Management District: Hlk - Bughs Lake Public Landing Restoration Project: Partnering with property owners, the Bughs Lake management district is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practices will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.
The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of the Healthy Lakes initiative, if applicable.
Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.
This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.
Grant Details
Lake Protection Grant
Date
5/5/1997
Waters Involved
Daggets Creek
Status
Complete
Butte Des Morts Conservation Club, Inc: Acq-Lake Butte Des Morts Land Acquisition-Molinski Property: The Butte des Morts Conservation Club will acquire approximately 1,183 acres of land, including 13,000 feet of shoreline, situated on Lake Butte des Morts in Winnebago County to protect Lake Butte des Morts, and its fish and wildlife habitat. The property is primarily shallow marshland including cattails, sedges and grasses. It also includes 164 acres of upland containing trees and shrubs. The goals of the property's management plan focus on 1) the protection of the lake and the Winnebago Pool Watershed, 2) the protection and restoration of the property's plant communities and fish and wildlife habitat, and 3) allowing public access to the property for recreational purposes.
Grant Details
Lake Protection Grant
Date
7/1/2011
Waters Involved
Deer Lake
Status
Complete
Waushara County: Lco-Waushara County Lakes Study And Plan (Group A Lakes): Phase Two of this Lake Planning study will involve up to seventeen Waushara County lakes (Group A) : Alpine Lake, Beans Lake, Bughs Lake, Curtis Lake, Deer Lake, Fish Lake, Little Hills Lake, Irogami Lake, Lake Huron, Long Lake, Marl Lake, Pine Lake, Pleasant Lake, Silver Lake, West Branch Mill P.(White River), White River Fl (Lower Pond), Witters Lake. The goals are to characterize the existing aquatic plant communities, characterize existing water quality, develop tools for relating lake water quality to land use, predict sensitivity of water and habitat quality to future changes in land use, identify critical landscape features, provide a practical summary of these results for use by citizens and county staff, and characterize and map levels of shoreline development and determine any relationships between development and wildlife communities.
Grant Details
Lake Protection Grant
Date
5/5/1997
Waters Involved
Fox River
Status
Complete
Butte Des Morts Conservation Club, Inc: Acq-Lake Butte Des Morts Land Acquisition-Molinski Property: The Butte des Morts Conservation Club will acquire approximately 1,183 acres of land, including 13,000 feet of shoreline, situated on Lake Butte des Morts in Winnebago County to protect Lake Butte des Morts, and its fish and wildlife habitat. The property is primarily shallow marshland including cattails, sedges and grasses. It also includes 164 acres of upland containing trees and shrubs. The goals of the property's management plan focus on 1) the protection of the lake and the Winnebago Pool Watershed, 2) the protection and restoration of the property's plant communities and fish and wildlife habitat, and 3) allowing public access to the property for recreational purposes.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Gilbert Lake
Status
Complete
Gilbert Lake Advancment Association Inc: Hlk - Gilbert Lake Healthy Lakes 2017: Partnering with property owners, the Gilbert Lake Advancement Association, Inc. is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practices will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.
The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of the Healthy Lakes initiative, if applicable.
Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.
This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.
Grant Details
Lake Protection Grant
Date
4/15/2020
Waters Involved
Gilbert Lake
Status
Complete
Gilbert Lake Advancment Association Inc: Hlk - Gilbert Lake Healthy Lakes Grant: Partnering with property owners, Gilber Lake Advancement Association is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special condistions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
7/1/2011
Waters Involved
Hills Lake
Status
Complete
Waushara County: Lco-Waushara County Lakes Study And Plan (Group A Lakes): Phase Two of this Lake Planning study will involve up to seventeen Waushara County lakes (Group A) : Alpine Lake, Beans Lake, Bughs Lake, Curtis Lake, Deer Lake, Fish Lake, Little Hills Lake, Irogami Lake, Lake Huron, Long Lake, Marl Lake, Pine Lake, Pleasant Lake, Silver Lake, West Branch Mill P.(White River), White River Fl (Lower Pond), Witters Lake. The goals are to characterize the existing aquatic plant communities, characterize existing water quality, develop tools for relating lake water quality to land use, predict sensitivity of water and habitat quality to future changes in land use, identify critical landscape features, provide a practical summary of these results for use by citizens and county staff, and characterize and map levels of shoreline development and determine any relationships between development and wildlife communities.
Grant Details
Lake Protection Grant
Date
7/1/2011
Waters Involved
Irogami Lake
Status
Complete
Waushara County: Lco-Waushara County Lakes Study And Plan (Group A Lakes): Phase Two of this Lake Planning study will involve up to seventeen Waushara County lakes (Group A) : Alpine Lake, Beans Lake, Bughs Lake, Curtis Lake, Deer Lake, Fish Lake, Little Hills Lake, Irogami Lake, Lake Huron, Long Lake, Marl Lake, Pine Lake, Pleasant Lake, Silver Lake, West Branch Mill P.(White River), White River Fl (Lower Pond), Witters Lake. The goals are to characterize the existing aquatic plant communities, characterize existing water quality, develop tools for relating lake water quality to land use, predict sensitivity of water and habitat quality to future changes in land use, identify critical landscape features, provide a practical summary of these results for use by citizens and county staff, and characterize and map levels of shoreline development and determine any relationships between development and wildlife communities.
Grant Details
Lake Protection Grant
Date
3/7/1997
Waters Involved
Johns Lake
Status
Complete
John'S Lake Management District: Acq-John'S Lake Land Acquisition - Marek Property: The John's Lake Lake Management District will acquire approximately 9.2 acres of land, including 550 feet of shoreline, situated on the western shore of John's Lake in Waushara County, for lake protection purposes. The primary goals of the land management plan are 1) to protect the lake's health and water quality by protecting a water recharge/wetland area for the lake contained on the property; 2) to ptotect the aquatic plant beds located off shore which support fisheries habitat and spawning; 3) to preserve the property in it's natural state to protect it's wildlife amd waterfowl habitat.
Grant Details
Lake Protection Grant
Date
7/1/2002
Waters Involved
Keller Lake
Status
Complete
Waupaca County: Acq-Keller Lake Land Acquisition: Waupaca County proposes to purchase 36 acres of unimproved property located adjacent to Keller Lake for conservancy purposes.
(The metes and bounds survey of this property indicates 57 acres of property, which includes acreage under Keller Lake: 21 acres. This entire purchase includes taking title of this 21 acres of lake bed. The valuation, however, does not include this 21 acres of lake bed because it has no value.)
Grant Details
Lake Protection Grant
Date
2/6/1997
Waters Involved
Kusel Lake
Status
Complete
Waushara County: Acq-Kusel Lake Land Acquisition - Petersen Property: Waushara county will acquire approximately 30.78 acres of land with 1,150 feet of shoreline to preserve and protect the shoreline and water quality of Kusel Lake. the primary goals of the property's management plan will be 1) TO MAINTAIN THE PROPERTY AS OPEN S[ACE/PARKLAND, 2) TO PRESERVE AHND RPOTECT THE PROPERTY'S SHORELINE IN ITS NATURAL STATE, 3) TO PRESERVE AND PROTECT THE PROPERTY'S WETLANDS, AND 4) TO ALLOW PUBLIC ACCESS FOR PASSIVE RECREATION INCLUDING HIKING AND CROSS COUNTRY SKIING.
Grant Details
Lake Protection Grant
Date
5/5/1997
Waters Involved
Lake Butte des Morts
Status
Complete
Butte Des Morts Conservation Club, Inc: Acq-Lake Butte Des Morts Land Acquisition-Molinski Property: The Butte des Morts Conservation Club will acquire approximately 1,183 acres of land, including 13,000 feet of shoreline, situated on Lake Butte des Morts in Winnebago County to protect Lake Butte des Morts, and its fish and wildlife habitat. The property is primarily shallow marshland including cattails, sedges and grasses. It also includes 164 acres of upland containing trees and shrubs. The goals of the property's management plan focus on 1) the protection of the lake and the Winnebago Pool Watershed, 2) the protection and restoration of the property's plant communities and fish and wildlife habitat, and 3) allowing public access to the property for recreational purposes.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Lake Poygan
Status
Complete
Lake Poygan Sportsman'S Club: Res-Lake Poygan Reed Restoration Project: The Lake Poygan Sportsman's Club proposes to conduct a Common Reed Grass stand restoration project on Lake Poygan. The project will ecologically characterize the structural and functional aspects of common reed grass stands, as well as develop information necessary for the management, protecction and rehabilitation of mid-lake wetlands.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Poygan
Status
Complete
Lake Poygan Sportsman'S Club: Res-Page'S Slough Carp Barrier Project: The Lake Poygan Sportsman's Club will build and install a mechanical carp barrier and rock berm at the mouth of Pages Slough, Lake Poygan. The rock berm will be approximately 300 feet in length with a fifty-foot base and 6 foot top deck. A ramp walk will be installed within the berm for access. This walk will be 50 feet in length and 24 feet wide. The mechanical barrier will be constructed of metal sheet piling and panels. A gated access will be built into the barrier for boats. The mechanical barrier will be approximately 100 feet in width. All materials and design will conform to the CH 30 permit requirements as isued by the WI DNR. The design will be reviewed and approved by Winnebago County Land and Water Conservation Dept.
Grant Details
Lake Protection Grant
Date
4/15/2020
Waters Involved
Lake Poygan
Status
Complete
Ducks Unlimited: Lmi - Poygan Breakwall Ii: Ducks Unlimited is sponsoring a project to construct a portion of the Poygan Breakwall \2013 Phase 2.
