Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Barnes Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Bass Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Birch Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Blue Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Bony Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Breakfast Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Cole Creek
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Connor Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
4/1/2009
Waters Involved
Cranberry Creek
Status
Complete
Minong Flowage Association: Minong Flowage Ewm Control Project, 2009-2011: Minong Flowage Association is sponsoring a 3-year project to implement approved activities from the Minong Flowage Aquatic Plant Management Plan. Approved activities include chemical treatment and manual removal of Eurasian watermilfoil; herbicide residual monitoring; annual pre- and post-treatment aquatic plant surveys; EWM weevil, curlyleaf pondweed, and wild rice monitoring/mapping; temp/DO meter purchase and water quality testing; implementation of a watercraft inspection program; public meetings and outreach; and annual reporting. Note: this project was not funded in whole and may need to apply for future grants to achieve the activities and deliverables described in this scope.
Deliverables include GIS maps of areas monitored; aquatic plant survey results (spreadsheets and narrative summary); watercraft inspection data collection and entry in SWIMS database; information and education products; and Aquatic Plant Management Plan updates, as necessary. This information will be provided in an annual progress report and treatment plan for the next year and a final project report.
Special Conditions: All monitoring and management should follow approved recommendations within the Minong Flowage Aquatic Plant Management Plan, WDNR's Aquatic Plant Management in Wisconsin guidance, and/or Citiizen Lake Monitoring Network protocols, as specified by the Department.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2009
Waters Involved
Cranberry Creek
Status
Complete
Minong Flowage Association: Minong Flowage 2010-2012 Ewm Education, Management, Assessment & Control Project: Minong Flowage Association is sponsoring a 3-year project to implement approved activities from the Minong Flowage Aquatic Plant Management Plan. Approved activities include chemical treatment and manual removal of Eurasian watermilfoil; herbicide residual monitoring; annual pre- and post-treatment aquatic plant surveys; EWM weevil, curlyleaf pondweed, and wild rice monitoring/mapping; temp/DO meter purchase and expanded water quality testing; implementation of a watercraft inspection program; public meetings and outreach; and annual reporting.
Deliverables include GIS maps of areas monitored; aquatic plant survey results (spreadsheets and narrative summary); watercraft inspection data collection and entry in SWIMS database; information and education products; and Aquatic Plant Management Plan updates, as necessary. This information will be provided in an annual progress report with pre- and post-treatment monitoring results and treatment plan for the next year, as well as a final project report.
Special Conditions: All monitoring and management should follow approved recommendations within the Minong Flowage Aquatic Plant Management Plan, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citiizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
4/15/2015
Waters Involved
Cranberry Creek
Status
Complete
Minong Flowage Association: 2018-2019 Drawdown To Control Ewm In The Minong Flowage: Minong Flowage Association is sponsoring a project to implement their approved aquatic plant management activities. Activities include: aquatic plant surveys, public/partner participation and planning, and reporting.
Final deliverables include: summaries and reports of each grant activity, as described in the application; submission of collected data, evaluation, and results; and examples of education and outreach materials.
This scope does not supersede or negate activities described in the grant application and proposal
Grant Details
Aquatic Invasives Control
Date
4/15/2016
Waters Involved
Cranberry Creek
Status
Complete
Cranberry Lake/Flowage Association: Cranberry Lake Douglas County Ais Control, 2016-2017: Cranberry Lake Flowage Association is implementing approved activities in their 2012 Aquatic Plant Management Plan.
Activities include: EWM herbicide control and manual removal; watercraft inspection; volunteer monitoring; education/outreach; and updating their management plan.
Final deliverables include: an updated aquatic plant management plan; submission of collected data, evaluation, and results; and examples of education and outreach materials, including the newsletter.
This scope does not supersede or negate activities described in the grant application and proposal.
Grant Details
Aquatic Invasives Control
Date
4/15/2016
Waters Involved
Cranberry Creek
Status
Complete
Minong Flowage Association: Minong Flowage 2016-2017 Ewm Management Support Project: Minong Flowage Association is implementing their recently-approved 2016-2020 Aquatic Plant Management Plan.
Project activities include: EWM control in DNR Boat Landing Bay; aquatic plant, including pre/post herbicide treatment and curlyleaf pondweed, purple loosestrife, and wild rice, monitoring; shoreland and woody habitat inventory; partnering with Swift Nature Camp on biological EWM control; substantial volunteer monitoring, education and outreach; and annual stakeholder meeting, survey, and management planning.
Final deliverables include: summaries and reports of each grant activity, as described in the application, and submission of collected data, evaluation, and results, examples of education and outreach materials.
This scope does not supersede or negate activities described in the grant application and proposal.
Grant Details
Aquatic Invasives Control
Date
3/15/2021
Waters Involved
Cranberry Creek
Status
Complete
Minong Flowage Association: 2021-23 Minong Flowage Winter Drawdown Project: Project Scope and Description of Deliverables
Minong Flowage Association is partnering with Washburn County, Renewable World Energies and other partners to complete a winter drawdown of the Minong Flowage to control over 110 acres of EWM. Planning, plant survey work, and water quality testing are all part of the project.
Project final deliverables include:
Final reports summarizing all data collected, management plan updates, drawdown implementation plan, uploaded monitoring data, and GIS map files.
Specific project activities include:
1)Drawdown implementation plan 2) Aquatic plant management plan 3) Creation of newsletters for distribution to outside entities and constituents 4) Aquatic invasive species decontamination stations and materials 5) CBCW based activities 6) PI/Aquatic plant surveys 7) CLMN monitoring 8) Protection and restoration of islands and shorelines within the Minong Flowage.
Special Conditions:
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by regional staff.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Cranberry Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
4/15/2016
Waters Involved
Cranberry Lake
Status
Complete
Cranberry Lake/Flowage Association: Cranberry Lake Douglas County Ais Control, 2016-2017: Cranberry Lake Flowage Association is implementing approved activities in their 2012 Aquatic Plant Management Plan.
Activities include: EWM herbicide control and manual removal; watercraft inspection; volunteer monitoring; education/outreach; and updating their management plan.
Final deliverables include: an updated aquatic plant management plan; submission of collected data, evaluation, and results; and examples of education and outreach materials, including the newsletter.
This scope does not supersede or negate activities described in the grant application and proposal.
Grant Details
Aquatic Invasives Control
Date
3/15/2021
Waters Involved
Cranberry Lake
Status
Complete
Minong Flowage Association: 2021-23 Minong Flowage Winter Drawdown Project: Project Scope and Description of Deliverables
Minong Flowage Association is partnering with Washburn County, Renewable World Energies and other partners to complete a winter drawdown of the Minong Flowage to control over 110 acres of EWM. Planning, plant survey work, and water quality testing are all part of the project.
Project final deliverables include:
Final reports summarizing all data collected, management plan updates, drawdown implementation plan, uploaded monitoring data, and GIS map files.
Specific project activities include:
1)Drawdown implementation plan 2) Aquatic plant management plan 3) Creation of newsletters for distribution to outside entities and constituents 4) Aquatic invasive species decontamination stations and materials 5) CBCW based activities 6) PI/Aquatic plant surveys 7) CLMN monitoring 8) Protection and restoration of islands and shorelines within the Minong Flowage.
Special Conditions:
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by regional staff.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Devils Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Ducetts Lakes
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
East Eightmile Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Eau Claire River
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Ellison Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
George Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2012
Waters Involved
Gilmore Lake
Status
Complete
Gilmore Lake Association: Gilmore Lake Ais Established Population Control Project: Gilmore Lake Association is sponsoring a five-year Eurasian watermilfoil control project that will monitor and manage a pioneering population of Eurasian watermilfoil and inform and educate the local community.
Project activities include: 1) Monthly meandering aquatic plant surveys during the growing season of each year; 2) Seasonal and/or pre- and post-treatment aquatic plant monitoring following guidelines provided by the Department; 3) Chemical treatment and/or SCUBA and manual removal of Eurasian watermilfoil; 4) A whole-lake point-intercept survey in 2015; 5) An updated Aquatic Plant Management Plan in 2017; 6) Information and education program.
Special condition: WDNR\2019s Aquatic Plant Management in Wisconsin guidance should be followed for point-intercept survey monitoring, pre/post treatment monitoring, and aquatic plant management plan development unless otherwise approved by the Department.
Project deliverables include: annual progress and final reports of monitoring and management activities, including aquatic plant survey spreadsheets and pre/post treatment monitoring, and any educational materials developed, and an updated Aquatic Plant Management Plan.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, reports, and education materials, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional lake coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Hay Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Henderson Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Hills Mill Creek
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Idlewild Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Island Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Kelly Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Little Island Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Lower Eau Claire Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Middle Eau Claire Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Mimi Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
4/1/2009
Waters Involved
Minong Flowage
Status
Complete
Minong Flowage Association: Minong Flowage Ewm Control Project, 2009-2011: Minong Flowage Association is sponsoring a 3-year project to implement approved activities from the Minong Flowage Aquatic Plant Management Plan. Approved activities include chemical treatment and manual removal of Eurasian watermilfoil; herbicide residual monitoring; annual pre- and post-treatment aquatic plant surveys; EWM weevil, curlyleaf pondweed, and wild rice monitoring/mapping; temp/DO meter purchase and water quality testing; implementation of a watercraft inspection program; public meetings and outreach; and annual reporting. Note: this project was not funded in whole and may need to apply for future grants to achieve the activities and deliverables described in this scope.
Deliverables include GIS maps of areas monitored; aquatic plant survey results (spreadsheets and narrative summary); watercraft inspection data collection and entry in SWIMS database; information and education products; and Aquatic Plant Management Plan updates, as necessary. This information will be provided in an annual progress report and treatment plan for the next year and a final project report.
Special Conditions: All monitoring and management should follow approved recommendations within the Minong Flowage Aquatic Plant Management Plan, WDNR's Aquatic Plant Management in Wisconsin guidance, and/or Citiizen Lake Monitoring Network protocols, as specified by the Department.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2009
Waters Involved
Minong Flowage
Status
Complete
Minong Flowage Association: Minong Flowage 2010-2012 Ewm Education, Management, Assessment & Control Project: Minong Flowage Association is sponsoring a 3-year project to implement approved activities from the Minong Flowage Aquatic Plant Management Plan. Approved activities include chemical treatment and manual removal of Eurasian watermilfoil; herbicide residual monitoring; annual pre- and post-treatment aquatic plant surveys; EWM weevil, curlyleaf pondweed, and wild rice monitoring/mapping; temp/DO meter purchase and expanded water quality testing; implementation of a watercraft inspection program; public meetings and outreach; and annual reporting.
Deliverables include GIS maps of areas monitored; aquatic plant survey results (spreadsheets and narrative summary); watercraft inspection data collection and entry in SWIMS database; information and education products; and Aquatic Plant Management Plan updates, as necessary. This information will be provided in an annual progress report with pre- and post-treatment monitoring results and treatment plan for the next year, as well as a final project report.
Special Conditions: All monitoring and management should follow approved recommendations within the Minong Flowage Aquatic Plant Management Plan, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citiizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
4/15/2015
Waters Involved
Minong Flowage
Status
Complete
Minong Flowage Association: 2018-2019 Drawdown To Control Ewm In The Minong Flowage: Minong Flowage Association is sponsoring a project to implement their approved aquatic plant management activities. Activities include: aquatic plant surveys, public/partner participation and planning, and reporting.
Final deliverables include: summaries and reports of each grant activity, as described in the application; submission of collected data, evaluation, and results; and examples of education and outreach materials.
This scope does not supersede or negate activities described in the grant application and proposal
Grant Details
Aquatic Invasives Control
Date
4/15/2016
Waters Involved
Minong Flowage
Status
Complete
Minong Flowage Association: Minong Flowage 2016-2017 Ewm Management Support Project: Minong Flowage Association is implementing their recently-approved 2016-2020 Aquatic Plant Management Plan.
Project activities include: EWM control in DNR Boat Landing Bay; aquatic plant, including pre/post herbicide treatment and curlyleaf pondweed, purple loosestrife, and wild rice, monitoring; shoreland and woody habitat inventory; partnering with Swift Nature Camp on biological EWM control; substantial volunteer monitoring, education and outreach; and annual stakeholder meeting, survey, and management planning.
Final deliverables include: summaries and reports of each grant activity, as described in the application, and submission of collected data, evaluation, and results, examples of education and outreach materials.
This scope does not supersede or negate activities described in the grant application and proposal.
Grant Details
Aquatic Invasives Control
Date
3/15/2021
Waters Involved
Minong Flowage
Status
Complete
Minong Flowage Association: 2021-23 Minong Flowage Winter Drawdown Project: Project Scope and Description of Deliverables
Minong Flowage Association is partnering with Washburn County, Renewable World Energies and other partners to complete a winter drawdown of the Minong Flowage to control over 110 acres of EWM. Planning, plant survey work, and water quality testing are all part of the project.