Project final deliverables include: all data collected, agendas and minutes for planning meetings, and a lake management plan that includes methodologies, results, and management alternatives discussion with an implementation plan.
Specific project activities include: 1) Construct 2,200 feet of the break-wall; 2) Monitor response of aquatic plant restoration, fishery & wildlife use; 3) Hold public meetings to educate and inform the public; 4) Issue press releases to affected clubs and public prior to construction; 5) Generate reports to update the Department and partners of project progress; 6) Submit a Final Report to the Department which summarize project activities along with recommendations of lessons learned.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Lyman Lake
Status
Complete
Waushara County: Acq-Meinen Land Acquisition On Lyman/Hartford Lake: Waushara County proposes to purchase 70 acres of land known as the Meinen parcel on Lyman (Hartford) Lake to be used for conservancy purposes.
Grant Details
Lake Protection Grant
Date
3/15/2024
Waters Involved
Pearl Lake
Status
Complete
Pearl Lake Protection & Rehabilitation Dist: Hlr - Pearl Lake Clmp Implementation - Shoreline Restoration (Healthy Lakes): Partnering with property owners, Pearl Lake Protection & Rehabilitation District is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
3/15/2024
Waters Involved
Pearl Lake
Status
Complete
Pearl Lake Protection & Rehabilitation Dist: Res - Pearl Lake Clmp Implementation - Shoreline Restoration: The Pearl Lake Protection and Rehabilitation District is sponsoring a project to implement recommended action items, including restoration and enhancement of near shore and shoreline habitat on Pearl Lake. Pearl Lake PRD has developed preliminary plans with two landowners to restore and enhance shoreline habitat in high priority areas of Pearl Lake.
Activities: 1) Lungwitz property native planting 2) Jelle property native planting 3) Maintenance of plants 4) 1 outreach event to encourage participation.
Deliverables: 1) 1 acre restoration with up to 200 native plugs and 25 native shrubs 2) restoration with up to 400 native plugs.
Conditions: Enter into land use agreements for lands not owned by Grantee and provide with reimbursement a copy of agreement recorded at the County Register of Deeds office.
This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.
If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.
Grant Details
Lake Protection Grant
Date
7/1/2011
Waters Involved
Pine Lake
Status
Complete
Waushara County: Lco-Waushara County Lakes Study And Plan (Group A Lakes): Phase Two of this Lake Planning study will involve up to seventeen Waushara County lakes (Group A) : Alpine Lake, Beans Lake, Bughs Lake, Curtis Lake, Deer Lake, Fish Lake, Little Hills Lake, Irogami Lake, Lake Huron, Long Lake, Marl Lake, Pine Lake, Pleasant Lake, Silver Lake, West Branch Mill P.(White River), White River Fl (Lower Pond), Witters Lake. The goals are to characterize the existing aquatic plant communities, characterize existing water quality, develop tools for relating lake water quality to land use, predict sensitivity of water and habitat quality to future changes in land use, identify critical landscape features, provide a practical summary of these results for use by citizens and county staff, and characterize and map levels of shoreline development and determine any relationships between development and wildlife communities.
Grant Details
Lake Protection Grant
Date
9/1/1997
Waters Involved
Pleasant Lake
Status
Complete
Pleasant Lake Improvement Corporation: Lmi-Pleasant Lake Run Off Control: Pleasant Lake Improvement Corporation proposes to implement their stormwater runoff control plan. The project diverts the runoff and it's associated sediments and pollutants away from Pleasant Lake and into a sand discharge area. The project activities include North and South diversions removed and replaced, a speed bump and west edge ramp removed and replaced as called for in the approved plans.
Grant Details
Lake Protection Grant
Date
4/15/2020
Waters Involved
Porters Lake
Status
Complete
Porters Lake Management District: Acq - Porters Lake Land Acquisition For Lake Protection Project: Porters Lake Management District will purchase 3 parcels of the Jarvis property totaling three acres of land along the western shoreline of Porters Lake in the Town of Mt Morris, Waushara Co, WI for the purpose of lake protection. The acquisition will result in protection of 593 feet of lake frontage.
Grant Details
Lake Protection Grant
Date
7/1/2011
Waters Involved
Silver Lake
Status
Complete
Waushara County: Lco-Waushara County Lakes Study And Plan (Group A Lakes): Phase Two of this Lake Planning study will involve up to seventeen Waushara County lakes (Group A) : Alpine Lake, Beans Lake, Bughs Lake, Curtis Lake, Deer Lake, Fish Lake, Little Hills Lake, Irogami Lake, Lake Huron, Long Lake, Marl Lake, Pine Lake, Pleasant Lake, Silver Lake, West Branch Mill P.(White River), White River Fl (Lower Pond), Witters Lake. The goals are to characterize the existing aquatic plant communities, characterize existing water quality, develop tools for relating lake water quality to land use, predict sensitivity of water and habitat quality to future changes in land use, identify critical landscape features, provide a practical summary of these results for use by citizens and county staff, and characterize and map levels of shoreline development and determine any relationships between development and wildlife communities.
Grant Details
Lake Protection Grant
Date
5/5/1997
Waters Involved
Spring Brook
Status
Complete
Butte Des Morts Conservation Club, Inc: Acq-Lake Butte Des Morts Land Acquisition-Molinski Property: The Butte des Morts Conservation Club will acquire approximately 1,183 acres of land, including 13,000 feet of shoreline, situated on Lake Butte des Morts in Winnebago County to protect Lake Butte des Morts, and its fish and wildlife habitat. The property is primarily shallow marshland including cattails, sedges and grasses. It also includes 164 acres of upland containing trees and shrubs. The goals of the property's management plan focus on 1) the protection of the lake and the Winnebago Pool Watershed, 2) the protection and restoration of the property's plant communities and fish and wildlife habitat, and 3) allowing public access to the property for recreational purposes.
Grant Details
Lake Protection Grant
Date
5/5/1997
Waters Involved
Unnamed
Status
Complete
Butte Des Morts Conservation Club, Inc: Acq-Lake Butte Des Morts Land Acquisition-Molinski Property: The Butte des Morts Conservation Club will acquire approximately 1,183 acres of land, including 13,000 feet of shoreline, situated on Lake Butte des Morts in Winnebago County to protect Lake Butte des Morts, and its fish and wildlife habitat. The property is primarily shallow marshland including cattails, sedges and grasses. It also includes 164 acres of upland containing trees and shrubs. The goals of the property's management plan focus on 1) the protection of the lake and the Winnebago Pool Watershed, 2) the protection and restoration of the property's plant communities and fish and wildlife habitat, and 3) allowing public access to the property for recreational purposes.
Grant Details
Lake Protection Grant
Date
5/5/1997
Waters Involved
Wolf River
Status
Complete
Butte Des Morts Conservation Club, Inc: Acq-Lake Butte Des Morts Land Acquisition-Molinski Property: The Butte des Morts Conservation Club will acquire approximately 1,183 acres of land, including 13,000 feet of shoreline, situated on Lake Butte des Morts in Winnebago County to protect Lake Butte des Morts, and its fish and wildlife habitat. The property is primarily shallow marshland including cattails, sedges and grasses. It also includes 164 acres of upland containing trees and shrubs. The goals of the property's management plan focus on 1) the protection of the lake and the Winnebago Pool Watershed, 2) the protection and restoration of the property's plant communities and fish and wildlife habitat, and 3) allowing public access to the property for recreational purposes.
Grant Details
Lake Protection Grant
Date
4/15/2020
Waters Involved
Wolf River
Status
Complete
Ducks Unlimited: Lmi - Poygan Breakwall Ii: Ducks Unlimited is sponsoring a project to construct a portion of the Poygan Breakwall \2013 Phase 2.
Project final deliverables include: all data collected, agendas and minutes for planning meetings, and a lake management plan that includes methodologies, results, and management alternatives discussion with an implementation plan.
Specific project activities include: 1) Construct 2,200 feet of the break-wall; 2) Monitor response of aquatic plant restoration, fishery & wildlife use; 3) Hold public meetings to educate and inform the public; 4) Issue press releases to affected clubs and public prior to construction; 5) Generate reports to update the Department and partners of project progress; 6) Submit a Final Report to the Department which summarize project activities along with recommendations of lessons learned.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Wolf River - Unnamed Horseshoe
Status
Complete
Wolf River Preservation Association: Lmi-Wolf River Erosion Control Project: The Wolf River Preservation Association proposes to conduct a project to restore two stream bank erosion areas extending a combined 1,000 linear feet along the main channel of the Wolf River. The project will reduce sediment loading, improve riparian habitat and provide potential fish spawning habitat.
Grant Details
Large Scale Lake Planning
Date
2/15/2017
Waters Involved
Alder Creek
Status
Complete
Fox Wolf Watershed Alliance: Winnebago Lakes Comprehensive Planning - Lake Poygan: The Fox \2013 Wolf Watershed Alliance is sponsoring a project to develop a Comprehensive Lake Management Plan (LMP) for Lake Poygan.
Specific project activities include: 1) Develop communication strategy; 2) Create LMP structural framework; 3) Develop committees for each LMP element; 4) Establish issue related focus groups and encourage stakeholder participation; 5) Determine need for third party consultant assistance.
Project final deliverables include: 1) Committees identify outstanding issues, data gaps and possible actions to address lake issues, 2) Committees begin to draft language for LMP sections, 3) Hold 3 Town-hall meetings; 4) Develop website; 5) Issue press releases; 6) If determined necessary, engage third party consultants for project assistance; 7) Develop Phase 4 strategy for completion of LMP.