Project final deliverables include:
Final reports summarizing all data collected, management plan updates, drawdown implementation plan, uploaded monitoring data, and GIS map files.
Specific project activities include:
1)Drawdown implementation plan 2) Aquatic plant management plan 3) Creation of newsletters for distribution to outside entities and constituents 4) Aquatic invasive species decontamination stations and materials 5) CBCW based activities 6) PI/Aquatic plant surveys 7) CLMN monitoring 8) Protection and restoration of islands and shorelines within the Minong Flowage.
Special Conditions:
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by regional staff.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Muck Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Mulligan Creek
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Ole Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Otter Creek
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Ounce River
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Pickerel Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Priest Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
3/15/2023
Waters Involved
Red Lake
Status
Complete
Red Lake Association: 2023-24 Update Of The Red Lake Apm Plan And Ewm Management Project: The Red Lake Association is sponsoring a project to conduct whole lake PI Survey, map EWM beds, determine best methods of EWM management, monitor for AIS, public education & awareness, and update the APM Plan
Project final deliverables include:
1. Final Report summarizing accomplishments/progress of the grant including PI results, meandering survey results, EWM maps, removal/treatment determination and planning results, necessary permits, report on AIS removal and/or treatment, CLMN data, outreach activities including photos of signage, agendas and minutes for planning meetings, and mailings.
2. Financial Payment Request with documentation of grant administration time and services, contributions, financial match, proof of payment of expenditures.
3. CLMN readings enter in SWIMS
4. Updated APM Plan for 2023-2028
Specific project activities include:
Project includes PI survey, meandering survey, mapping EWM beds, determine appropriate control method using chemical herbicide and/or physical removal (hand pulling/diver/DASH), obtain necessary permits , expanded water quality monitoring (CLMN), public education & awareness, and updating APM Plan.
Special Conditions: Review effectiveness of various herbicides to determine best usage.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, reports, GIS-based maps, and digital images must be submitted to DNR in a format specified by the regional AIS Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Robinson Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Sand Bar Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Shunenberg Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Smith Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Sweet Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Tars Creek
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Tars Pond
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Tomahawk Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
4/1/2009
Waters Involved
Totagatic River
Status
Complete
Minong Flowage Association: Minong Flowage Ewm Control Project, 2009-2011: Minong Flowage Association is sponsoring a 3-year project to implement approved activities from the Minong Flowage Aquatic Plant Management Plan. Approved activities include chemical treatment and manual removal of Eurasian watermilfoil; herbicide residual monitoring; annual pre- and post-treatment aquatic plant surveys; EWM weevil, curlyleaf pondweed, and wild rice monitoring/mapping; temp/DO meter purchase and water quality testing; implementation of a watercraft inspection program; public meetings and outreach; and annual reporting. Note: this project was not funded in whole and may need to apply for future grants to achieve the activities and deliverables described in this scope.
Deliverables include GIS maps of areas monitored; aquatic plant survey results (spreadsheets and narrative summary); watercraft inspection data collection and entry in SWIMS database; information and education products; and Aquatic Plant Management Plan updates, as necessary. This information will be provided in an annual progress report and treatment plan for the next year and a final project report.
Special Conditions: All monitoring and management should follow approved recommendations within the Minong Flowage Aquatic Plant Management Plan, WDNR's Aquatic Plant Management in Wisconsin guidance, and/or Citiizen Lake Monitoring Network protocols, as specified by the Department.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2009
Waters Involved
Totagatic River
Status
Complete
Minong Flowage Association: Minong Flowage 2010-2012 Ewm Education, Management, Assessment & Control Project: Minong Flowage Association is sponsoring a 3-year project to implement approved activities from the Minong Flowage Aquatic Plant Management Plan. Approved activities include chemical treatment and manual removal of Eurasian watermilfoil; herbicide residual monitoring; annual pre- and post-treatment aquatic plant surveys; EWM weevil, curlyleaf pondweed, and wild rice monitoring/mapping; temp/DO meter purchase and expanded water quality testing; implementation of a watercraft inspection program; public meetings and outreach; and annual reporting.
Deliverables include GIS maps of areas monitored; aquatic plant survey results (spreadsheets and narrative summary); watercraft inspection data collection and entry in SWIMS database; information and education products; and Aquatic Plant Management Plan updates, as necessary. This information will be provided in an annual progress report with pre- and post-treatment monitoring results and treatment plan for the next year, as well as a final project report.
Special Conditions: All monitoring and management should follow approved recommendations within the Minong Flowage Aquatic Plant Management Plan, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citiizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Totagatic River
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
4/15/2015
Waters Involved
Totagatic River
Status
Complete
Minong Flowage Association: 2018-2019 Drawdown To Control Ewm In The Minong Flowage: Minong Flowage Association is sponsoring a project to implement their approved aquatic plant management activities. Activities include: aquatic plant surveys, public/partner participation and planning, and reporting.
Final deliverables include: summaries and reports of each grant activity, as described in the application; submission of collected data, evaluation, and results; and examples of education and outreach materials.
This scope does not supersede or negate activities described in the grant application and proposal
Grant Details
Aquatic Invasives Control
Date
4/15/2016
Waters Involved
Totagatic River
Status
Complete
Minong Flowage Association: Minong Flowage 2016-2017 Ewm Management Support Project: Minong Flowage Association is implementing their recently-approved 2016-2020 Aquatic Plant Management Plan.
Project activities include: EWM control in DNR Boat Landing Bay; aquatic plant, including pre/post herbicide treatment and curlyleaf pondweed, purple loosestrife, and wild rice, monitoring; shoreland and woody habitat inventory; partnering with Swift Nature Camp on biological EWM control; substantial volunteer monitoring, education and outreach; and annual stakeholder meeting, survey, and management planning.
Final deliverables include: summaries and reports of each grant activity, as described in the application, and submission of collected data, evaluation, and results, examples of education and outreach materials.
This scope does not supersede or negate activities described in the grant application and proposal.
Grant Details
Aquatic Invasives Control
Date
3/15/2021
Waters Involved
Totagatic River
Status
Complete
Minong Flowage Association: 2021-23 Minong Flowage Winter Drawdown Project: Project Scope and Description of Deliverables
Minong Flowage Association is partnering with Washburn County, Renewable World Energies and other partners to complete a winter drawdown of the Minong Flowage to control over 110 acres of EWM. Planning, plant survey work, and water quality testing are all part of the project.
Project final deliverables include:
Final reports summarizing all data collected, management plan updates, drawdown implementation plan, uploaded monitoring data, and GIS map files.
Specific project activities include:
1)Drawdown implementation plan 2) Aquatic plant management plan 3) Creation of newsletters for distribution to outside entities and constituents 4) Aquatic invasive species decontamination stations and materials 5) CBCW based activities 6) PI/Aquatic plant surveys 7) CLMN monitoring 8) Protection and restoration of islands and shorelines within the Minong Flowage.
Special Conditions:
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by regional staff.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Turtle Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Twin Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Un Spring
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Unnamed
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
3/15/2021
Waters Involved
Unnamed
Status
Complete
Minong Flowage Association: 2021-23 Minong Flowage Winter Drawdown Project: Project Scope and Description of Deliverables
Minong Flowage Association is partnering with Washburn County, Renewable World Energies and other partners to complete a winter drawdown of the Minong Flowage to control over 110 acres of EWM. Planning, plant survey work, and water quality testing are all part of the project.
Project final deliverables include:
Final reports summarizing all data collected, management plan updates, drawdown implementation plan, uploaded monitoring data, and GIS map files.
Specific project activities include:
1)Drawdown implementation plan 2) Aquatic plant management plan 3) Creation of newsletters for distribution to outside entities and constituents 4) Aquatic invasive species decontamination stations and materials 5) CBCW based activities 6) PI/Aquatic plant surveys 7) CLMN monitoring 8) Protection and restoration of islands and shorelines within the Minong Flowage.
Special Conditions:
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by regional staff.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Upper Eau Claire Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
West Eightmile Lake
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
West Fork Totagatic River
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Williamson Creek
Status
Complete
Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.
Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.
Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.
Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2007
Waters Involved
Cranberry Creek
Status
Complete
Town Of Wascott: Cranberry Lake Ewm Rapid Response: The Town of Wascott in partnership with the Cranberry Lake Association is sponsoring an Aquatic Invasive Species Rapid Response (RR) project. The project will focus on eliminating a pioneering population of Eurasian watermilfoil scattered throughout the lake.
Project activities include:
1) A whole-lake point-intercept survey
2) SCUBA and manual removal of Eurasian watermilfoil and monitoring
3) Possible chemical treatments, under the guidance of WDNR
Project deliverables include:
1) Final report describing the findings of the surveys and treatment tools, GPS locations, and guidance for continued control actions.
Specific conditions for this project:
- Final report needs Dept review and approval
Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Aquatic Invasives Early Detection and Response
Date
6/4/2009
Waters Involved
Cranberry Creek
Status
Complete
Cranberry Lake/Flowage Association: Cranberry Lake/Flowage Eurasian Watermilfoil Rapid Response 2009-2011: Cranberry Lake Association is sponsoring its second Aquatic Invasive Species Rapid Response (RR) project. The 2009-2011 project will monitor and manage a pioneering population of Eurasian watermilfoil scattered throughout the lake.
Project activities include:
1) Seasonal and/or pre- and post-treatment aquatic plant monitoring
2) SCUBA and manual removal of Eurasian watermilfoil
3) Possible chemical treatments, under the guidance of WDNR
4) Completion of an Aquatic Plant Management Plan that follows the WDNR\2019s Aquatic Plant Management in Wisconsin guidance
Project deliverables include:
1) An Aquatic Plant Management Plan
2) Summary report of monitoring and management activities, including aquatic plant survey spreadsheets
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2007
Waters Involved
Cranberry Lake
Status
Complete
Town Of Wascott: Cranberry Lake Ewm Rapid Response: The Town of Wascott in partnership with the Cranberry Lake Association is sponsoring an Aquatic Invasive Species Rapid Response (RR) project. The project will focus on eliminating a pioneering population of Eurasian watermilfoil scattered throughout the lake.
Project activities include:
1) A whole-lake point-intercept survey
2) SCUBA and manual removal of Eurasian watermilfoil and monitoring
3) Possible chemical treatments, under the guidance of WDNR
Project deliverables include:
1) Final report describing the findings of the surveys and treatment tools, GPS locations, and guidance for continued control actions.
Specific conditions for this project:
- Final report needs Dept review and approval
Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.
Grant Details
Aquatic Invasives Early Detection and Response
Date
6/4/2009
Waters Involved
Cranberry Lake
Status
Complete
Cranberry Lake/Flowage Association: Cranberry Lake/Flowage Eurasian Watermilfoil Rapid Response 2009-2011: Cranberry Lake Association is sponsoring its second Aquatic Invasive Species Rapid Response (RR) project. The 2009-2011 project will monitor and manage a pioneering population of Eurasian watermilfoil scattered throughout the lake.
Project activities include:
1) Seasonal and/or pre- and post-treatment aquatic plant monitoring
2) SCUBA and manual removal of Eurasian watermilfoil
3) Possible chemical treatments, under the guidance of WDNR
4) Completion of an Aquatic Plant Management Plan that follows the WDNR\2019s Aquatic Plant Management in Wisconsin guidance
Project deliverables include:
1) An Aquatic Plant Management Plan
2) Summary report of monitoring and management activities, including aquatic plant survey spreadsheets
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Early Detection and Response
Date
8/10/2009
Waters Involved
Gilmore Lake
Status
Complete
Gilmore Lake Association: Gilmore Lake Eurasian Watermilfoil Early Detection & Response Project: Gilmore Lake Association is sponsoring a three-year early detection and response project that will monitor and manage a pioneering population of Eurasian watermilfoil and inform and educate the local community.
Project activities include: 1) Fall 2009 rapid assessment EWM point-intercept survey and summer 2010 whole-lake point-intercept survey of all aquatic plants; 2) Seasonal and/or pre- and post-treatment aquatic plant monitoring following guidelines provided by the Department; 3) Chemical treatment and/or SCUBA and manual removal of Eurasian watermilfoil; 4) Information and education program, including watercraft inspection
Special condition: WDNR\2019s Aquatic Plant Management in Wisconsin guidance should be followed for point-intercept survey monitoring, pre/post treatment monitoring, and aquatic plant management plan development unless otherwise approved by the Department.
Project deliverables include: annual progress and final reports of monitoring and management activities, including aquatic plant survey spreadsheets and pre/post treatment monitoring, and any educational materials developed. Watercraft inspection data should be entered into SWIMS.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, reports, and education materials, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional lake coordinator.
Grant Details
Aquatic Invasives Early Detection and Response
Date
11/19/2019
Waters Involved
Red Lake
Status
Complete
Red Lake Association: 2020-21 Red Lake Ewm Planning And Management Project: Red Lake Association is continuing its Eurasian watermilfoil population response efforts started in fall 2016. Activities include EWM control approved by DNR; pre/post treatment aquatic plant surveys and bed mapping; various information and education activities; and contracted technical assistance, including plan updates.
Deliverables include: GIS maps of areas monitored; aquatic plant survey results (spreadsheets and narrative summary); I & E materials and progress report; and a management/treatment summary and/or plan update.
Special Condition: WDNR\2019s pre/post treatment monitoring guidelines should be followed.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator or Lake Biologist.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Adventure Lake
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Arnold Creek
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Banks Lake
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Barnes Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bass Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Beartrack Lake
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Bergen Creek
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Big Bass Lake
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Big Brook
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Big Brook
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Big Brook
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Big Brook
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Birch Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bird Sanctuary Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Blue Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Bond Lake
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Bond Lake
Status
Complete
Bond Lake Property Owners Association: Bond Lake Ais Education Prevention And Planning: Bond Lake Property Owners Association is contracting an aquatic plant point-intercept survey to better understand their lake. Final deliverables include the PI survey report, maps, and raw data files.
The specific objectives, metrics, and deliverables for the listed activities are included in the application and supporting materials, and this scope is not intended to replace or supersede those documents.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bony Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Breakfast Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Buckety Creek
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Bughouse Lake
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Cable Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Cable Lake
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Cable Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Cable Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Cap Creek
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Cap Creek
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Cap Creek
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Cap Creek
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Carlson Creek
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Cole Creek
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Connor Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Cranberry Creek
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Cranberry Creek
Status
Complete
Minong Flowage Association: Minong Flowage Apm Plan: The Minong Flowage Association Inc. is sponsoring a project to complete an aquatic plant survey and management plan.
Project deliverables include: 1) aquatic plant survey results, 2) An Aquatic Plant Management Plan that integrates watershed, water quality, and fisheries components.
Special Conditions: 1) WDNR's Aquatic Plant Management in Wisconsin guidance should be followed for point-intercept survey monitoring and aquatic plant management plan development, 2) Draft public surveys must be reviewed and approved by the Department before being initiated and public participation must be documented with the plan.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Cranberry Creek
Status
Complete
Gordon/St. Croix Flowage Association: Gordon-St. Croix Flowage Clp/Ewm Ais Education Project: The Gordon-St. Croix Flowage Association is sponsoring an AIS prevention and education project. Project activities include: 1) Clean Boat/Clean Water program on the flowage; 2) Public Outreach and Education about AIS; 3) Aquatic plant survey and mapping; 4) Water quality, level, and flow assessment; 5) AIS control; 6) Wild Rice survey; 7) APM plan.
Deliverables include: 1) Final Report summarizing project accomplishments including watercraft inspections and a lake monitoring report detailing total time and number of people reached; 2) CB/CW survey results; daily results will be entered into the DNR CB/CW database; 3) Report on outreach projects/presentations/lake fairs including copies of press releases, newsletters, and distributed materials; 4) Results of Aquatic Plant Surveys with maps, AIS locations, and results of Aquatic Plant Vouchers; 5) Results of water quality analysis, water level evaluation, and water flow analysis; 6) AIS control activities including diver removal, chemical, and biological control; 7) EWM seed bank analysis; 8) Wild Rice survey; 9) An Aquatic Plant Management Plan; 10) AIS related materials generated or paid for by this grant.
Special project conditions: WDNR\2019s Aquatic Plant Management in Wisconsin guidance must be followed for point-intercept survey monitoring and/or aquatic plant management plan development. The project sponsor shall immediately contact the DNR in the event a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide DNR with a draft final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2014
Waters Involved
Cranberry Creek
Status
Complete
Minong Flowage Association: 2014 Aquatic Plant Monitoring & Ais Education Project: Minong Flowage Association is sponsoring an aquatic plant monitoring and AIS project to prioritize future management/implementation. Approved activities include full point intercept survey, CLP and EWM bed mapping; bathymetric survey; assistance with DNR dye study; AIS education and CLMN monitoring; expanded water quality monitoring and stakeholder meetings with management planning.
Deliverables include GIS maps of areas monitored; aquatic plant survey results (spreadsheets and narrative summary); bathymetric survey results and map; information and education products; and an updated Aquatic Plant Management Plan.
Special Conditions: All monitoring and management should follow approved recommendations within the Minong Flowage Aquatic Plant Management Plan, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citiizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Cranberry Creek
Status
Complete
Minong Flowage Association: 2024 Minong Flowage Ais Management Planning Project: The Minong Flowage Association is sponsoring a project to create a new Aquatic Plant Management (APM) Plan for the Minong Flowage (MF) that will be complete in early 2024. This project completes planning for what is expected to be a large-scale, EWM management action in the MF in 2025.
Activities: 1) Stakeholders Meeting. 2) AIS early detection surveys. 3) EWM mapping and pretreatment PI surveys. 4) Water quality monitoring.
Deliverables: 1) All planning materials including grant actions spreadsheet & assigned responsibilities 2) Including the annual newsletter, agendas & minutes from MFA meetings 3) All watercraft inspection & AIS monitoring data entered into SWIMS 4) CLMN data entered into SWIMS.
Conditions:
1) Do not duplicate CLMN efforts, and include these data in any trends analysis and final reporting.
2) Enter data collected into SWIMS database under the grant project number.
3) Point intercept surveys shall follow Recommended Baseline Monitoring of Aquatic Plants in Wisconsin: Sampling Design, Field and Laboratory Procedures, Data Entry and Analysis, and Applications, publication number PUB-SS-1068. Submit electronic point intercept data to this email address: DNRBaselineAquaticPlants@wisconsin.gov
4) All monitoring shall follow DNR protocols.
This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.
If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Cranberry Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Crotte Creek
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Dawn Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Dawn Lake
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Dawn Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Dawn Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Devils Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Ducetts Lakes
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
East Eightmile Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Eau Claire River
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Eau Claire River Flowage
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Ellison Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Ericson Creek
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Fivemile Creek
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Fivemile Creek
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Fivemile Creek
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Fivemile Creek
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Fivemile Creek
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Flamang Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Flat Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Fondeau Creek
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Fondeau Creek
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Fondeau Creek
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Fondeau Creek
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Fuller Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Fuller Lake
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Fuller Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Fuller Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
George Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Gilmore Lake
Status
Complete
Gilmore Lake Association: Gilmore Lake Education & Monitoring Project: The Gilmore Lake Association is sponsoring an AIS prevention and education project including a Clean Boat/Clean Water inspection program at the public boat landing; education workshop, lake residents education about inspection and AIS prevention; information brochure, mailings, construction of information kiosks at the landings, and monthly aquatic sampling for invasive aquatic plants around Gilmore Lake. Lake association members will be trained and will provide additional training, schedule, and oversee paid and volunteer boat inspectors. Monitors will receive training at a CBCW/AIS workshop.
Deliverables include a comprehensive report including:
1) Documentation of grant administration time and services.
2) Brochures and educational materials.
3) Verification of training of inspectors and monitors such as agendas and attendance lists.
4) Watercraft inspection reports including time and number of people reached. CB/CW survey results completed entry of inspection 3200-120 and monitoring forms into the Dept. website.
5) Report on aquatic plant sampling results including boat and shoreline monitoring observations of any detected aquatic invasive species with appropriate maps.
6) Report on construction of the educational kiosk.
7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application scope and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Gilmore Lake
Status
Complete
Gilmore Lake Association: Gilmore Lake Ais Education And Monitoring Project, Year 2: The Gilmore Lake Association is sponsoring an AIS prevention and education project including a Clean Boat/Clean Water inspection program at the public boat landing; education workshop, lake resident education about inspection and AIS prevention; information brochure, mailings, construction of information kiosks at the landings, and monthly sampling for invasive aquatic plants around Gilmore Lake. Lake Association members will be trained and will provide additional training, schedule, and oversee paid and volunteer boat inspectors. Monitors will receive training at a CBCW/AIS workshop.
Deliverables include a paper and electronic copy of final report summarizing project accomplishments including: 1) Brochures & educational materials; 2) Verification of training of inspectors & monitors such as agendas & attendance lists; 3) Watercraft inspection reports including time & number of people reached. CB/CW survey results completed entry of inspection and monitoring into the Dept. website database. 4) Report on aquatic plant sampling results including boat & shoreline monitoring observations of any detected aquatic invasive species with appropriate maps; 5) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope is summarized the grant application scope and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2009
Waters Involved
Gilmore Lake
Status
Complete
Gilmore Lake Association: Gilmore Lake Ais Education, Monitoring & Planning Project: The Gilmore Lake Association is sponsoring an AIS project including a Clean Boat/Clean Water inspection program at the public boat landing, education workshop, lake resident education, information brochure, mailings, maintenance of information kiosk at the landing, and monthly aquatic sampling for invasive aquatic plants around Gilmore Lake. Association members will be trained and will provide additional training, schedule, and oversee paid and volunteer boat inspectors.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the project including watercraft inspection and lake monitoring report detailing time and number of people reached and a summary of the Early Detection, Rapid Response Plan; 2) Watercraft inspection report including time and number of people reached; CB/CW survey results; daily results will be entered into the DNR CB/CW database; 3) Verification of workshops and/or inspector training such as agendas and attendance lists; 4) Copies of brochures, educational materials, and mailings; 5) Report on aquatic plant sampling results including boat and shoreline monitoring observations of any detected aquatic invasive species with appropriate maps; 6) Update of Early Detection, Rapid Response Plan; 7) Report on construction/maintenance of signage; 8) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Gilmore Lake
Status
Complete
Gilmore Lake Association: Gilmore Lake Ais Education, Monitoring & Planning Project: Gilmore Lake Association is sponsoring an AIS project including a Clean Boat/Clean Water inspection program at the public boat landing, education workshop, lake resident education about inspection and AIS prevention; newsletters, information brochure, maintenance of landing information kiosk, and monthly aquatic sampling for invasive aquatic plants around Gilmore Lake. Lake Association members will be trained and will provide additional training, schedule, and oversee paid and volunteer boat inspectors.
Deliverables include: 1) Final Report summarizing project accomplishments/progress; 2) Watercraft inspection report including time and number of people reached; CB/CW survey results; daily results will be entered into the DNR CB/CW database; 3) Verification of workshops and/or inspector training such as agendas and attendance lists; 4) Copies of brochures, educational materials, and mailings; 5) Report on aquatic plant sampling results including boat and shoreline monitoring observations of any detected aquatic invasive species with maps; 6) Summary and update of Early Detection, Rapid Response Plan; 7) Report on construction/maintenance of signage; 8) AIS related materials generated or paid for by this grant.
Special project conditions: The sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes details provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Gilmore Lake
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
3/15/2023
Waters Involved
Gilmore Lake
Status
Complete
Gilmore Lake Association: Gilmore Lake Aquatic Plant Management Plan: The Gilmore Lake Association is sponsoring a project to study appropriate EWM management and treatment and update their APM plan.
Project final deliverables include:
1. Final Report summarizing accomplishments/progress of the grant including multiple survey results, survey maps, removal/treatment determination and planning results, outreach activities including agendas and minutes for planning meetings, and mailings.
2. Financial Payment Request with documentation of grant administration time and services, contributions, financial match, proof of payment of expenditures, and organizations providing financial support.
3. Updated APM Plan for 2023-2028
4. Additional related items paid by this grant.
Specific project activities include:
Project includes multiple surveys of native plants and EWM beds, determine plant diversity and maps, hold Planning Meetings to compare 2023 surveys to previous surveys to determine appropriate control method using chemical herbicide and/or physical removal (hand pulling/diver/DASH), develop a 2023-2028 APM plan, Final Report.
Special Conditions: APM plan must be submitted for approval by September 15, 2023 before an AIS Control Grant be submitted.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, reports, GIS-based maps, and digital images must be submitted to DNR in a format specified by the regional Lake Biologist.
If consultant provides final report, it is recommended Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Gilmore Lake
Status
Complete
Gilmore Lake Association: Gilmore Lake 2024-2025 Ewm Monitoring And Management Project: The Gilmore Lake Association is sponsoring a project to improve lake user knowledge and skills on managing EWM and AIS, water level and water quality monitoring activities, mapping, surveys, buoys to mark EWM beds, supplies for training sessions, and Clean Boats Clean Water (CBCW) prevention efforts.