Special Conditions: 1) All data shall be entered into the SWIMS database; 2) Draft sociological/user surveys and shoreline assessments must be reviewed and approved by the Department before being initiated 3) Documentation of volunteer labor and donated services shall be collected and maintained in accordance with grant program guidelines for reporting in kind donations.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Final reports: it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
2/15/2017
Waters Involved
Arrowhead River
Status
Complete
Fox Wolf Watershed Alliance: Winnebago Lakes Comprehensive Planning - Lake Winneconne: The Fox \2013 Wolf Watershed Alliance is sponsoring a project to develop a Comprehensive Lake Management Plan (LMP) for Lake Winneconne.
Specific project activities include: 1) Develop communication strategy; 2) Create LMP structural framework; 3) Develop committees for each LMP element; 4) Establish issue related focus groups and encourage stakeholder participation; 5) Determine need for third party consultant assistance.
Project final deliverables include: 1) Committees identify outstanding issues, data gaps and possible actions to address lake issues, 2) Committees begin to draft language for LMP sections, 3) Hold 3 Town-hall meetings; 4) Develop website; 5) Issue press releases; 6) If determined necessary, engage third party consultants for project assistance; 7) Develop Phase 4 strategy for completion of LMP.
Special Conditions: 1) All data shall be entered into the SWIMS database; 2) Draft sociological/user surveys and shoreline assessments must be reviewed and approved by the Department before being initiated 3) Documentation of volunteer labor and donated services shall be collected and maintained in accordance with grant program guidelines for reporting in kind donations.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Final reports: it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/25/1993
Waters Involved
Bruce Creek
Status
Complete
Alpine Lake P & R District: Lake Alpine Management Planning: Conduct water quality monitoring of lake. Prepare a water budget for the lake. Conduct an aquatic plant survey. Map plant bed locations. Prepare an analysis of fish habitat and ecology in the lake.
Grant Details
Large Scale Lake Planning
Date
4/1/2002
Waters Involved
Bruce Creek
Status
Complete
Alpine Lake P & R District: Alpine Lake Apm Plan Dev & Prelim Watershed Assessment: Alpine Lake District proposes to develop a comprehensive lake management plan that would be used as a guide for the future management, enhancement, and protection of Alpine Lake and its watershed. Specifically, the project will conduct a comprehensive aquatic macrophyte survey, collect water quality data, delineate the lakes watershed and identify any potential problem areas, and provide an information and education component.
A final report in the form of an aquatic plant management plan for Alpine Lake will be provided to the Department of Natural Resources in both a paper copy and an electronic copy. Information will be disseminated to the public via informational meetings, news releases and through articles in the Alpine Lake District newsletter.
Grant Details
Large Scale Lake Planning
Date
10/1/2010
Waters Involved
Emerald Lake
Status
Complete
Mt. Morris Lakes Management District: Mt. Morris Lake Management Plan Update Ph 3: The Mount Morris Lake Protection and Rehabilitation District proposes to conduct Phase 3 of their lake planning grant which will employ public participation process, final analysis and report preparation. The deliverable will be stakeholder adopted and updated lake management plan. If a consultant is to provide the final report, it is recommended that the Grantee provide the Department Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. The Department shall receive both paper and electronic PDF copies of the final report along with, or prior to submission of the grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/1996
Waters Involved
Gilbert Lake
Status
Complete
Gilbert Lake Advancement Association, Inc.: Gilbert Lake Eurasian Watermilfoil Weevil Study: The Gilbert Lake Advancement Association proposes to evaluate the effect of the supplemental enhancement of weevil populations as a selective aquatic plant management technique to control Myriophyllum spicatum. Project activities will result in a field evaluation of experimental weevil stocking, a status report and presentation to the lake group, and a final report including feasibility recommendations. The Department of Natural Resources will be provided with a paper copy and an electronic copy of the final report. Information about the project will be disseminated to the public by fact sheet distribution, public meetign, and summary report mailing.
Grant Details
Large Scale Lake Planning
Date
4/2/1991
Waters Involved
Hills Lake
Status
Complete
Big Hills Lake Management District: Big Hills Lake Macrophyte Survey: 1) Conduct a macrophyte study and compare to 1979 study. 2) Prepare report of survey findings and analyze available water chemistry.3) Mail summary of survey to district residents, make presentation of information and implementation plan at annual meeting.4) Disseminate information to the public through newsletter mailings, report mailings, and local media.
Grant Details
Large Scale Lake Planning
Date
3/28/1996
Waters Involved
Hills Lake
Status
Complete
Big Hills Lake Management District: Big Hills Lake County Park Shoreland Restoration Plan: The Big Hills Lake Management District proposes to conduct a shoreland restoration project at Big Hills Lake. Activities will include selecting a natural landscape architect who will provide technical assistance to lake property owners by preparing individualized site plans. These site plans will guide property owners in restoring or enhancing their buffer zones and reduce runoff and erosion while improving wildlife and plant habitat. The sponsor will disseminate information to the public by newsletter, public meeting, and local newspaper article(s). The sponsor will also provide the Department of Natural Resources with a paper copy and an electronic copy of the final report.
Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Hills Lake
Status
Complete
Big Hills Lake Protection & Rehabilitation D: Big Hills Lake Comprehensive Management Plan Study: The Big Hills Lake Protection & Rehabilitation District proposes to conduct a comprehensive lake management plan. Project deliverables include public education, goal and objective setting, mapping of watershed and land uses, aquatic macrophyte survey, and water quality sampling. (See application for more details.)
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Large Scale Lake Planning
Date
4/1/2002
Waters Involved
Hills Lake
Status
Complete
Little Hills Lake Management District: Little Hills Lake Comprehensive Management Plan: Little Hills Lake Management District proposes to development of a comprehensive lake management plan that would be used as a guide for the future management, enhancement, and protection of Little Hills Lake and its watershed. Specifically, the project will delineate the lakes watershed and existing land use, collect baseline water quality conditions, conduct a comprehensive aquatic vegetation survey, and provide an information and education component.
A report in the form of a comprehensive lake management plan will be provided to the Department of Natural Resources in both a paper copy and an electronic copy. Information will be disseminated to the public via a project kickoff meeting, a presentation of the results at the completion of the project, news releases and through articles in the Little Hills Lake District newsletter.
Grant Details
Large Scale Lake Planning
Date
10/1/2009
Waters Involved
Hills Lake
Status
Complete
Big Hills Lake Protection & Rehabilitation D: Big Hills Comprehensive Survey Project: The Big Hills Lake Protection and Rehab District proposes to conduct a comprehesnive survey of Big Hills Lake. The scope of this project includes several appraisal actions with the ultimate development of an amendment to the existing lake management plan. Deliverables include:
\2022 Characterize current water quality following protocol via UW-Stevens Point schedule (7 events, multiple parameters w/ profiling) and develop reasonable objectives based on results.
\2022 Evaluate and characterize the aquatic plant community via summer PI survey
\2022 Evaluate AIS plants via focused spring PI survey
\2022 Conduct fishery review utilizing existing data and develop management recommendations. Conduct field appraisal of fish and wildlife habitat and map.
\2022 Conduct property owner\2019s survey to define issues and guide plan development. This would be a citizen participation action.
\2022 Summary report with recommendations relative to water quality, fishery, and aquatic plants
This scope is intended to summarize the more specific scope provided in the grant application and does not supersede the specific scope elements described within the application
Grant Details
Large Scale Lake Planning
Date
4/15/1993
Waters Involved
Irogami Lake
Status
Complete
Irogami Lake Management District: Irogami Lake Management Planning: Conduct in-lake water quality sampling for parameters and on schedule shown in Table 1 attached to application. The sampling location is shown in Figure 1, attached to the application. Update watershed inventory conducted in 1983. Delineate watershedboundaries; map land use and potential pollution sources. Estimate sediment and phosphorous loading to lake using computer models. Produce a map which shows significant pollution sources. Prepare a lake management plan which will include elementslisted in 'C.4 Preparation of a Lake Management Plan', attached to the application. Information will be disseminated to the public by newsletter mailings, public meetings, and local newspaper articles. Project results will be reposited at the locallibrary and town halls.
Grant Details
Large Scale Lake Planning
Date
11/19/1991
Waters Involved
Johns Lake
Status
Complete
John'S Lake Management District: John'S Lake Water Qual Monitor, Watershed Map, Septic Survey: Delineate watershed boundaries, lake shore use, sites of potential groundwater quality impact, problem and sensitive areas.Produce ground water flow map. Conduct water quality monitoring. Document water quality trends from 1992 & 1993 collected data.Conduct inventory of septic systems around the lake using county records and representative field sampling. Identify potential problem areas and septic systems types that may negatively impact groundwater quality.Information will be disseminated to the public by newsletter mailing, local newspaper articles, a public meeting, and summary report mailings.
Grant Details
Large Scale Lake Planning
Date
10/25/1993
Waters Involved
Keller Lake
Status
Complete
Waupaca County: Keller Lake Management Planning: Assemble and review existing information on the lake and its watershed to determine what additional information needs to be obtained on water quality and land use nutrient imputs. Conduct water quality monitoring for parameters and on schedule as described in the application. Conduct aquatic plant survey.
Grant Details
Large Scale Lake Planning
Date
10/1/1996
Waters Involved
Kusel Lake
Status
Complete
Kusel, Wilson, & Round Lakes R & P District: Kusel Lake Eurasian Watermilfoil Weevil Study: The Kusel, Wilson, and Round Lakes Rehabilitation and Protection District proposes to evaluate the effect of the supplemental enhancement of weevil populations as a selective aquatic plant management technique to control Myriophyllum spicatum. Project activities will result in a field evaluation of experimental weevil stocking, a status report and presentation to the lake group, and a final report including feasibility recommendations. The Department of Natural Resources will be provided with a paper copy and an electronic copy of the final report. Information about the project will be disseminated to the public by fact sheet distribution, public meeting, and summary report mailing.