Activities: 1) Meandering surveys/bed mapping 2) Implement training program for riparian owners
3) Install EWM buoys
Deliverables: 1) Annual bed mapping 2) Spring, summer, and fall meander surveys 3) Riparian training plan for EWM mitigation 4) Additional related items paid by this grant.
Conditions:
1) Point intercept surveys shall follow Recommended Baseline Monitoring of Aquatic Plants in Wisconsin: Sampling Design, Field and Laboratory Procedures, Data Entry and Analysis, and Applications, publication number PUB-SS-1068. Submit electronic point intercept data to this email address: DNRBaselineAquaticPlants@wisconsin.gov
2) Lake-wide point intercept surveys to be conducted between July 1 and August 31.
3) All monitoring shall follow DNR protocols.
4) Enter data collected into SWIMS database under the grant project number.
5) All outreach and education materials shall use DNR messaging; DNR Biologist review and approval is required before dissemination.
6) Notify DNR AIS Biologist of any new detection of an AIS species.
This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.
If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Hay Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Henderson Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Henry Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Henry Lake
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Henry Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Henry Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Hills Mill Creek
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Horseshoe Lake
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Idlewild Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Island Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Jo Ann Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Jo Ann Lake
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Jo Ann Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Jo Ann Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Kelly Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Lake Nancy
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Lake Owen
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lake Owen
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Lake Owen
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Lake Owen
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Lake Tahkodah
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lake Tahkodah
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Lake Tahkodah
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Lake Tahkodah
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Lerche Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lerche Lake
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Lerche Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Lerche Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Little Bass Lake
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Little Brook
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Little Brook
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Little Brook
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Little Brook
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Island Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Little Rosa Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Little Rosa Lake
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Little Rosa Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Little Rosa Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Little Sand Lake
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Simms Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lord Creek
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lower Eau Claire Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Lower Kimball Lake
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lower Ox Creek
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lower Ox Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lund Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Metzger Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Middle Eau Claire Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Middle Kimball Lake
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Middle Lake
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Miles Lake
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Mimi Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Minong Flowage
Status
Complete
Minong Flowage Association: Minong Flowage Apm Plan: The Minong Flowage Association Inc. is sponsoring a project to complete an aquatic plant survey and management plan.
Project deliverables include: 1) aquatic plant survey results, 2) An Aquatic Plant Management Plan that integrates watershed, water quality, and fisheries components.
Special Conditions: 1) WDNR's Aquatic Plant Management in Wisconsin guidance should be followed for point-intercept survey monitoring and aquatic plant management plan development, 2) Draft public surveys must be reviewed and approved by the Department before being initiated and public participation must be documented with the plan.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Minong Flowage
Status
Complete
Gordon/St. Croix Flowage Association: Gordon-St. Croix Flowage Clp/Ewm Ais Education Project: The Gordon-St. Croix Flowage Association is sponsoring an AIS prevention and education project. Project activities include: 1) Clean Boat/Clean Water program on the flowage; 2) Public Outreach and Education about AIS; 3) Aquatic plant survey and mapping; 4) Water quality, level, and flow assessment; 5) AIS control; 6) Wild Rice survey; 7) APM plan.
Deliverables include: 1) Final Report summarizing project accomplishments including watercraft inspections and a lake monitoring report detailing total time and number of people reached; 2) CB/CW survey results; daily results will be entered into the DNR CB/CW database; 3) Report on outreach projects/presentations/lake fairs including copies of press releases, newsletters, and distributed materials; 4) Results of Aquatic Plant Surveys with maps, AIS locations, and results of Aquatic Plant Vouchers; 5) Results of water quality analysis, water level evaluation, and water flow analysis; 6) AIS control activities including diver removal, chemical, and biological control; 7) EWM seed bank analysis; 8) Wild Rice survey; 9) An Aquatic Plant Management Plan; 10) AIS related materials generated or paid for by this grant.
Special project conditions: WDNR\2019s Aquatic Plant Management in Wisconsin guidance must be followed for point-intercept survey monitoring and/or aquatic plant management plan development. The project sponsor shall immediately contact the DNR in the event a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide DNR with a draft final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Minong Flowage
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2014
Waters Involved
Minong Flowage
Status
Complete
Minong Flowage Association: 2014 Aquatic Plant Monitoring & Ais Education Project: Minong Flowage Association is sponsoring an aquatic plant monitoring and AIS project to prioritize future management/implementation. Approved activities include full point intercept survey, CLP and EWM bed mapping; bathymetric survey; assistance with DNR dye study; AIS education and CLMN monitoring; expanded water quality monitoring and stakeholder meetings with management planning.
Deliverables include GIS maps of areas monitored; aquatic plant survey results (spreadsheets and narrative summary); bathymetric survey results and map; information and education products; and an updated Aquatic Plant Management Plan.
Special Conditions: All monitoring and management should follow approved recommendations within the Minong Flowage Aquatic Plant Management Plan, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citiizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Minong Flowage
Status
Complete
Minong Flowage Association: 2024 Minong Flowage Ais Management Planning Project: The Minong Flowage Association is sponsoring a project to create a new Aquatic Plant Management (APM) Plan for the Minong Flowage (MF) that will be complete in early 2024. This project completes planning for what is expected to be a large-scale, EWM management action in the MF in 2025.
Activities: 1) Stakeholders Meeting. 2) AIS early detection surveys. 3) EWM mapping and pretreatment PI surveys. 4) Water quality monitoring.
Deliverables: 1) All planning materials including grant actions spreadsheet & assigned responsibilities 2) Including the annual newsletter, agendas & minutes from MFA meetings 3) All watercraft inspection & AIS monitoring data entered into SWIMS 4) CLMN data entered into SWIMS.
Conditions:
1) Do not duplicate CLMN efforts, and include these data in any trends analysis and final reporting.
2) Enter data collected into SWIMS database under the grant project number.
3) Point intercept surveys shall follow Recommended Baseline Monitoring of Aquatic Plants in Wisconsin: Sampling Design, Field and Laboratory Procedures, Data Entry and Analysis, and Applications, publication number PUB-SS-1068. Submit electronic point intercept data to this email address: DNRBaselineAquaticPlants@wisconsin.gov
4) All monitoring shall follow DNR protocols.
This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.
If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Moose Branch Flowage
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Moose River
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Mosquito Lake
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Muck Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Mud Creek
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Mud Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Mud Lake
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Mulligan Creek
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Namekagon Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Namekagon Lake
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Namekagon Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Namekagon Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Namekagon River
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Namekagon River
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Namekagon River
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Namekagon River
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2004
Waters Involved
Nelson Lake
Status
Complete
Town Of Lenroot: Invasives Species Program: The Town of Lenroot, in cooperation with the Nelson Lake Association propose a project designed to educate the general public who use Nelson Lake about aquatic invasive species, and to stimulate them to take necessary measures to prevent their entry into Nelson Lake.
The project involves placing an invasive species identification sticker on all minnow bags and buckets and worm containers bought at area bait shops. Activities include at least one informational and educational article will published by the association and placed in the local paper; an association sponsored "veggie day" forum open to lake and non-lake residents to reinforce invasive species identification; placement of waste receptacles at all four public access points. These garbage cans will be decorated with pictures of aquatic invasive species and remind users to check their boats and to discard any plant material in these receptacles.
Specific deliverables for this project include a copy of the I&E article for the local paper and a picture of the waste receptacle. A final report detailing the activities completed as a result of this project should be sent to the DNR in both electronic and paper formats.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Nelson Lake
Status
Complete
Nelson Lake Association: Preventing Invasives: Information Kiosks & Key Chains: Nelson Lake Association in partnership with the Sawyer County Lakes Forum, Sawyer County LWCD, and the Town of Lenroot is sponsoring a project on Nelson Lake and the Totagatic Flowage to install information kiosks at boat landings and create and distribute educational key rings.
Project deliverables include:
1. A project summary, including key chain distribution quantities and recipients and frequency and quantities of materials stocked at kiosks.
2. Photographs, preferably digital, of boat landing signs.
3. An example keychain if different from the one provided with the grant application.
Special Conditions
1. Any new identification of an aquatic invasive species must be immediately reported to the Department.
2. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
A draft report/deliverables will be submitted to the regional Lake Coordinator for review before finalization.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Nelson Lake
Status
Complete
Nelson Lake Association: Nelson Lake Ais Prevention Project: The Nelson Lake Association is sponsoring an AIS prevention & education project including boat inspections at the public landing; invasive species monitoring; a Training Day workshop on boat inspection, aquatic plants, monitoring, & AIS prevention; information kiosk construction at the improved landing; maintaining educational information at existing kiosks; construction of 3 signs on roads to landings; produce & distribute AIS handouts.
Activities include:
1. Boat inspections will be performed on weekends & high traffic days, such as holidays;
2. Invasives monitoring will be conducted two times over the summer;
3. Provide AIS information to the public at the landing kiosks, along roadsides, & general distribution.
Deliverables include a comprehensive report including:
1) Documentation of donated time & services for grant administration. 2) Watercraft inspection report including time & number of people reached; Clean Boats, Clean Water survey results with results entered into the CB/CW database. 3) Aquatic plant sampling results including boat & shoreline monitoring observations of any detected aquatic invasive species & maps. 4) Verification of inspector & monitor training including agendas & attendance lists. 5) Photos of constructed & existing kiosks. 6) Samples of education materials & distribution information. 7) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project described in the grant application and does not supersede the application specifics. Data, records, and reports, must be submitted to the Department in a format specified by the Lake Coordinator. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report. DNR to receive both paper and electronic copies of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Nelson Lake
Status
Complete
Nelson Lake Association: Nelson Lake 2008 Ais Project: Nelson Lake in cooperation Sawyer County (AIS Coordinator) will implement an AIS prevention strategy. The goal is to educate people who use the lake about the problem of AIS and how to prevent the spread and prevent any introductions into Nelson Lake.
Project activities include: continue AIS monitoring program implemented in 2007; recruit & train volunteers on monitoring procedure & AIS identification (training will be made available to anyone interested); produce laminated key chains that will be distributed in the region; expand the 2007 Clean Boat/Clean Water Program.
Project deliverables include: 1) Provide training agenda for volunteer monitoring program; 2) Provide summary of monitoring results; 3)Provide laminated key chains to public; 4) Provide the department a summary of the volunteer AIS monitoring and number of hours/boaters contacted under Clean Boats, Clean Waters Program, Clean Boat Clean Water data will be entered into the state data base.
Specific conditions: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project. Contact UW-Extension staff for information on training, workshops or educational materials for the Clean Boats/Clean Waters (Erin Hennegar, 715-346-4978) Program and AIS Monitoring (Laura Herman, 715-365-8998) Program.
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Nelson Lake
Status
Complete
Nelson Lake Association: Nelson Lake Ais Education Project: Nelson Lake in cooperation Sawyer County (AIS Coordinator) will implement an AIS prevention strategy. The goal is to educate people who use the lake about the problem of AIS and how to prevent the spread and prevent any introductions into Nelson Lake.
Project goals includes: 1) Continue the AIS lake monitoring program that was implemented in 2007; 2) Recruit and train new and replacement volunteers on monitoring procedure and AIS identification. Training will be made available to anyone interested; 3) Produce laminated key chains that will be distributed in the region; 4) Expand the Clean Boat/Clean Water Program that was implemented in 2007; 5) Maintain signage and kiosks that were installed in prior years on the highways and boat landings; 6) Install signs at the exit of the public boat landings to remind boaters to clean their boats, remove plants, and drain all water.
Project deliverables include: 1) Provide training agenda for volunteer monitoring program; 2) Provide summary of monitoring results; 3) Provide laminated key chains to public; 4) Provide the department a summary of the volunteer AIS monitoring and number of hours/boaters contacted under Clean Boats, Clean Waters Program.
Specific project conditions: 1) The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project; 2) Contact UW-Extension staff for information on training, workshops or educational materials for the Clean Boats/Clean Waters (Erin McFarlane, 715-346-4978) Program and AIS Monitoring (Laura Herman, 715-365-8998) Program.
Grant Details
Aquatic Invasives Education
Date
4/1/2012
Waters Involved
Nelson Lake
Status
Complete
Nelson Lake Association: Nelson Lake Ais Education/Prevention Project: Nelson Lake in cooperation Sawyer County (AIS Coordinator) will implement an AIS prevention strategy. The goal is to educate people who use the lake about the problem of AIS and how to prevent the spread and prevent any introductions into Nelson Lake.
Project goals include: 1) Continue the AIS lake monitoring program that was implemented in 2007; 2) Recruit and train new and replacement volunteers on monitoring procedure and AIS identification. Training will be made available to anyone interested; 3) Produce laminated key chains that will be distributed in the region; 4) Expand the Clean Boat/Clean Water Program that was implemented in 2007; 5) Maintain signage and kiosks that were installed in prior years on the highways and boat landings.