Grant Details
Large Scale Lake Planning
Date
4/1/2001
Waters Involved
Kusel Lake
Status
Complete
Kusel, Wilson, & Round Lakes R & P District: Kusel Lake Aquatic Plant Management Plan Phase I: The Kusel, Wilson, Round Lakes Protection and Rehabilitation District proposes to conduct an aquatic plant survey, collect water quality data, and develop a long range aquatic plant management plan for Kusel Lake. The whole lake aquatic plant survey and water chemistry analysis results will be used to develop a long range aquatic plant management plan that proposes a course of action for combating Kusel Lake's Eurasian Watermilfoil problem. The DNR will be provided with both a paper copy and an electronic copy of the survey results and management plan. A copy of the management plan will be provided to all Kusel Lake property owners. Copies of the plan will also be made available to county personnel, supporting organizations and other interested parties. Information will also be disseminated via the Lake District's newsletter and annual meeting.
Grant Details
Large Scale Lake Planning
Date
4/1/2008
Waters Involved
Kusel Lake
Status
Complete
Kusel, Wilson, & Round Lakes P & R District: Kusel Lake Apm Plan Development: The Kusel, Wilson, Round Lakes P&R District proposes to develop an AMP plan for Kusel Lake. The project will conduct appraisals and develop the following products:
1. Invasive plant species mapping, 2. Water quality sampling , TSI development, profiling, 3. Watershed appraisal of land uses including WILMS Lake Modeling, 4. Watershed appraisal including visual identification of potential nutrient and sediment sources with recommended strategies, 5. Shore area identification of high erosion, instability, and poor riparian health, 6. Septic system survey ;system age, maintenance history, days of use and # of residents. Watershed and septic assessments will be integrated with Waushara County, 7. The above elements will be incorporated into a final report with recommendations following a citizen participation process.
Grant Details
Large Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Morris
Status
Complete
Mt. Morris Lakes Management District: Mt. Morris Lake Comprehensive Lake Management Plan Phase 2: The Mt. Morris Lake District proposes to develop a lake management plan to include:
1. Watershed delineation and mapping
2. Appraisal of potential point sources of pollutants
3. Water quality appraisal and trophic condition determination
4. Specific actions are identified within the original planning grant proposal
5. The final Lake Management Plan including a citizen participation process
Grant Details
Large Scale Lake Planning
Date
4/1/2004
Waters Involved
Lake Morris
Status
Complete
Mt. Morris Lakes Management District: Mt. Morris Lake Comprehensive Lake Managemnt Plan Phase 1: The Mt. Morris Lake District proposes to develop a lake management plan to include:
1. An aquatic plant survey including mapping of EWM and ID of all species
2. Plant community mapping
3. A citizen participation process
4. Specific actions are identified within the original planning grant proposal
Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Lake Morris
Status
Complete
Mt. Morris Lakes Management District: Mt. Morris Lakes Management Plan Update Ph 1: Mt Morris Lake Management District proposes to complete Phase 1 of a Managment Plan Upgrade on their lake. Project deliverables include the following:
1. Conduct Stakeholder participation process
2. Assess watershed and water quality
3. Review and integrate fisheries data
4. Conduct shoreline assessment
Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Lake Morris
Status
Complete
Mt. Morris Lakes Management District: Mt. Morris Lakes Management Plan Update Ph 2: Mt Morris Lake Management District proposes to complete Phase 2 of a Management Plan Upgrade on their lake. Project deliverables include the following:
1. Complete sediment survey
2. Evaluate efficacy of AIS treatments via CLP survey and vouchering
3. Conduct Zebra Mussel appraisal
4. Complete Update of Comprehensive Plan
Grant Details
Large Scale Lake Planning
Date
4/1/1997
Waters Involved
Lake Poygan
Status
Complete
Lake Poygan Sportsman'S Club: Lake Poygan Aquatic Plant Study & Management Plan: Lake Poygan Sportsman's Club proposes to do a comprehensive historical and current status study of Lake Poygan's common reed (Phragmites australis). The study will take into account the water levels and climatological data from historical records back to the mid-1930's. Current reed health will also be reported and compared in the final project results.
Grant Details
Large Scale Lake Planning
Date
2/15/2017
Waters Involved
Lake Poygan
Status
Complete
Fox Wolf Watershed Alliance: Winnebago Lakes Comprehensive Planning - Lake Poygan: The Fox \2013 Wolf Watershed Alliance is sponsoring a project to develop a Comprehensive Lake Management Plan (LMP) for Lake Poygan.
Specific project activities include: 1) Develop communication strategy; 2) Create LMP structural framework; 3) Develop committees for each LMP element; 4) Establish issue related focus groups and encourage stakeholder participation; 5) Determine need for third party consultant assistance.
Project final deliverables include: 1) Committees identify outstanding issues, data gaps and possible actions to address lake issues, 2) Committees begin to draft language for LMP sections, 3) Hold 3 Town-hall meetings; 4) Develop website; 5) Issue press releases; 6) If determined necessary, engage third party consultants for project assistance; 7) Develop Phase 4 strategy for completion of LMP.
Special Conditions: 1) All data shall be entered into the SWIMS database; 2) Draft sociological/user surveys and shoreline assessments must be reviewed and approved by the Department before being initiated 3) Documentation of volunteer labor and donated services shall be collected and maintained in accordance with grant program guidelines for reporting in kind donations.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Final reports: it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
2/15/2017
Waters Involved
Lake Poygan
Status
Complete
Fox Wolf Watershed Alliance: Winnebago Lakes Comprehensive Planning - Lake Winneconne: The Fox \2013 Wolf Watershed Alliance is sponsoring a project to develop a Comprehensive Lake Management Plan (LMP) for Lake Winneconne.
Specific project activities include: 1) Develop communication strategy; 2) Create LMP structural framework; 3) Develop committees for each LMP element; 4) Establish issue related focus groups and encourage stakeholder participation; 5) Determine need for third party consultant assistance.
Project final deliverables include: 1) Committees identify outstanding issues, data gaps and possible actions to address lake issues, 2) Committees begin to draft language for LMP sections, 3) Hold 3 Town-hall meetings; 4) Develop website; 5) Issue press releases; 6) If determined necessary, engage third party consultants for project assistance; 7) Develop Phase 4 strategy for completion of LMP.
Special Conditions: 1) All data shall be entered into the SWIMS database; 2) Draft sociological/user surveys and shoreline assessments must be reviewed and approved by the Department before being initiated 3) Documentation of volunteer labor and donated services shall be collected and maintained in accordance with grant program guidelines for reporting in kind donations.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Final reports: it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
2/15/2018
Waters Involved
Lake Poygan
Status
Complete
Fox Wolf Watershed Alliance: Winnebago Lakes Comprehensive Planning, Poygan Phase 4: The Fox \2013 Wolf Watershed Alliance is sponsoring a project to develop a Comprehensive Lake Management Plan (LMP) for Lake Poygan.
Specific project activities / deliverables include: 1) Develop & implement multiple communication strategies; 2) improve project awareness through community engagement events, 3) Improve information and education outreach through activities / presentations designed to meet specific stakeholder needs, 4) create & engage focus groups to prioritize management recommendations, 5) conduct citizen survey of 1,000 shoreline property owners, conduct aquatic plant PI survey of entire lake system, 6) identify & prioritize a list of habitat improvement projects, 7) complete comprehensive management / APM / AIS Strategic plan and obtain DNR approval and 8) conduct Plan Adoption Outreach, Engagement, and Communication activities to ensure LMP implementation.
Special Conditions: 1) All data shall be entered into the SWIMS database; 2) Draft sociological/user surveys and shoreline assessments must be reviewed and approved by the Department before being initiated
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Final reports: it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
2/15/2017
Waters Involved
Lake Winneconne
Status
Complete
Fox Wolf Watershed Alliance: Winnebago Lakes Comprehensive Planning - Lake Poygan: The Fox \2013 Wolf Watershed Alliance is sponsoring a project to develop a Comprehensive Lake Management Plan (LMP) for Lake Poygan.
Specific project activities include: 1) Develop communication strategy; 2) Create LMP structural framework; 3) Develop committees for each LMP element; 4) Establish issue related focus groups and encourage stakeholder participation; 5) Determine need for third party consultant assistance.
Project final deliverables include: 1) Committees identify outstanding issues, data gaps and possible actions to address lake issues, 2) Committees begin to draft language for LMP sections, 3) Hold 3 Town-hall meetings; 4) Develop website; 5) Issue press releases; 6) If determined necessary, engage third party consultants for project assistance; 7) Develop Phase 4 strategy for completion of LMP.
Special Conditions: 1) All data shall be entered into the SWIMS database; 2) Draft sociological/user surveys and shoreline assessments must be reviewed and approved by the Department before being initiated 3) Documentation of volunteer labor and donated services shall be collected and maintained in accordance with grant program guidelines for reporting in kind donations.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Final reports: it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
2/15/2017
Waters Involved
Lake Winneconne
Status
Complete
Fox Wolf Watershed Alliance: Winnebago Lakes Comprehensive Planning - Lake Winneconne: The Fox \2013 Wolf Watershed Alliance is sponsoring a project to develop a Comprehensive Lake Management Plan (LMP) for Lake Winneconne.
Specific project activities include: 1) Develop communication strategy; 2) Create LMP structural framework; 3) Develop committees for each LMP element; 4) Establish issue related focus groups and encourage stakeholder participation; 5) Determine need for third party consultant assistance.
Project final deliverables include: 1) Committees identify outstanding issues, data gaps and possible actions to address lake issues, 2) Committees begin to draft language for LMP sections, 3) Hold 3 Town-hall meetings; 4) Develop website; 5) Issue press releases; 6) If determined necessary, engage third party consultants for project assistance; 7) Develop Phase 4 strategy for completion of LMP.
Special Conditions: 1) All data shall be entered into the SWIMS database; 2) Draft sociological/user surveys and shoreline assessments must be reviewed and approved by the Department before being initiated 3) Documentation of volunteer labor and donated services shall be collected and maintained in accordance with grant program guidelines for reporting in kind donations.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Final reports: it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
2/15/2018
Waters Involved
Lake Winneconne
Status
Complete
Fox Wolf Watershed Alliance: Winnebago Lakes Comprehensive Planning, Winneconne Phase 4: The Fox \2013 Wolf Watershed Alliance is sponsoring a project to develop a Comprehensive Lake Management Plan (LMP) for Lake Winneconne.
Specific project activities / deliverables include: 1) Develop & implement multiple communication strategies; 2) improve project awareness through community engagement events, 3) Improve information and education outreach through activities / presentations designed to meet specific stakeholder needs, 4) create & engage focus groups to prioritize management recommendations, 5) conduct citizen survey of 1,000 shoreline property owners, conduct aquatic plant PI survey of entire lake system, 6) identify & prioritize a list of habitat improvement projects, 7) complete comprehensive management / APM / AIS Strategic plan and obtain DNR approval and 8) conduct Plan Adoption Outreach, Engagement, and Communication activities to ensure LMP implementation.
Special Conditions: 1) All data shall be entered into the SWIMS database; 2) Draft sociological/user surveys and shoreline assessments must be reviewed and approved by the Department before being initiated
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Final reports: it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
4/26/1993
Waters Involved
Long Lake
Status
Complete
Long Lake Association: Long Lake Management Planning: Conduct water quality monitoring in 1993-94. Map watershed and conduct an inventory of land use in the watershed. Estimate sediment and phosphorus loading to the lake.Prepare a water and nutrient budget for lake.Disseminate information to the public by newsletter, local newpaper articles, public meetings, and final report.
Grant Details
Large Scale Lake Planning
Date
10/25/1993
Waters Involved
Long Lake
Status
Complete
Long Lake Association: Long Lake Management Planning & Septic System Inspections: Conduct water quality monitoring; conduct water level monitoring; map watershed and conduct land use inventory; estimate seiment and phosphorus loading to the lake; identify environmentally sensitive areas in the watershed; prepare water and nutrient budgets for lake; conduct inspections of some septic systems surrounding the lake.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Long Lake
Status
Complete
Long Lake Association: Long Lake Management & Proteciton Planning: 1) Prepare and implement a protection plan for Long Lake. 2) Develop a plan to protect sensitive areas identified on Long Lake through planning grant #LPL-210. 3) Develop a management plan to guide local ordinance development and land use decisions.4) Prepare a final report which will include the tasks listed above. 5) The grantee will disseminate information to the public by newsletter mailings, public meetings, summary report mailings, local newspaper articles, and a comprehensive managementplan. The grantee will provide the Department of Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited at the Town of Saxeville and at the Town of Springville.
Grant Details
Large Scale Lake Planning
Date
4/1/2008
Waters Involved
Long Lake
Status
Complete
Long Lake Association: Long Lake Comprehensive Lake Survey: The Long Lake Association proposes to conduct a comprehensive lake study on their lake. The project will conduct appraisals and develop the following products:
1. Invasive plant species mapping, 2. Point Intercept survey of aquatic plants, 3. Water quality sampling in each lake basin, TSI development, profiling, 4. Historical water quality summary and interpretation, 5. Watershed appraisal of land uses including WILMS Lake Modeling, 6. Watershed appraisal including visual identification of potential nutrient and sediment sources with recommended strategies, 7. Shore area identification high erosion, instability, and general riparian health, 8. Septic system survey system age, maintenance history, days of use and # of residents. Watershed and septic assessments will be integrated with Waushara County, 9. The above elements will be incorporated into a final report with recommendations following citizen participation process.
AMENDMENT: #8 SEPTIC SYSTEM SURVEY IS DELETED.
Grant Details
Large Scale Lake Planning
Date
10/1/1996
Waters Involved
Pearl Lake
Status
Complete
Pearl Lake Protection & Rehabilitation Dist: Pearl Lake Eurasian Watermilfoil Weevil Study: The Pearl Lake Protection & Rehabilitation District proposes to evaluate the effect of the supplemental enhancement of weevil populations as a selective aquatic plant management technique to control Myriophyllum spicatum. Project activities will result in a field evaluation of experimental weevil stocking, a status report and presentation to the lake group, and a final report including feasibility recommendations. The Department of Natural Resources will be provoided with a paper copy and an electronic copy of the final report. Information about the project will be disseminated to the public by fact sheet distribution, public meeting, and summary report mailing.
Grant Details
Large Scale Lake Planning
Date
10/1/2009
Waters Involved
Pearl Lake
Status
Complete
Pearl Lake Protection & Rehabilitation Dist: Pearl Lake Comprehensive Survey Project: Pearl Lake Protection & Rehab District proposes to contuct a comprehesive survey of Pearl Lake. The scope of this project includes several appraisal actions with the ultimate development of an amendment to the existing lake management plan. Deliverables include:
\2022 Characterize current water quality following protocol via UW-Stevens Point schedule (7 events, multiple parameters w/ profiling) and develop reasonable objectives based on results. Additionally, approximately 5 samples will be analyzed for fecal coliform bacteria.
\2022 Evaluate and characterize the aquatic plant community via summer PI survey
\2022 Evaluate AIS plants via focused spring PI survey
\2022 Conduct fishery review utilizing existing data and develop management recommendations. Conduct field appraisal of fish and wildlife habitat and map.
\2022 Conduct property owner\2019s survey to define issues and guide plan development. This would be a citizen participation action.
Summary report with recommendations relative to water quality, fishery, and aquatic plants
Grant Details
Large Scale Lake Planning
Date
3/15/2022
Waters Involved
Pearl Lake
Status
Complete
Pearl Lake Protection & Rehabilitation Dist: Comp - Pearl Lake Comprehensive Management Plan: The Pearl Lake Protection and Rehabilitation District is sponsoring a grant to develop a Comprehensive Lake Management Plan for Pearl Lake.
Project final deliverables include: All data collected, agendas and minutes for planning meetings, and a lake management plan that includes methodologies, results, and management alternatives discussion with an implementation plan.
Specific project activities include: 1) In-lake water quality monitoring; 2) Conduct sociologic survey; 3) Water level monitoring and study; 4) WiLMS watershed modeling; 5) Public education and outreach activities; 6) Shoreline habitat assessment survey; 7) Aquatic plant surveys; 8) Management planning meetings.
Special Conditions: Draft sociological/user surveys and shoreline assessments must be reviewed and approved by the Department before being initiated.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist. It is recommended that Grantee provide DNR Lake Coordinator with a draft of final report for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Large Scale Lake Planning
Date
6/7/2001
Waters Involved
Pine Lake
Status
Complete
Pine Lake Property Owners Assn: Pine Lake Management Plan Phase I: The Pine Lake Property Owners Association proposes to begin development of a comprehensive lake management plan for Pine Lake. The study will take place in two phases. This is phase one of the study and will include the following: 1) surface water quality monitoring; 2) determine areas of groundwater inflow and outflow along with the quality of the groundwater flowing into the lake; 3) aquatic plant survey and sediment/plant/interstitial water evaluation; 4) fishery survey; 5) surface and groundwater watershed analysis; 6) shoreland and sensitive area assessment; and 7) watershed resident survey. Results from this phase of the study will be summarized and presented to the Pine Lake watershed residents at the Association's annual meeting and picnic.
A progress report will be submitted to the DNR after completion of phase one of the study with a comprehensive final report being submitted after completion of phase two.
Grant Details
Large Scale Lake Planning
Date
6/7/2001
Waters Involved
Pine Lake
Status
Complete
Pine Lake Property Owners Assn: Pine Lake Management Plan Phase Ii: The Pine Lake Property Owners Association proposes to finish development of a comprehensive lake management plan for Pine Lake. The study will take place in two phases. This is phase two of the study and will include the following: 1) complete the surface water sampling component of the study initiated in phase one; 2) collect and analyse samples from 60 private wells located within the Pine Lake groundwater watershed to provide information on the deeper groundwater discharging into the lake; 3) calculate nutrient and water budgets; and 4) conduct a fish population comparison using data collected in phase one and historic DNR data. Results from both phase one and phase two will be summarized in a final report that will describe the water quality and physical lake characteristics, its watershed and associated land uses, water and and nutrient budgets and modeling results, and interpretation of the data as well as recommendations. The final report will be provided to the DNR in both a paper copy and an electronic copy. This report will also be distributed to the Wautoma library, Fox-Wolf 2000, Fox-Wolf Basin Educator, Waushara County Land Conservation Department, and the Wisconsin Water Resources Center. Environmental Task Force Program staff will present the final results to the Association upon completion.
Grant Details
Large Scale Lake Planning
Date
2/15/2017
Waters Involved
Pine River
Status
Complete
Fox Wolf Watershed Alliance: Winnebago Lakes Comprehensive Planning - Lake Poygan: The Fox \2013 Wolf Watershed Alliance is sponsoring a project to develop a Comprehensive Lake Management Plan (LMP) for Lake Poygan.