Project deliverables include: 1) Provide training agenda for volunteer monitoring program; 2) Provide summary of monitoring results; 3) Provide laminated key chains to public; 4) Provide the department a summary of the volunteer AIS monitoring and number of hours/boaters contacted under Clean Boats, Clean Waters Program.
Specific conditions for this project: 1) The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project; 2) Contact UW-Extension staff for information on training, workshops or educational materials for the Clean Boats/Clean Waters (Erin McFarlane, 715-346-4978) Program and AIS Monitoring (Laura Herman, 715-365-8998) Program.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
No Mans Lake
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
North Twin Lake
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Ole Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Ole Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Ole Lake
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Ole Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Ole Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
One Mile Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Otter Creek
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Ounce River
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Ounce River
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Ounce River
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Ounce River
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Ounce River
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Perry Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Perry Lake
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Perry Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Perry Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Pickerel Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Pokegama Lake
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Porter Lakes
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Porter Lakes
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Porter Lakes
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Porter Lakes
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Price Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Price Lake
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Price Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Price Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Priest Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Rice Lake
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Robinson Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Rosa Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Rosa Lake
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Rosa Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Rosa Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Round Lake
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Saint Croix River
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Sand Bar Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Sand Lake
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Scovils Lake
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Shell Creek
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Sheosh Creek
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Sherman Lake
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Shunenberg Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Simms Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Sleepy Eye Lake
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Smith Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
South Porter Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
South Porter Lake
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
South Porter Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
South Porter Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Spring Creek
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Spring Creek
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Spring Creek
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Spring Creek
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Spring Creek
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Spring Lake
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
St Croix Flowage
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Sweet Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Swenson Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Tars Creek
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Tars Pond
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Tomahawk Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Totagatic Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Totagatic Lake
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Totagatic Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Totagatic Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2004
Waters Involved
Totagatic River
Status
Complete
Town Of Lenroot: Invasives Species Program: The Town of Lenroot, in cooperation with the Nelson Lake Association propose a project designed to educate the general public who use Nelson Lake about aquatic invasive species, and to stimulate them to take necessary measures to prevent their entry into Nelson Lake.
The project involves placing an invasive species identification sticker on all minnow bags and buckets and worm containers bought at area bait shops. Activities include at least one informational and educational article will published by the association and placed in the local paper; an association sponsored "veggie day" forum open to lake and non-lake residents to reinforce invasive species identification; placement of waste receptacles at all four public access points. These garbage cans will be decorated with pictures of aquatic invasive species and remind users to check their boats and to discard any plant material in these receptacles.
Specific deliverables for this project include a copy of the I&E article for the local paper and a picture of the waste receptacle. A final report detailing the activities completed as a result of this project should be sent to the DNR in both electronic and paper formats.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Totagatic River
Status
Complete
Nelson Lake Association: Preventing Invasives: Information Kiosks & Key Chains: Nelson Lake Association in partnership with the Sawyer County Lakes Forum, Sawyer County LWCD, and the Town of Lenroot is sponsoring a project on Nelson Lake and the Totagatic Flowage to install information kiosks at boat landings and create and distribute educational key rings.
Project deliverables include:
1. A project summary, including key chain distribution quantities and recipients and frequency and quantities of materials stocked at kiosks.
2. Photographs, preferably digital, of boat landing signs.
3. An example keychain if different from the one provided with the grant application.
Special Conditions
1. Any new identification of an aquatic invasive species must be immediately reported to the Department.
2. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
A draft report/deliverables will be submitted to the regional Lake Coordinator for review before finalization.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Totagatic River
Status
Complete
Nelson Lake Association: Nelson Lake Ais Prevention Project: The Nelson Lake Association is sponsoring an AIS prevention & education project including boat inspections at the public landing; invasive species monitoring; a Training Day workshop on boat inspection, aquatic plants, monitoring, & AIS prevention; information kiosk construction at the improved landing; maintaining educational information at existing kiosks; construction of 3 signs on roads to landings; produce & distribute AIS handouts.
Activities include:
1. Boat inspections will be performed on weekends & high traffic days, such as holidays;
2. Invasives monitoring will be conducted two times over the summer;
3. Provide AIS information to the public at the landing kiosks, along roadsides, & general distribution.
Deliverables include a comprehensive report including:
1) Documentation of donated time & services for grant administration. 2) Watercraft inspection report including time & number of people reached; Clean Boats, Clean Water survey results with results entered into the CB/CW database. 3) Aquatic plant sampling results including boat & shoreline monitoring observations of any detected aquatic invasive species & maps. 4) Verification of inspector & monitor training including agendas & attendance lists. 5) Photos of constructed & existing kiosks. 6) Samples of education materials & distribution information. 7) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project described in the grant application and does not supersede the application specifics. Data, records, and reports, must be submitted to the Department in a format specified by the Lake Coordinator. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report. DNR to receive both paper and electronic copies of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Totagatic River
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Totagatic River
Status
Complete
Minong Flowage Association: Minong Flowage Apm Plan: The Minong Flowage Association Inc. is sponsoring a project to complete an aquatic plant survey and management plan.
Project deliverables include: 1) aquatic plant survey results, 2) An Aquatic Plant Management Plan that integrates watershed, water quality, and fisheries components.
Special Conditions: 1) WDNR's Aquatic Plant Management in Wisconsin guidance should be followed for point-intercept survey monitoring and aquatic plant management plan development, 2) Draft public surveys must be reviewed and approved by the Department before being initiated and public participation must be documented with the plan.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Totagatic River
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Totagatic River
Status
Complete
Nelson Lake Association: Nelson Lake 2008 Ais Project: Nelson Lake in cooperation Sawyer County (AIS Coordinator) will implement an AIS prevention strategy. The goal is to educate people who use the lake about the problem of AIS and how to prevent the spread and prevent any introductions into Nelson Lake.
Project activities include: continue AIS monitoring program implemented in 2007; recruit & train volunteers on monitoring procedure & AIS identification (training will be made available to anyone interested); produce laminated key chains that will be distributed in the region; expand the 2007 Clean Boat/Clean Water Program.
Project deliverables include: 1) Provide training agenda for volunteer monitoring program; 2) Provide summary of monitoring results; 3)Provide laminated key chains to public; 4) Provide the department a summary of the volunteer AIS monitoring and number of hours/boaters contacted under Clean Boats, Clean Waters Program, Clean Boat Clean Water data will be entered into the state data base.
Specific conditions: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project. Contact UW-Extension staff for information on training, workshops or educational materials for the Clean Boats/Clean Waters (Erin Hennegar, 715-346-4978) Program and AIS Monitoring (Laura Herman, 715-365-8998) Program.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Totagatic River
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Totagatic River
Status
Complete
Gordon/St. Croix Flowage Association: Gordon-St. Croix Flowage Clp/Ewm Ais Education Project: The Gordon-St. Croix Flowage Association is sponsoring an AIS prevention and education project. Project activities include: 1) Clean Boat/Clean Water program on the flowage; 2) Public Outreach and Education about AIS; 3) Aquatic plant survey and mapping; 4) Water quality, level, and flow assessment; 5) AIS control; 6) Wild Rice survey; 7) APM plan.
Deliverables include: 1) Final Report summarizing project accomplishments including watercraft inspections and a lake monitoring report detailing total time and number of people reached; 2) CB/CW survey results; daily results will be entered into the DNR CB/CW database; 3) Report on outreach projects/presentations/lake fairs including copies of press releases, newsletters, and distributed materials; 4) Results of Aquatic Plant Surveys with maps, AIS locations, and results of Aquatic Plant Vouchers; 5) Results of water quality analysis, water level evaluation, and water flow analysis; 6) AIS control activities including diver removal, chemical, and biological control; 7) EWM seed bank analysis; 8) Wild Rice survey; 9) An Aquatic Plant Management Plan; 10) AIS related materials generated or paid for by this grant.
Special project conditions: WDNR\2019s Aquatic Plant Management in Wisconsin guidance must be followed for point-intercept survey monitoring and/or aquatic plant management plan development. The project sponsor shall immediately contact the DNR in the event a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide DNR with a draft final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Totagatic River
Status
Complete
Nelson Lake Association: Nelson Lake Ais Education Project: Nelson Lake in cooperation Sawyer County (AIS Coordinator) will implement an AIS prevention strategy. The goal is to educate people who use the lake about the problem of AIS and how to prevent the spread and prevent any introductions into Nelson Lake.
Project goals includes: 1) Continue the AIS lake monitoring program that was implemented in 2007; 2) Recruit and train new and replacement volunteers on monitoring procedure and AIS identification. Training will be made available to anyone interested; 3) Produce laminated key chains that will be distributed in the region; 4) Expand the Clean Boat/Clean Water Program that was implemented in 2007; 5) Maintain signage and kiosks that were installed in prior years on the highways and boat landings; 6) Install signs at the exit of the public boat landings to remind boaters to clean their boats, remove plants, and drain all water.
Project deliverables include: 1) Provide training agenda for volunteer monitoring program; 2) Provide summary of monitoring results; 3) Provide laminated key chains to public; 4) Provide the department a summary of the volunteer AIS monitoring and number of hours/boaters contacted under Clean Boats, Clean Waters Program.
Specific project conditions: 1) The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project; 2) Contact UW-Extension staff for information on training, workshops or educational materials for the Clean Boats/Clean Waters (Erin McFarlane, 715-346-4978) Program and AIS Monitoring (Laura Herman, 715-365-8998) Program.
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Totagatic River
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Totagatic River
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Totagatic River
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2014
Waters Involved
Totagatic River
Status
Complete
Minong Flowage Association: 2014 Aquatic Plant Monitoring & Ais Education Project: Minong Flowage Association is sponsoring an aquatic plant monitoring and AIS project to prioritize future management/implementation. Approved activities include full point intercept survey, CLP and EWM bed mapping; bathymetric survey; assistance with DNR dye study; AIS education and CLMN monitoring; expanded water quality monitoring and stakeholder meetings with management planning.
Deliverables include GIS maps of areas monitored; aquatic plant survey results (spreadsheets and narrative summary); bathymetric survey results and map; information and education products; and an updated Aquatic Plant Management Plan.
Special Conditions: All monitoring and management should follow approved recommendations within the Minong Flowage Aquatic Plant Management Plan, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citiizen Lake Monitoring Network protocols, as specified by the Department.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Totagatic River
Status
Complete
Minong Flowage Association: 2024 Minong Flowage Ais Management Planning Project: The Minong Flowage Association is sponsoring a project to create a new Aquatic Plant Management (APM) Plan for the Minong Flowage (MF) that will be complete in early 2024. This project completes planning for what is expected to be a large-scale, EWM management action in the MF in 2025.
Activities: 1) Stakeholders Meeting. 2) AIS early detection surveys. 3) EWM mapping and pretreatment PI surveys. 4) Water quality monitoring.
Deliverables: 1) All planning materials including grant actions spreadsheet & assigned responsibilities 2) Including the annual newsletter, agendas & minutes from MFA meetings 3) All watercraft inspection & AIS monitoring data entered into SWIMS 4) CLMN data entered into SWIMS.
Conditions:
1) Do not duplicate CLMN efforts, and include these data in any trends analysis and final reporting.
2) Enter data collected into SWIMS database under the grant project number.
3) Point intercept surveys shall follow Recommended Baseline Monitoring of Aquatic Plants in Wisconsin: Sampling Design, Field and Laboratory Procedures, Data Entry and Analysis, and Applications, publication number PUB-SS-1068. Submit electronic point intercept data to this email address: DNRBaselineAquaticPlants@wisconsin.gov
4) All monitoring shall follow DNR protocols.
This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.
If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Trail Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Trail Lake
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Trail Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Trail Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Tucker Lake
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Turtle Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Twin Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Un Spring
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Un Spring
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Un Spring
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Un Spring
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Un Spring
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Un Spring
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Unnamed
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Unnamed
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Unnamed
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Unnamed
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Unnamed
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Unnamed
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Unnamed
Status
Complete
Bond Lake Property Owners Association: Bond Lake Ais Education Prevention And Planning: Bond Lake Property Owners Association is contracting an aquatic plant point-intercept survey to better understand their lake. Final deliverables include the PI survey report, maps, and raw data files.
The specific objectives, metrics, and deliverables for the listed activities are included in the application and supporting materials, and this scope is not intended to replace or supersede those documents.
Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Unnamed
Status
Complete
Minong Flowage Association: 2024 Minong Flowage Ais Management Planning Project: The Minong Flowage Association is sponsoring a project to create a new Aquatic Plant Management (APM) Plan for the Minong Flowage (MF) that will be complete in early 2024. This project completes planning for what is expected to be a large-scale, EWM management action in the MF in 2025.