Specific project activities include: 1) Develop communication strategy; 2) Create LMP structural framework; 3) Develop committees for each LMP element; 4) Establish issue related focus groups and encourage stakeholder participation; 5) Determine need for third party consultant assistance.
Project final deliverables include: 1) Committees identify outstanding issues, data gaps and possible actions to address lake issues, 2) Committees begin to draft language for LMP sections, 3) Hold 3 Town-hall meetings; 4) Develop website; 5) Issue press releases; 6) If determined necessary, engage third party consultants for project assistance; 7) Develop Phase 4 strategy for completion of LMP.
Special Conditions: 1) All data shall be entered into the SWIMS database; 2) Draft sociological/user surveys and shoreline assessments must be reviewed and approved by the Department before being initiated 3) Documentation of volunteer labor and donated services shall be collected and maintained in accordance with grant program guidelines for reporting in kind donations.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Final reports: it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
4/1/2006
Waters Involved
Porters Lake
Status
Complete
Porters Lake Management District: Porters Lake Comprehensive Management Plan Project Ph 1: The Porters Lake P&R District proposes to conduct Phase 1 of a comprehensive lake management plan for Porters Lake. The project will include Watershed Area Definition, Watershed P Load Estimate, Lake Water Quality Trophic Appraisal, and Lake Education Initiative. The project deliverables will be Reports on Watershed Area Definition, Watershed P Load Estimate, Lake Water Quality Trophic Appraisal, and Lake Education Initiative incorporation into draft Lake Management Plan.
Grant Details
Large Scale Lake Planning
Date
4/1/2006
Waters Involved
Porters Lake
Status
Complete
Porters Lake Management District: Porters Lake Comprehensive Management Plan Project Ph 2: The Porters Lake P&R District proposes to conduct Phase 2 of a comprehensive lake management plan for Porters Lake. The project will include a Point Intercept Aquatic Plant survey, Curley Leaf Pondweed Assessment and Plant Community Mapping. Project deliverables will include Reports on Point Intercept Aquatic Plant survey, Curley Leaf Pondweed Assessment, Plant Community Mapping with subsequent incorporation into Lake Management Plan. After this phase a final Lake Management Comp Plan will be delivered.
Grant Details
Large Scale Lake Planning
Date
2/15/2017
Waters Involved
Pumpkinseed Creek
Status
Complete
Fox Wolf Watershed Alliance: Winnebago Lakes Comprehensive Planning - Lake Poygan: The Fox \2013 Wolf Watershed Alliance is sponsoring a project to develop a Comprehensive Lake Management Plan (LMP) for Lake Poygan.
Specific project activities include: 1) Develop communication strategy; 2) Create LMP structural framework; 3) Develop committees for each LMP element; 4) Establish issue related focus groups and encourage stakeholder participation; 5) Determine need for third party consultant assistance.
Project final deliverables include: 1) Committees identify outstanding issues, data gaps and possible actions to address lake issues, 2) Committees begin to draft language for LMP sections, 3) Hold 3 Town-hall meetings; 4) Develop website; 5) Issue press releases; 6) If determined necessary, engage third party consultants for project assistance; 7) Develop Phase 4 strategy for completion of LMP.
Special Conditions: 1) All data shall be entered into the SWIMS database; 2) Draft sociological/user surveys and shoreline assessments must be reviewed and approved by the Department before being initiated 3) Documentation of volunteer labor and donated services shall be collected and maintained in accordance with grant program guidelines for reporting in kind donations.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Final reports: it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
7/21/1994
Waters Involved
Silver Lake
Status
Complete
Silver Lake Sanitary District: Silver Lake Water Quality And Sedimentation Study: The Department is requiring monitoring and water chemistry samples at the discharge point where water is being pumped into lower water levels of Silver Lake. Alpine Lake, downstream, has concerns and the data will indicate sediment delivery. The otheraspect is a tropic state determination for Silver Lake over two year period. Infromation will be disseminated to the public by newletter, local newspaper articles and public hearings. Project results will be reposited at Union State Bank, M & I MidstateWautoma, WI, 54982.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Silver Lake
Status
Complete
Silver Lake Management District: Silver Lake Comprehensive Study: The Silver Lake District proposes to conduct a project for the appraisal of lake conditions to include:
1. A line transect plant survey of submergent and emergent aquatic plants with subsequent mapping and focus on invasive species.
2. A water quality appraisal including trophic condition identification, lake profiling, and summarization of volunteer water clarity data.
3. Groundwater flow analysis including flow volume and direction
4. Conduct watershed appraisal to include defining watershed, land use/cover types, and identification of nutrient loads via export coefficents.
5. Conduct a property owners survey
Note: the funding of sediment coring and analysis as indicated in the original project proposal is being denied. This aspect is not clearly defined and the applicability of core data to management decisions is questioned. This scope is intended as a summary only. Required specific project components are included in the grant application project description.
Grant Details
Large Scale Lake Planning
Date
10/25/1993
Waters Involved
Unnamed
Status
Complete
Alpine Lake P & R District: Lake Alpine Management Planning: Conduct water quality monitoring of lake. Prepare a water budget for the lake. Conduct an aquatic plant survey. Map plant bed locations. Prepare an analysis of fish habitat and ecology in the lake.
Grant Details
Large Scale Lake Planning
Date
4/1/2002
Waters Involved
Unnamed
Status
Complete
Alpine Lake P & R District: Alpine Lake Apm Plan Dev & Prelim Watershed Assessment: Alpine Lake District proposes to develop a comprehensive lake management plan that would be used as a guide for the future management, enhancement, and protection of Alpine Lake and its watershed. Specifically, the project will conduct a comprehensive aquatic macrophyte survey, collect water quality data, delineate the lakes watershed and identify any potential problem areas, and provide an information and education component.
A final report in the form of an aquatic plant management plan for Alpine Lake will be provided to the Department of Natural Resources in both a paper copy and an electronic copy. Information will be disseminated to the public via informational meetings, news releases and through articles in the Alpine Lake District newsletter.
Grant Details
Large Scale Lake Planning
Date
2/15/2017
Waters Involved
Unnamed
Status
Complete
Fox Wolf Watershed Alliance: Winnebago Lakes Comprehensive Planning - Lake Poygan: The Fox \2013 Wolf Watershed Alliance is sponsoring a project to develop a Comprehensive Lake Management Plan (LMP) for Lake Poygan.
Specific project activities include: 1) Develop communication strategy; 2) Create LMP structural framework; 3) Develop committees for each LMP element; 4) Establish issue related focus groups and encourage stakeholder participation; 5) Determine need for third party consultant assistance.
Project final deliverables include: 1) Committees identify outstanding issues, data gaps and possible actions to address lake issues, 2) Committees begin to draft language for LMP sections, 3) Hold 3 Town-hall meetings; 4) Develop website; 5) Issue press releases; 6) If determined necessary, engage third party consultants for project assistance; 7) Develop Phase 4 strategy for completion of LMP.
Special Conditions: 1) All data shall be entered into the SWIMS database; 2) Draft sociological/user surveys and shoreline assessments must be reviewed and approved by the Department before being initiated 3) Documentation of volunteer labor and donated services shall be collected and maintained in accordance with grant program guidelines for reporting in kind donations.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Final reports: it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
2/15/2017
Waters Involved
Unnamed
Status
Complete
Fox Wolf Watershed Alliance: Winnebago Lakes Comprehensive Planning - Lake Winneconne: The Fox \2013 Wolf Watershed Alliance is sponsoring a project to develop a Comprehensive Lake Management Plan (LMP) for Lake Winneconne.
Specific project activities include: 1) Develop communication strategy; 2) Create LMP structural framework; 3) Develop committees for each LMP element; 4) Establish issue related focus groups and encourage stakeholder participation; 5) Determine need for third party consultant assistance.
Project final deliverables include: 1) Committees identify outstanding issues, data gaps and possible actions to address lake issues, 2) Committees begin to draft language for LMP sections, 3) Hold 3 Town-hall meetings; 4) Develop website; 5) Issue press releases; 6) If determined necessary, engage third party consultants for project assistance; 7) Develop Phase 4 strategy for completion of LMP.
Special Conditions: 1) All data shall be entered into the SWIMS database; 2) Draft sociological/user surveys and shoreline assessments must be reviewed and approved by the Department before being initiated 3) Documentation of volunteer labor and donated services shall be collected and maintained in accordance with grant program guidelines for reporting in kind donations.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Final reports: it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
2/15/2017
Waters Involved
Willow Creek
Status
Complete
Fox Wolf Watershed Alliance: Winnebago Lakes Comprehensive Planning - Lake Poygan: The Fox \2013 Wolf Watershed Alliance is sponsoring a project to develop a Comprehensive Lake Management Plan (LMP) for Lake Poygan.
Specific project activities include: 1) Develop communication strategy; 2) Create LMP structural framework; 3) Develop committees for each LMP element; 4) Establish issue related focus groups and encourage stakeholder participation; 5) Determine need for third party consultant assistance.
Project final deliverables include: 1) Committees identify outstanding issues, data gaps and possible actions to address lake issues, 2) Committees begin to draft language for LMP sections, 3) Hold 3 Town-hall meetings; 4) Develop website; 5) Issue press releases; 6) If determined necessary, engage third party consultants for project assistance; 7) Develop Phase 4 strategy for completion of LMP.
Special Conditions: 1) All data shall be entered into the SWIMS database; 2) Draft sociological/user surveys and shoreline assessments must be reviewed and approved by the Department before being initiated 3) Documentation of volunteer labor and donated services shall be collected and maintained in accordance with grant program guidelines for reporting in kind donations.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Final reports: it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
4/1/2005
Waters Involved
Wilson Lake
Status
Complete
Kusel, Wilson, & Round Lakes P & R District: Wilson Lake Water Quality Appraisal: The Kusel, Wilson, Round Lakes P&R District proposes to conduct a water quality appraisal on Wilson Lake. This appraisal will include the development of a hydrologic budget, trophic appraisal with modelling, and lake nutrient budget model, watershed assessment. A comprehensive report will be written based on the objectives of this project. See project description submitted with application materials.
Grant Details
Large Scale Lake Planning
Date
10/1/1996
Waters Involved
Wolf River
Status
Complete
Wolf River Preservation Association: Wolf River Watershed Management Planning - Phase 2: The Wolf River Preservation Association proposes to continue watershed management planning activities. Phase 2 project activities include continuing water quality monitoring, conducting a recreational use survey, continuing to assess erosional areas, continuing to identify exotic species, and preparation of a report summarizing the data collected and analyses performed. The sponsor will provide the Department of Natural Resources with both a paper copy and an electronic copy of the report. Information about the results of phase 2 activities will be disseminated to the public by newsletter, fact sheet, public meeting, and local newspaper article.
Grant Details
Large Scale Lake Planning
Date
2/15/2017
Waters Involved
Wolf River
Status
Complete
Fox Wolf Watershed Alliance: Winnebago Lakes Comprehensive Planning - Lake Poygan: The Fox \2013 Wolf Watershed Alliance is sponsoring a project to develop a Comprehensive Lake Management Plan (LMP) for Lake Poygan.
Specific project activities include: 1) Develop communication strategy; 2) Create LMP structural framework; 3) Develop committees for each LMP element; 4) Establish issue related focus groups and encourage stakeholder participation; 5) Determine need for third party consultant assistance.
Project final deliverables include: 1) Committees identify outstanding issues, data gaps and possible actions to address lake issues, 2) Committees begin to draft language for LMP sections, 3) Hold 3 Town-hall meetings; 4) Develop website; 5) Issue press releases; 6) If determined necessary, engage third party consultants for project assistance; 7) Develop Phase 4 strategy for completion of LMP.
Special Conditions: 1) All data shall be entered into the SWIMS database; 2) Draft sociological/user surveys and shoreline assessments must be reviewed and approved by the Department before being initiated 3) Documentation of volunteer labor and donated services shall be collected and maintained in accordance with grant program guidelines for reporting in kind donations.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Final reports: it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
2/15/2017
Waters Involved
Wolf River
Status
Complete
Fox Wolf Watershed Alliance: Winnebago Lakes Comprehensive Planning - Lake Winneconne: The Fox \2013 Wolf Watershed Alliance is sponsoring a project to develop a Comprehensive Lake Management Plan (LMP) for Lake Winneconne.
Specific project activities include: 1) Develop communication strategy; 2) Create LMP structural framework; 3) Develop committees for each LMP element; 4) Establish issue related focus groups and encourage stakeholder participation; 5) Determine need for third party consultant assistance.
Project final deliverables include: 1) Committees identify outstanding issues, data gaps and possible actions to address lake issues, 2) Committees begin to draft language for LMP sections, 3) Hold 3 Town-hall meetings; 4) Develop website; 5) Issue press releases; 6) If determined necessary, engage third party consultants for project assistance; 7) Develop Phase 4 strategy for completion of LMP.
Special Conditions: 1) All data shall be entered into the SWIMS database; 2) Draft sociological/user surveys and shoreline assessments must be reviewed and approved by the Department before being initiated 3) Documentation of volunteer labor and donated services shall be collected and maintained in accordance with grant program guidelines for reporting in kind donations.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Final reports: it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
2/15/2018
Waters Involved
Wolf River
Status
Complete
Fox Wolf Watershed Alliance: Winnebago Lakes Comprehensive Planning, Poygan Phase 4: The Fox \2013 Wolf Watershed Alliance is sponsoring a project to develop a Comprehensive Lake Management Plan (LMP) for Lake Poygan.
Specific project activities / deliverables include: 1) Develop & implement multiple communication strategies; 2) improve project awareness through community engagement events, 3) Improve information and education outreach through activities / presentations designed to meet specific stakeholder needs, 4) create & engage focus groups to prioritize management recommendations, 5) conduct citizen survey of 1,000 shoreline property owners, conduct aquatic plant PI survey of entire lake system, 6) identify & prioritize a list of habitat improvement projects, 7) complete comprehensive management / APM / AIS Strategic plan and obtain DNR approval and 8) conduct Plan Adoption Outreach, Engagement, and Communication activities to ensure LMP implementation.
Special Conditions: 1) All data shall be entered into the SWIMS database; 2) Draft sociological/user surveys and shoreline assessments must be reviewed and approved by the Department before being initiated
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Final reports: it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
2/15/2018
Waters Involved
Wolf River
Status
Complete
Fox Wolf Watershed Alliance: Winnebago Lakes Comprehensive Planning, Winneconne Phase 4: The Fox \2013 Wolf Watershed Alliance is sponsoring a project to develop a Comprehensive Lake Management Plan (LMP) for Lake Winneconne.
Specific project activities / deliverables include: 1) Develop & implement multiple communication strategies; 2) improve project awareness through community engagement events, 3) Improve information and education outreach through activities / presentations designed to meet specific stakeholder needs, 4) create & engage focus groups to prioritize management recommendations, 5) conduct citizen survey of 1,000 shoreline property owners, conduct aquatic plant PI survey of entire lake system, 6) identify & prioritize a list of habitat improvement projects, 7) complete comprehensive management / APM / AIS Strategic plan and obtain DNR approval and 8) conduct Plan Adoption Outreach, Engagement, and Communication activities to ensure LMP implementation.
Special Conditions: 1) All data shall be entered into the SWIMS database; 2) Draft sociological/user surveys and shoreline assessments must be reviewed and approved by the Department before being initiated
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Final reports: it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Small Scale Lake Planning
Date
10/1/2007
Waters Involved
Alder Creek
Status
Complete
Winnebago Lakes Council, Inc.: Winnebago Pool Lakes Outreach And Forum Development: The Winnebago Lakes Counsil proposes to hire an organization coordinator to support the following:
1. Newsletter development
2. Website development and maintenance
3. Issue summaries
4. Mining community information realative to board and membership development
5. Event planning, lake forums
Grant Details
Small Scale Lake Planning
Date
10/1/2007
Waters Involved
Arrowhead River
Status
Complete
Winnebago Lakes Council, Inc.: Winnebago Pool Lakes Outreach And Forum Development: The Winnebago Lakes Counsil proposes to hire an organization coordinator to support the following:
1. Newsletter development
2. Website development and maintenance
3. Issue summaries
4. Mining community information realative to board and membership development
5. Event planning, lake forums
Grant Details
Small Scale Lake Planning
Date
5/28/2001
Waters Involved
Bughs Lake
Status
Complete
Bughs Lake Property Owners Assn: Bughs Lake Aquatic Plant Management Study: Bughs Lake Property Owners' Association proposes to conduct an aquatic plant survey and collect water quality data on Bughs Lake in the summer of 2001. The whole lake aquatic plant survey and water chemistry analysis results will be used to document changes in the aquatic plant community and water quality in response to the whole lake Sonar (fluridone) treatment and to evaluate the effectiveness of this treatment in controlling Eurasian watermilfoil. The DNR will be provided with both a paper copy and electronic copy of the survey results. The survey results will also be disseminated to all lake residents via the Bughs Lake Property Owners' Association newsletter.
Grant Details
Small Scale Lake Planning
Date
4/1/2002
Waters Involved
Bughs Lake
Status
Complete
Bughs Lake Property Owners Assn: Bughs Lake 2002 Aquatic Plant Study: Bughs Lake Property Owners' Association proposes to conduct an aquatic plant survey and collect water quality data on Bughs Lake in the summer of 2002. The whole lake aquatic plant survey and water chemistry analysis results will be used to document changes in the aquatic plant community and water quality in response to the whole lake Sonar (fluridone) treatment and to evaluate the effectiveness of this treatment and the proposed 2002 2,4-D treatment in controlling Eurasian watermilfoil. The distribution of any Eurasian watermilfoil will be mapped. The Department of Natural Resources will be provided with both a paper copy and electronic copy of the annual report. The annual report will also be disseminated to all lake residents via the Bughs Lake Property Owners' Association newsletter.
Grant Details
Small Scale Lake Planning
Date
4/1/2001
Waters Involved
Gilbert Lake
Status
Complete
Gilbert Lake Advancment Association Inc: Gilbert Lake Aquatic Plant Management Study: The Gilbert Lake Advancement Association, Inc., proposes to conduct an aquatic plant survey on Gilbert Lake in 2001. The whole lake aquatic plant survey results will be used to document changes in the aquatic plant community in response to herbicide treatments and to evaluate effectiveness of these treatments in controlling Eurasian watermilfoil. The DNR will be provided with both a paper copy and electronic copy of the survey results. The survey results will also be disseminated to all lake residents and other supporting organizations via whater method the Association chooses.
Grant Details
Small Scale Lake Planning
Date
4/1/2002
Waters Involved
Gilbert Lake
Status
Complete
Gilbert Lake Advancment Association Inc: Gilbert Lake 2002 Aquatic Plant Survey: Gilbert Lake Advancement Association, Inc. proposes to conduct an aquatic plant survey on Gilbert Lake in 2002. The whole lake aquatic plant survey results will be used to document changes in the aquatic plant community in response to herbicide treatments and to evaluate effectiveness of these treatments in controlling Eurasian watermilfoil.
The Department of Natural Resources will be provided with both a paper copy and electronic copy of the survey results. The annual report will communicate the results of the survey to Lake Association members and other supporting organizations and will recommend any changes to their aquatic plant management plan that are indicated by the survey findings.
Grant Details
Small Scale Lake Planning
Date
4/1/2003
Waters Involved
Gilbert Lake
Status
Complete
Gilbert Lake Advancment Association Inc: Gilbert Lake Apm Study: The Gilbert Lake Advancement Association proposes to evaluate milfoil control and survey aquatic plants with emphasis on management relative to Eurasion watermilfoil. The survey will conform to line transect protocol as accepted by and used by the DNR and include mapping of EWM .
A secondary objective will be to develop a report evaluating, analyzing and summarizing the data collected within the lakes self-help program.
A final report will be submitted to the DNR, both hard copy and electronic form. See grant application and lake coordinator for further requirements.
Grant Details
Small Scale Lake Planning
Date
2/15/2020
Waters Involved
Gilbert Lake
Status
Complete
Gilbert Lake Advancment Association Inc: Lake Management Planning Study: The Gilbert Lake Advancement Association, Inc. is sponsoring an SPL grant project to conduct aquatic plant sampling studies in preparation of completing a lake management plan update in 2021.
Specific project activities include: 1) Conduct a point intercept aquatic plant survey; 2) conduct a Eurasian watermilfoil mapping survey; 3) analyze plant data and compare all available information.
Project final deliverables include: 1) All data collected, and any reports.
Specific conditions: 1) Data and reports provided in an electronic format; 2) This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein; Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist. 3) It is recommended that Grantee provide DNR Lake Coordinator with a draft of the final report for comment on report adequacy prior to making final payment to the consultant. 4) Grantee shall submit electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Small Scale Lake Planning
Date
10/1/2007
Waters Involved
Kusel Lake
Status
Complete
Kusel, Wilson, & Round Lakes P & R District: Wilson Lake Apm Planning Project: Kusel, Wilson and Round Lakes Protection & Rehabilitation District proposes to conduct a Aquatic Plant Management Plan to include the following:
1. Review of historical and current plant data
2. Development of updated APM Plan, and
3. Integration of a public involvement process.
Grant Details
Small Scale Lake Planning
Date
10/1/2002
Waters Involved
Lake Morris
Status
Complete
Mt. Morris Lakes Management District: Mt. Morris Lake Planning Study: Mount Morris Lakes Management District proposes to begin development of a comprehensive lake management plan for Mount Morris Lakes. This project will consist of a collection and compilation of existing data gathered from Mount Morris Lakes and their watersheds, education and property owners participation, residents survey, design and implementation of a strategic mechanical aquatic plant harvesting program, and preparation for expanded studies. A final report summarizing project results will be provided to the Department of Natural Resources in both a paper copy and an electronic copy.
Grant Details
Small Scale Lake Planning
Date
4/1/2003
Waters Involved
Lake Napowan
Status
Complete
Lake Napowan Improvement Assn: Lake Napowan Apm Study: The Lake Napowan Improvement Association proposes to conduct a comprehensive Aquatic Plant Management Plan, and secondly to sample water quality, once, during the summer, to begin a characterization of trophic condition. This Aquatic Plant Management Plan will include the following: Watershed overview; overview discussion of plant ecology; lake specific overview of practical techniques for plant managaement; issue, problems, and challenges; goals and objectives; strategy; plant mapping; information and education; plant surveys;and a contingency plan.
A final report will be provided both in hard copy form and electronic form. Refer to grant application and lake coordinator for further requirements.
Grant Details
Small Scale Lake Planning
Date
10/1/2010
Waters Involved
Lake Poygan
Status
In_Progress
Winnebago Lakes Council, Inc.: Winnebago Watershed Conservation Education Project: The Winnebago Lakes Council proposes to conduct a lake planning project to develop a natural resources photo media data base/portfolio to be utilized at several media levels including web publishing and paper media in the interest of promoting sound lake management of the Winnebago system. The deliverable will be a summary report including project actions, products and evaluation of media deployment efficacy. The Department shall receive both paper and electronic PDF copies of the final report along with, or prior to submission of the grantee's final payment request.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Lake Poygan
Status
In_Progress
Winnebago Lakes Council, Inc.: Winnebago System Water Level Monitoring Network Evaluation: The Winnebago Lakes Council will evaluate the efficacy (relative to existing needs) and sufficiency(relative to future needs) of WLF monitoring network on the Winnebago system lakes. They will construct a plan to address the existing and future needs of the WLF network. Lakes included are Winnebago, Poygan, Winneconne, and Butte de Morts in the counties of Winnebago, Calumet, Waushara, and Fond du Lac. The methods and actions employed: appraise all WLF monitoring sites, conduct station inventory, physical visits, data output handling, volunteer aspects, hardware/software descriptions. Integrate with USACE.
Grant Details
Small Scale Lake Planning
Date
10/1/2010
Waters Involved
Lake Winneconne
Status
In_Progress
Winnebago Lakes Council, Inc.: Winnebago Watershed Conservation Education Project: The Winnebago Lakes Council proposes to conduct a lake planning project to develop a natural resources photo media data base/portfolio to be utilized at several media levels including web publishing and paper media in the interest of promoting sound lake management of the Winnebago system. The deliverable will be a summary report including project actions, products and evaluation of media deployment efficacy. The Department shall receive both paper and electronic PDF copies of the final report along with, or prior to submission of the grantee's final payment request.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Lake Winneconne
Status
In_Progress
Winnebago Lakes Council, Inc.: Winnebago System Water Level Monitoring Network Evaluation: The Winnebago Lakes Council will evaluate the efficacy (relative to existing needs) and sufficiency(relative to future needs) of WLF monitoring network on the Winnebago system lakes. They will construct a plan to address the existing and future needs of the WLF network. Lakes included are Winnebago, Poygan, Winneconne, and Butte de Morts in the counties of Winnebago, Calumet, Waushara, and Fond du Lac. The methods and actions employed: appraise all WLF monitoring sites, conduct station inventory, physical visits, data output handling, volunteer aspects, hardware/software descriptions. Integrate with USACE.
Grant Details
Small Scale Lake Planning
Date
4/1/2004
Waters Involved
Long Lake
Status
Complete
Long Lake Association: Long Lake Apm Plan: The Long Lake Association proposes to conduct an aquatic plant management project to include:
? Conducting a submergent plant appraisal via line transect methodology.
? Conduct an emergent plant appraisal via line transect method
? Evaluation of fish habitat
? A review of potential water quality improvement strategies
? Preparation of a final report w/ recommendations
Note: specific actions identified in original grant proposal
Grant Details
Small Scale Lake Planning
Date
10/1/2007
Waters Involved
Round Lake
Status
Complete
Kusel, Wilson, & Round Lakes P & R District: Wilson Lake Apm Planning Project: Kusel, Wilson and Round Lakes Protection & Rehabilitation District proposes to conduct a Aquatic Plant Management Plan to include the following:
1. Review of historical and current plant data
2. Development of updated APM Plan, and
3. Integration of a public involvement process.
Grant Details
Small Scale Lake Planning
Date
4/1/2007
Waters Involved
Silver Lake
Status
Complete
Silver Lake Management District: Silver Lake Do Meter Purchase: The Silver Lake Management District proposes to purchase and deploy an Oxygen Meter for use on their lake. Deliverables include the acquisition and utilization of a D.O. Meter while following quality assurance and maintenance guidelines as set by manufacturer and report. This scope is intended as a summary; the more specific scope is provided in the grant application and does not supersede the specific scope elements described with in the application.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Wilson Lake
Status
Complete
Kusel, Wilson, & Round Lakes R & P District: Wilson Lake Plant And Water Quality Survey: The Kusel, Wilson and Round Inland Lakes Protection and Rehab District proposes to conduct a plant and water quality survey on Wilson Lake. The project includes monitoring impacts to water quality and plant community in response to recent management efforts; facilitate, inform and direct future management efforts; and complete and update the lake's management plan. Deliverales include aquatic plant survey, Eurasian watermilfoil mapping, water quality monitoring, meetings and reports.
Grant Details
Small Scale Lake Planning
Date
4/1/2002
Waters Involved
Wilson Lake
Status
Complete
Kusel, Wilson, & Round Lakes R & P District: Wilson Lake 2002 Aquatic Plan Survey: Kusel, Wilson, Round Lakes Protection and Rehabilitation District proposes to conduct an aquatic plant survey and collect water quality data on Wilson Lake in 2002. The whole lake aquatic plant survey results will be used to document changes in the aquatic plant community in response to herbicide treatments and to evaluate effectiveness of these treatments in controlling Eurasian watermilfoil.
The Department of Natural Resources will be provided with both a paper copy and electronic copy of the survey results. The annual report will communicate the results of the survey to Lake Association members and other supporting organizations and will recommend any changes to their aquatic plant management plan that are indicated by the survey findings.
Grant Details
Small Scale Lake Planning
Date
10/1/2007
Waters Involved
Wilson Lake
Status
Complete
Kusel, Wilson, & Round Lakes P & R District: Wilson Lake Apm Planning Project: Kusel, Wilson and Round Lakes Protection & Rehabilitation District proposes to conduct a Aquatic Plant Management Plan to include the following:
1. Review of historical and current plant data
2. Development of updated APM Plan, and
3. Integration of a public involvement process.
Grant Details
Targeted Runoff - Rural Construction
Date
1/1/2003
Waters Involved
Lake Poygan
Status
Complete
Winnebago County: Lone Willow Island Marsh Project: to cost-share @70% construction of shoreline protection practices within the Lone Willow Island project area