Activities: 1) Stakeholders Meeting. 2) AIS early detection surveys. 3) EWM mapping and pretreatment PI surveys. 4) Water quality monitoring.
Deliverables: 1) All planning materials including grant actions spreadsheet & assigned responsibilities 2) Including the annual newsletter, agendas & minutes from MFA meetings 3) All watercraft inspection & AIS monitoring data entered into SWIMS 4) CLMN data entered into SWIMS.
Conditions:
1) Do not duplicate CLMN efforts, and include these data in any trends analysis and final reporting.
2) Enter data collected into SWIMS database under the grant project number.
3) Point intercept surveys shall follow Recommended Baseline Monitoring of Aquatic Plants in Wisconsin: Sampling Design, Field and Laboratory Procedures, Data Entry and Analysis, and Applications, publication number PUB-SS-1068. Submit electronic point intercept data to this email address: DNRBaselineAquaticPlants@wisconsin.gov
4) All monitoring shall follow DNR protocols.
This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.
If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Unnamed T43n R07w S16-16
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Unnamed T43n R07w S16-16
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Unnamed T43n R07w S16-16
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Unnamed T43n R07w S16-16
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Upper Eau Claire Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Upper Kimball Lake
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Upper Ox Creek
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Upper Ox Creek -Un Channel
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Upper Ox Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Warner Lake
Status
Complete
Town Of Minong: Minong Town Lakes Ais Prevention & Control Project: The Town of Minong is sponsoring an AIS prevention and education project including an inventory of lakes in the township with AIS, training and education workshops, and an awareness program.
Deliverables include a comprehensive report including: 1) Report on public awareness activities and enrollment of riparian owners including copies of brochures, educational materials, and mailings; 2) Report on Aquatic Macrophyte survey observations of any detected aquatic invasive species with appropriate maps; 3) A Florist Quality Index shall be established for each lake; 4) Verification of workshops/inspector training such as agendas and attendance lists; 5) Report on public outreach activities such as copies of newsletters, report on Lakes Fair booth, and agendas of education presentations at public meetings; 6) Report on construction/maintenance of signage; 7) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
West Eightmile Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
West Fork Totagatic River
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
West Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
West Lake
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
West Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
West Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2004
Waters Involved
Whitefish Lake
Status
Complete
Town Of Wascott: Aquatic Invasion & Protection Control: The Town of Wascott, in cooperation with the Whitefish Lake Conservation Organization, Inc. proposes to conduct a watercraft inspection and public education program at the Whitefish Lake Public Landing beginning May 29th, 2004, and lasting through September 6th, 2004. A total of 987 hours will be put in by monitors at a cost of $7.50/hour during this time frame.
Specific deliverables of this project will include an account of the total hours put in by the monitors on a daily basis and a summary of the number of people reached by the monitors. The DNR will be provided with both a paper and electronic copy of any end of year summary reports that are generated as a result of this monitoring and inspection program.
Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Whitefish Lake
Status
Complete
Whitefish Lake Conservation Organization, In: Whitefish Lake Ais Program: The Whitefish Lake Conservation Organization proposes to continue a Clean Boat Clean Waters (CBCW) watercraft inspection program and increase Aquatic Invasive Species (AIS) education and outreach in the local area in 2006. The following activities/deliverables will be included in this project:
1) CBCW program with youth inspectors (approx. 500 hours) who will collect CBCW data in addition to recreational survey information to be used in the comprehensive lake management plan. The CBCW data will be entered into the statewide database. Recreational survey data will be compiled and used to recommend waterbody regulations to the Town of Wascott.
2) "Adopt-a-shore" program wherein riparians will be trained to identify AIS and inspect their shorelines monthly. Inspection data will be summarized and Adopt-a-shores identified on a lakemap.
3) Two boat landing kiosks will be constructed. Kiosks will include AIS information for recreation enthusiasts on Bond and Whitefish Lake.
4) Digital images will be collected the showcase the above items in addition to the annual Swim & Paddle-a-thon.
5) Any AIS related materials generated or paid for by this grant will be submitted as deliverables.
If an AIS is identified, Frank Koshere (715-392-0807) or Pamela Toshner (715-635-4073) should be contacted.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Whitefish Lake
Status
Complete
Whitefish Lake Conservation Organization, In: Whitefish Lake Aquatic Invasives Species Project: The Whitefish Lake Conservation Organization is sponsoring an AIS prevention education project including a boat inspection program at the public boat landing; educating boaters about AIS prevention; further development of an Adopt a Shore Line program; an AIS workshop; placing AIS educational articles in the lake association's newsletter and website; development and distribution of a localized AIS brochure; maintaining educational materials at boat landing kiosks; propose recommendations or regulations to protect the lake resources to the Town of Wascott Comprehensive Planning Committee.
The boat landing inspection program is based on a coordinator to train, schedule, and oversee paid and volunteer workers. Inspectors will attend Clean Boats, Clean Waters training.
Deliverables include a comprehensive report including:
1) Documentation of donated time and services related to grant administration. 2) Watercraft inspection report including time and number of people reached; CB/CW survey results; results will be entered into the CB/CW database. 3) Report on adopt a Shore Line monitoring results with maps. 4) Copy of the Whitefish Lake Property Owner's Guide to Aquatic Plants. 5) Copy of the newsletters, brochures, and educational materials used at the boat landing kiosks or distributed to the public. 6) Agenda and minutes of Town of Wascott Comprehensive Planning Committee meetings where recommendations are made. 7) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall immediately contact the DNR in the event of a new AIS infestation.
This scope summarizes the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. The DNR shall receive paper and electronic copies of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Whitefish Lake
Status
In_Progress
Whitefish Lake Conservation Organization, In: Whitefish Lake Ais Program 2011: The Whitefish Lake Conservation Organization is sponsoring an AIS prevention education project including a Clean Boat/Clean Water inspection program at the public boat landing; educating boaters and ice anglers about AIS prevention; further development of an Adopt a Shore Line program; an AIS workshop; placing AIS educational articles in the lake association's newsletter; public awareness at outreach events.
Deliverables include a comprehensive report including: 1) A summary of project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) CB/CW survey results; daily results will be entered into the DNR CB/CW database; 3) Verification of workshops and/or inspector training such as agendas and attendance lists; 4) Copies of press releases, newsletters, and educational materials distributed to the public; 5) Report on Adopt\2013a-Shore program; 6) Report on Ice Angler awareness activities; 7) Report on outreach education activities; 8) Report on AIS monitoring of boat landing area with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR if a new aquatic invasive species is found.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. If consultant is to provide final report, it is recommended that Grantee provide AIS Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2012
Waters Involved
Whitefish Lake
Status
Complete
Whitefish Lake Conservation Organization, In: Whitefish Lake 2012 Ais Program: The Whitefish Lake Conservation Organization is sponsoring an AIS prevention education project including a CBCW boat inspection program at the public boat landing and training of boat inspectors.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the project; 2) Watercraft inspection report including time and number of people reached; CB/CW survey results; daily results will be entered into the DNR CB/CW database; 3) Verification of workshops and/or inspector training such as agendas and attendance lists; 3) Report on AIS monitoring of boat landing area with appropriate maps; 4) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. If a consultant is to provide final report, it is recommended that Grantee provide AIS Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. The DNR shall receive a paper and electronic copy of the project deliverables.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Whiteside Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Wiley Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Program: The Town of Cable is sponsoring an Aquatic Invasive Species (AIS) prevention and education project which will focus on AIS education, prevention, monitoring, and management.
Project activities include:
1) Recruit and train volunteers
2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings
3) Collect plant samples from boaters/lakeshore owners and map location
4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles.
Project deliverables include:
1) Documentation of donated time and services related to grant administration
2) Agendas of training sessions and workshops
3) Entry of watercraft inspection report with time & number of people reached 3200-120 and monitoring forms onto Dept website
4) Report on public education distribution, meetings, and signage
5) Examples of brochures, newsletters, and educational materials used.
6) Report on aquatic plant surveillance results including monitoring observations with supporting graphs and maps
7) Final report summarizing CB/CW activities, AIS monitoring, and AIS management
8) Any AIS related materials generated or paid for by this grant.
Special conditions for this project: Sponsor shall immediately contact WDNR in the event of new AIS infestation. Final report needs Dept. review and approval
This scope summarizes the project in the grant application and does not supersede application specifics. If a consultant provides the final report, it is recommended that Grantee provide the DNR Lake Coordinator with a draft for review prior to making final payment to the consultant. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including all deliverables.
Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Wiley Lake
Status
Complete
Town Of Cable: Ais Control In The Town Of Cable: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers; 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings; 3) Collect plant samples from boaters/lakeshore owners and map location; 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles; 5) Develop a traveling AIS exhibit.
Deliverables include a paper and electronic copy of comprehensive report including: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monitoring observations of any detected aquatic invasive species with appropriate maps; 8) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall contact the DNR immediately in the event of a new aquatic invasive species infestation.
This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft
Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Wiley Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Recruit and train volunteers. 2) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake landings. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a traveling AIS exhibit.
Deliverables include: 1) Final Report summarizing accomplishments/progress of the grant including sign construction and watercraft inspection report detailing total time and number of people reached; 2) Verification of training of inspectors and monitors such as agendas and attendance lists; 3) CB/CW survey results; completed entry of daily inspection 3200-120 and monitoring forms into the DNR website database; 4) Report on construction/maintenance of educational signage; 5) Copies of newsletters, brochures and educational materials; 6) Report on traveling AIS exhibit; 7) Report on aquatic plant sampling/collection including monthly boat monitoring observations of any detected aquatic invasive species with appropriate maps; 8) Any AIS related materials generated or paid for by this grant.
Special condition: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Wiley Lake
Status
Complete
Town Of Cable: Town Of Cable Ais Prevention Program: The Town of Cable is sponsoring an AIS prevention and education project. Project activities include: 1) Implement a CB/CW program by inspecting boats and educating public at Perry, Tahkodah, and Cable Lake Landings. 2) Recruit and train volunteers. 3) Collect plant samples from boaters/lakeshore owners and map location. 4) Educate public about AIS by posting landings, distributing educational material to public, and submit articles. 5) Develop a AIS exhibit/Youth Program at the Cable Natural History Museum..
Deliverables include: 1) Final Report summarizing project accomplishments/progress including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Verification of inspector/monitor training such as attendance lists and agendas; 3) Daily CB/CW survey results entered into the CB/CW monitoring SWIMS database; 4) Verification of inspector/monitor training such as attendance lists and agendas; 5) Outreach report including copies of news releases, brochures, educational materials, and mailings; 6) Report on construction/maintenance of educational signage; 7) Report on Cable Natural History AIS exhibit; 8) Report on AIS results and monitoring observations of any detected aquatic invasive species with appropriate maps; 9) AIS related materials generated or paid for by this grant.
Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Williamson Creek
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Research Grant
Date
4/1/2012
Waters Involved
Minong Flowage
Status
Complete
Golden Sands Rc&D: Weevil Rearing 2&3: Golden Sands RC&D proposes to continue it Milfoil Weevil Mass Rearing Study, building on past work on the Holcombe Flowage in Rusk and Chippewa Counties, and expanding its studies to Perch Lake Wissota in St. Croix County, and the Minong Flowage in Douglas and Washburn Counties. Major project elements to include: 1) Volunteer group training, 2) Weevil acquisition, rearing, and release 3) Sample collection and analysis, 4) development of a comprehensive biological control manual, and 5) Final report.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Big Bass Lake
Status
Complete
Town Of Minong: Town Of Minong 2020 Cbcw (Bass, Pokegama): Minong is sponsoring a Clean Boats Clean Waters project in 2020 at 2 single public boat landings and 0 public boat landing pairs on POKEGAMA, BASS.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Bond Lake
Status
Complete
Bond Lake Property Owners Association: Bond Lake Property Owners Association 2019 Cbcw: Bond Lake Property Owners Association is sponsoring a Clean Boats Clean Waters project in 2019 at 1 single public boat landings and 0 public boat landing pairs on BOND LAKE (LANDING 1).
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Bond Lake
Status
Complete
Bond Lake Property Owners Association: Bond Lake Property Owners Association 2020 Cbcw: Bond Lake Property Owners Association is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 0 public boat landing pairs on BOND LAKE (LANDING 1, N/A).
Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Cranberry Creek
Status
Complete
Minong Flowage Association: Minong Flowage Clean Boats Clean Waters Project 2014: Minong Flowage Association will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2014.
Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Cranberry Creek
Status
Proposed
Town Of Minong: Town Of Minong Clean Boats Clean Waters Project 2014 (9 Lakes): Town of Minong will sponsor a Clean Boats Clean Water landing inspection program at 9 public accesses in 2014.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Cranberry Creek
Status
Complete
Minong Flowage Association: Minong Flowage 2015 Clean Boats Clean Waters Project: The Minong Flowage Assocation is sponsoring a 2015 Clean Boats Clean Waters project at one public landing on the Minong Flowage.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Cranberry Creek
Status
Proposed
Town Of Minong: Town Of Minong 2015 Clean Boats Clean Waters Project: The Town of Minong is sponoring a 2015 Clean Boats Clean Waters project including 8 public landings on 8 lakes inlcuding Big Bass, Big Sand, Gilmore, Horseshoe, Minong Flowage, Nancy and Pokegama Lakes.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Cranberry Creek
Status
Complete
Minong Flowage Association: Minong Flowage Association 2016 Clean Boats Clean Water: The Minong Flowage Association is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Minong Flowage.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Cranberry Creek
Status
Complete
Town Of Minong: Town Of Minong 2016 Clean Boats Clean Waters: TheTown of Minong is sponsoring a Clean Boats Clean Waters project in 2016 at 8 public boat landings on Town Lakes(Big Bass, Big Sand, Gilmore, Horseshoe, Kimball, Minong Flowage, Nancy, Pokegama)..
Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Cranberry Creek
Status
Complete
Minong Flowage Association: Minong Flowage Association 2017 Cbcw: Minong Flowage Association is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on MINONG FLOWAGE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Cranberry Creek
Status
Complete
Town Of Minong: Minong 2017 Nancy Lake & Minong Flowage Cbcw: Minong is sponsoring a Clean Boats Clean Waters project in 2017 at 2 single public boat landings and 0 public boat landing pairs on NANCY LAKE, MINONG FLOWAGE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2018
Waters Involved
Cranberry Creek
Status
Complete
Minong Flowage Association: Minong Flowage Association 2018 Cbcw: Minong Flowage Association is sponsoring a Clean Boats Clean Waters project in 2018 at 1 single public boat landings and 0 public boat landing pairs on MINONG FLOWAGE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Cranberry Creek
Status
Complete
Minong Flowage Association: Minong Flowage Association 2020 Cbcw: Minong Flowage Association is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 0 public boat landing pairs on MINONG FLOWAGE (DNR, N/A).
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Cranberry Creek
Status
Complete
Town Of Minong: Town Of Minong 2020 Cbcw (Gilmore, Horseshoe, Nancy, Kimball, Sand, Flowage): Minong is sponsoring a Clean Boats Clean Waters project in 2020 at 6 single public boat landings and 0 public boat landing pairs on BIG SAND, GILMORE, HORSESHOE, KIMBALL, MINONG FLOWAGE (COUNTY PARK), NANCY.
Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Gilmore Lake
Status
Proposed
Town Of Minong: Town Of Minong Clean Boats Clean Waters 2013: The Town of Minong will sponsor a Clean Boats Clean Waters Program for Gib Bass, Gilmore, Kimball, Nancy, Pokegama, Horseshoe, Big Sand, Scovil and Bear Track Lakes for 2013 including 9 public landings.
Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Gilmore Lake
Status
Proposed
Town Of Minong: Town Of Minong Clean Boats Clean Waters Project 2014 (9 Lakes): Town of Minong will sponsor a Clean Boats Clean Water landing inspection program at 9 public accesses in 2014.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Gilmore Lake
Status
Proposed
Town Of Minong: Town Of Minong 2015 Clean Boats Clean Waters Project: The Town of Minong is sponoring a 2015 Clean Boats Clean Waters project including 8 public landings on 8 lakes inlcuding Big Bass, Big Sand, Gilmore, Horseshoe, Minong Flowage, Nancy and Pokegama Lakes.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Gilmore Lake
Status
Complete
Town Of Minong: Town Of Minong 2020 Cbcw (Gilmore, Horseshoe, Nancy, Kimball, Sand, Flowage): Minong is sponsoring a Clean Boats Clean Waters project in 2020 at 6 single public boat landings and 0 public boat landing pairs on BIG SAND, GILMORE, HORSESHOE, KIMBALL, MINONG FLOWAGE (COUNTY PARK), NANCY.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Horseshoe Lake
Status
Complete
Town Of Minong: Town Of Minong 2020 Cbcw (Gilmore, Horseshoe, Nancy, Kimball, Sand, Flowage): Minong is sponsoring a Clean Boats Clean Waters project in 2020 at 6 single public boat landings and 0 public boat landing pairs on BIG SAND, GILMORE, HORSESHOE, KIMBALL, MINONG FLOWAGE (COUNTY PARK), NANCY.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Lake Nancy
Status
Complete
Town Of Minong: Minong 2017 Nancy Lake & Minong Flowage Cbcw: Minong is sponsoring a Clean Boats Clean Waters project in 2017 at 2 single public boat landings and 0 public boat landing pairs on NANCY LAKE, MINONG FLOWAGE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Lake Nancy
Status
Complete
Town Of Minong: Town Of Minong 2020 Cbcw (Gilmore, Horseshoe, Nancy, Kimball, Sand, Flowage): Minong is sponsoring a Clean Boats Clean Waters project in 2020 at 6 single public boat landings and 0 public boat landing pairs on BIG SAND, GILMORE, HORSESHOE, KIMBALL, MINONG FLOWAGE (COUNTY PARK), NANCY.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Lower Kimball Lake
Status
Complete
Town Of Minong: Town Of Minong 2020 Cbcw (Gilmore, Horseshoe, Nancy, Kimball, Sand, Flowage): Minong is sponsoring a Clean Boats Clean Waters project in 2020 at 6 single public boat landings and 0 public boat landing pairs on BIG SAND, GILMORE, HORSESHOE, KIMBALL, MINONG FLOWAGE (COUNTY PARK), NANCY.
Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Minong Flowage
Status
Complete
Minong Flowage Association: Minong Flowage Clean Boats Clean Waters Project 2014: Minong Flowage Association will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2014.
Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Minong Flowage
Status
Proposed
Town Of Minong: Town Of Minong Clean Boats Clean Waters Project 2014 (9 Lakes): Town of Minong will sponsor a Clean Boats Clean Water landing inspection program at 9 public accesses in 2014.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Minong Flowage
Status
Complete
Minong Flowage Association: Minong Flowage 2015 Clean Boats Clean Waters Project: The Minong Flowage Assocation is sponsoring a 2015 Clean Boats Clean Waters project at one public landing on the Minong Flowage.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Minong Flowage
Status
Proposed
Town Of Minong: Town Of Minong 2015 Clean Boats Clean Waters Project: The Town of Minong is sponoring a 2015 Clean Boats Clean Waters project including 8 public landings on 8 lakes inlcuding Big Bass, Big Sand, Gilmore, Horseshoe, Minong Flowage, Nancy and Pokegama Lakes.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Minong Flowage
Status
Complete
Minong Flowage Association: Minong Flowage Association 2016 Clean Boats Clean Water: The Minong Flowage Association is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Minong Flowage.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Minong Flowage
Status
Complete
Town Of Minong: Town Of Minong 2016 Clean Boats Clean Waters: TheTown of Minong is sponsoring a Clean Boats Clean Waters project in 2016 at 8 public boat landings on Town Lakes(Big Bass, Big Sand, Gilmore, Horseshoe, Kimball, Minong Flowage, Nancy, Pokegama)..
Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Minong Flowage
Status
Complete
Minong Flowage Association: Minong Flowage Association 2017 Cbcw: Minong Flowage Association is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on MINONG FLOWAGE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Minong Flowage
Status
Complete
Town Of Minong: Minong 2017 Nancy Lake & Minong Flowage Cbcw: Minong is sponsoring a Clean Boats Clean Waters project in 2017 at 2 single public boat landings and 0 public boat landing pairs on NANCY LAKE, MINONG FLOWAGE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2018
Waters Involved
Minong Flowage
Status
Complete
Minong Flowage Association: Minong Flowage Association 2018 Cbcw: Minong Flowage Association is sponsoring a Clean Boats Clean Waters project in 2018 at 1 single public boat landings and 0 public boat landing pairs on MINONG FLOWAGE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Minong Flowage
Status
Complete
Minong Flowage Association: Minong Flowage Association 2020 Cbcw: Minong Flowage Association is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 0 public boat landing pairs on MINONG FLOWAGE (DNR, N/A).
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Minong Flowage
Status
Complete
Town Of Minong: Town Of Minong 2020 Cbcw (Gilmore, Horseshoe, Nancy, Kimball, Sand, Flowage): Minong is sponsoring a Clean Boats Clean Waters project in 2020 at 6 single public boat landings and 0 public boat landing pairs on BIG SAND, GILMORE, HORSESHOE, KIMBALL, MINONG FLOWAGE (COUNTY PARK), NANCY.
Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Nelson Lake
Status
Complete
Nelson Lake Association: Nelson Lake Clean Boats Clean Waters 0213: The Nelson Lake Association is sponsoring a Clean Boats Clean Waters inspection program for 2013 at one public boat landing on Nelson Lake.
Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Nelson Lake
Status
Complete
Nelson Lake Association: Nelson Lake Clean Boats Clean Water Project 2014: Nelson Lake Association will sponsor a Clean Boats Clean Water landing inspection program at 2 public accesses in 2014.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Nelson Lake
Status
Complete
Nelson Lake Association: Nelson Lake 2015 Clean Boats Clean Water Project: The Nelson Lake Association is sponsoring a 2015 Clean Boats Clean Waters project at two public landings on Nelson Lake.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Nelson Lake
Status
Complete
Nelson Lake Association: Nelson Lake Association 2016 Clean Boats Clean Waters: The Nelson Lake Association is sponsoring a Clean Boats Clean Waters project in 2016 at 2 public boat landing on Nelson Lake.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Nelson Lake
Status
Complete
Nelson Lake Association: Nelson Lake Association 2017 Cbcw: Nelson Lake Association is sponsoring a Clean Boats Clean Waters project in 2017 at 2 single public boat landings and 0 public boat landing pairs on NELSON LAKE, NELSON LAKE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2018
Waters Involved
Nelson Lake
Status
Complete
Nelson Lake Association: Nelson Lake Association 2018 Cbcw: Nelson Lake Association is sponsoring a Clean Boats Clean Waters project in 2018 at 2 single public boat landings and 0 public boat landing pairs on NELSON LAKE, NELSON LAKE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Nelson Lake
Status
Complete
Nelson Lake Association: Nelson Lake Association 2019 Cbcw: Nelson Lake Association is sponsoring a Clean Boats Clean Waters project in 2019 at 2 single public boat landings and 0 public boat landing pairs on NELSON LAKE (GERLACH), NELSON LAKE(WEST BASIN/PARK).
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Nelson Lake
Status
Complete
Nelson Lake Association: Nelson Lake Association 2020 Cbcw: Nelson Lake Association is sponsoring a Clean Boats Clean Waters project in 2020 at 2 single public boat landings and 0 public boat landing pairs on NELSON LAKE (GERLACH), NELSON LAKE(WEST BASIN/PARK).
Grant Details
Clean Boats, Clean Waters
Date
2/15/2021
Waters Involved
Nelson Lake
Status
Complete
Nelson Lake Association: Nelson Lake Association 2021 Cbcw: Nelson Lake Association is sponsoring a Clean Boats Clean Waters project in 2021 at 2 single public boat landings and 0 public boat landing pairs on NELSON LAKE (GERLACH, N/A), NELSON LAKE(WEST BASIN/PARK, N/A).
Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Pokegama Lake
Status
Proposed
Town Of Minong: Town Of Minong Clean Boats Clean Waters 2013: The Town of Minong will sponsor a Clean Boats Clean Waters Program for Gib Bass, Gilmore, Kimball, Nancy, Pokegama, Horseshoe, Big Sand, Scovil and Bear Track Lakes for 2013 including 9 public landings.
Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Pokegama Lake
Status
Proposed
Town Of Minong: Town Of Minong Clean Boats Clean Waters Project 2014 (9 Lakes): Town of Minong will sponsor a Clean Boats Clean Water landing inspection program at 9 public accesses in 2014.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Pokegama Lake
Status
Proposed
Town Of Minong: Town Of Minong 2015 Clean Boats Clean Waters Project: The Town of Minong is sponoring a 2015 Clean Boats Clean Waters project including 8 public landings on 8 lakes inlcuding Big Bass, Big Sand, Gilmore, Horseshoe, Minong Flowage, Nancy and Pokegama Lakes.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Pokegama Lake
Status
Complete
Town Of Minong: Town Of Minong 2019 Cbcw (Bass, Pokegama): Minong is sponsoring a Clean Boats Clean Waters project in 2019 at 2 single public boat landings and 0 public boat landing pairs on BIG BASS LAKE, POKEGAMA LAKE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Pokegama Lake
Status
Complete
Town Of Minong: Town Of Minong 2020 Cbcw (Bass, Pokegama): Minong is sponsoring a Clean Boats Clean Waters project in 2020 at 2 single public boat landings and 0 public boat landing pairs on POKEGAMA, BASS.
Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Red Lake
Status
Complete
Red Lake Association: Red Lake Clean Boats Clean Water 2013: The Red Lake Association is sponsoring a Clean Boats Clean Waters project in 2013 at one public boat landing on Red Lake.
Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Red Lake
Status
Complete
Red Lake Association: Red Lake Clean Boats Clean Waters Project 2014: Red Lake Lake Association will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2014.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Red Lake
Status
Complete
Red Lake Association: Red Lake 2015 Clean Boats Clean Waters Project: The Red Lake Association is sponsoring a 2015 Clean Boats Clean Waters Project at one public landing on Red Lake.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Red Lake
Status
Complete
Red Lake Association: Red Lake Lake Association 2016 Clean Boats Clean Waters: The Red Lake Lake Association, Inc. is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Red Lake.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Red Lake
Status
Complete
Red Lake Association: Red Lake Association 2017 Cbcw: Red Lake Association is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on RED LAKE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Red Lake
Status
Complete
Red Lake Association: Red Lake Association 2019 Cbcw: Red Lake Association is sponsoring a Clean Boats Clean Waters project in 2019 at 1 single public boat landings and 0 public boat landing pairs on RED LAKE (HEINZ ROAD, N/A).
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Red Lake
Status
Complete
Red Lake Association: Red Lake Association 2020 Cbcw: Red Lake Association is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 0 public boat landing pairs on RED LAKE (HEINZ ROAD, N/A).
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Sand Lake
Status
Complete
Town Of Minong: Town Of Minong 2020 Cbcw (Gilmore, Horseshoe, Nancy, Kimball, Sand, Flowage): Minong is sponsoring a Clean Boats Clean Waters project in 2020 at 6 single public boat landings and 0 public boat landing pairs on BIG SAND, GILMORE, HORSESHOE, KIMBALL, MINONG FLOWAGE (COUNTY PARK), NANCY.
Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Totagatic River
Status
Complete
Nelson Lake Association: Nelson Lake Clean Boats Clean Waters 0213: The Nelson Lake Association is sponsoring a Clean Boats Clean Waters inspection program for 2013 at one public boat landing on Nelson Lake.
Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Totagatic River
Status
Complete
Minong Flowage Association: Minong Flowage Clean Boats Clean Waters Project 2014: Minong Flowage Association will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2014.
Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Totagatic River
Status
Complete
Nelson Lake Association: Nelson Lake Clean Boats Clean Water Project 2014: Nelson Lake Association will sponsor a Clean Boats Clean Water landing inspection program at 2 public accesses in 2014.
Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Totagatic River
Status
Proposed
Town Of Minong: Town Of Minong Clean Boats Clean Waters Project 2014 (9 Lakes): Town of Minong will sponsor a Clean Boats Clean Water landing inspection program at 9 public accesses in 2014.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Totagatic River
Status
Complete
Minong Flowage Association: Minong Flowage 2015 Clean Boats Clean Waters Project: The Minong Flowage Assocation is sponsoring a 2015 Clean Boats Clean Waters project at one public landing on the Minong Flowage.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Totagatic River
Status
Complete
Nelson Lake Association: Nelson Lake 2015 Clean Boats Clean Water Project: The Nelson Lake Association is sponsoring a 2015 Clean Boats Clean Waters project at two public landings on Nelson Lake.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Totagatic River
Status
Proposed
Town Of Minong: Town Of Minong 2015 Clean Boats Clean Waters Project: The Town of Minong is sponoring a 2015 Clean Boats Clean Waters project including 8 public landings on 8 lakes inlcuding Big Bass, Big Sand, Gilmore, Horseshoe, Minong Flowage, Nancy and Pokegama Lakes.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Totagatic River
Status
Complete
Minong Flowage Association: Minong Flowage Association 2016 Clean Boats Clean Water: The Minong Flowage Association is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Minong Flowage.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Totagatic River
Status
Complete
Nelson Lake Association: Nelson Lake Association 2016 Clean Boats Clean Waters: The Nelson Lake Association is sponsoring a Clean Boats Clean Waters project in 2016 at 2 public boat landing on Nelson Lake.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Totagatic River
Status
Complete
Town Of Minong: Town Of Minong 2016 Clean Boats Clean Waters: TheTown of Minong is sponsoring a Clean Boats Clean Waters project in 2016 at 8 public boat landings on Town Lakes(Big Bass, Big Sand, Gilmore, Horseshoe, Kimball, Minong Flowage, Nancy, Pokegama)..
Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Totagatic River
Status
Complete
Minong Flowage Association: Minong Flowage Association 2017 Cbcw: Minong Flowage Association is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on MINONG FLOWAGE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Totagatic River
Status
Complete
Nelson Lake Association: Nelson Lake Association 2017 Cbcw: Nelson Lake Association is sponsoring a Clean Boats Clean Waters project in 2017 at 2 single public boat landings and 0 public boat landing pairs on NELSON LAKE, NELSON LAKE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Totagatic River
Status
Complete
Town Of Minong: Minong 2017 Nancy Lake & Minong Flowage Cbcw: Minong is sponsoring a Clean Boats Clean Waters project in 2017 at 2 single public boat landings and 0 public boat landing pairs on NANCY LAKE, MINONG FLOWAGE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2018
Waters Involved
Totagatic River
Status
Complete
Minong Flowage Association: Minong Flowage Association 2018 Cbcw: Minong Flowage Association is sponsoring a Clean Boats Clean Waters project in 2018 at 1 single public boat landings and 0 public boat landing pairs on MINONG FLOWAGE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2018
Waters Involved
Totagatic River
Status
Complete
Nelson Lake Association: Nelson Lake Association 2018 Cbcw: Nelson Lake Association is sponsoring a Clean Boats Clean Waters project in 2018 at 2 single public boat landings and 0 public boat landing pairs on NELSON LAKE, NELSON LAKE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Totagatic River
Status
Complete
Nelson Lake Association: Nelson Lake Association 2019 Cbcw: Nelson Lake Association is sponsoring a Clean Boats Clean Waters project in 2019 at 2 single public boat landings and 0 public boat landing pairs on NELSON LAKE (GERLACH), NELSON LAKE(WEST BASIN/PARK).
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Totagatic River
Status
Complete
Minong Flowage Association: Minong Flowage Association 2020 Cbcw: Minong Flowage Association is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 0 public boat landing pairs on MINONG FLOWAGE (DNR, N/A).
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Totagatic River
Status
Complete
Nelson Lake Association: Nelson Lake Association 2020 Cbcw: Nelson Lake Association is sponsoring a Clean Boats Clean Waters project in 2020 at 2 single public boat landings and 0 public boat landing pairs on NELSON LAKE (GERLACH), NELSON LAKE(WEST BASIN/PARK).
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Totagatic River
Status
Complete
Town Of Minong: Town Of Minong 2020 Cbcw (Gilmore, Horseshoe, Nancy, Kimball, Sand, Flowage): Minong is sponsoring a Clean Boats Clean Waters project in 2020 at 6 single public boat landings and 0 public boat landing pairs on BIG SAND, GILMORE, HORSESHOE, KIMBALL, MINONG FLOWAGE (COUNTY PARK), NANCY.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2021
Waters Involved
Totagatic River
Status
Complete
Nelson Lake Association: Nelson Lake Association 2021 Cbcw: Nelson Lake Association is sponsoring a Clean Boats Clean Waters project in 2021 at 2 single public boat landings and 0 public boat landing pairs on NELSON LAKE (GERLACH, N/A), NELSON LAKE(WEST BASIN/PARK, N/A).
Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Unnamed
Status
Proposed
Town Of Minong: Town Of Minong Clean Boats Clean Waters 2013: The Town of Minong will sponsor a Clean Boats Clean Waters Program for Gib Bass, Gilmore, Kimball, Nancy, Pokegama, Horseshoe, Big Sand, Scovil and Bear Track Lakes for 2013 including 9 public landings.
Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Unnamed
Status
Proposed
Town Of Minong: Town Of Minong Clean Boats Clean Waters Project 2014 (9 Lakes): Town of Minong will sponsor a Clean Boats Clean Water landing inspection program at 9 public accesses in 2014.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Unnamed
Status
Proposed
Town Of Minong: Town Of Minong 2015 Clean Boats Clean Waters Project: The Town of Minong is sponoring a 2015 Clean Boats Clean Waters project including 8 public landings on 8 lakes inlcuding Big Bass, Big Sand, Gilmore, Horseshoe, Minong Flowage, Nancy and Pokegama Lakes.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Unnamed
Status
Complete
Town Of Minong: Minong 2017 Nancy Lake & Minong Flowage Cbcw: Minong is sponsoring a Clean Boats Clean Waters project in 2017 at 2 single public boat landings and 0 public boat landing pairs on NANCY LAKE, MINONG FLOWAGE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Unnamed
Status
Complete
Bond Lake Property Owners Association: Bond Lake Property Owners Association 2019 Cbcw: Bond Lake Property Owners Association is sponsoring a Clean Boats Clean Waters project in 2019 at 1 single public boat landings and 0 public boat landing pairs on BOND LAKE (LANDING 1).
Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Unnamed
Status
Complete
Town Of Minong: Town Of Minong 2019 Cbcw (Bass, Pokegama): Minong is sponsoring a Clean Boats Clean Waters project in 2019 at 2 single public boat landings and 0 public boat landing pairs on BIG BASS LAKE, POKEGAMA LAKE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Unnamed
Status
Complete
Bond Lake Property Owners Association: Bond Lake Property Owners Association 2020 Cbcw: Bond Lake Property Owners Association is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 0 public boat landing pairs on BOND LAKE (LANDING 1, N/A).
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Unnamed
Status
Complete
Town Of Minong: Town Of Minong 2020 Cbcw (Bass, Pokegama): Minong is sponsoring a Clean Boats Clean Waters project in 2020 at 2 single public boat landings and 0 public boat landing pairs on POKEGAMA, BASS.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Unnamed
Status
Complete
Town Of Minong: Town Of Minong 2020 Cbcw (Gilmore, Horseshoe, Nancy, Kimball, Sand, Flowage): Minong is sponsoring a Clean Boats Clean Waters project in 2020 at 6 single public boat landings and 0 public boat landing pairs on BIG SAND, GILMORE, HORSESHOE, KIMBALL, MINONG FLOWAGE (COUNTY PARK), NANCY.
Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Whitefish Lake
Status
Complete
Whitefish Lake Conservation Organization, In: Whitefish Lake Clean Boats Clean Waters 2013: The Whitefish Lake Conservation Organziation is sponsoring a Clean Boats Clean Waters landing inspection project for 2013 at one public boat landing on Whitefish Lake.
Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Whitefish Lake
Status
Complete
Whitefish Lake Conservation Organization, In: Whitefish Lake Clean Boats Clean Waters Project 2014: Whitefish Lake Conservation Organization Inc. will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2014.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Whitefish Lake
Status
Complete
Whitefish Lake Conservation Organization, In: Whitefish Lake Clean Boats Clean Waters Project 2015: Whitefish Lake Conservation Organization will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2015
Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Whitefish Lake
Status
Complete
Whitefish Lake Conservation Organization, In: Whitefish Lake Conservation Organization(Wilco) 2016 Clean Boats Clean Waters: The Whitefish Lake Conservation Organization is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Whitefish Lake.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Whitefish Lake
Status
Complete
Whitefish Lake Conservation Organization, In: Whitefish Lake Conservation Organization, In 2017 Cbcw: Whitefish Lake Conservation Organization, In is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on WHITEFISH LAKE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2018
Waters Involved
Whitefish Lake
Status
Complete
Whitefish Lake Conservation Organization, In: Whitefish Lake Conservation Organization, In 2018 Cbcw: Whitefish Lake Conservation Organization, In is sponsoring a Clean Boats Clean Waters project in 2018 at 1 single public boat landings and 0 public boat landing pairs on WHITEFISH LAKE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Whitefish Lake
Status
Complete
Whitefish Lake Conservation Organization, In: Whitefish Lake Conservation Organization, In 2019 Cbcw: Whitefish Lake Conservation Organization, In is sponsoring a Clean Boats Clean Waters project in 2019 at 1 single public boat landings and 0 public boat landing pairs on WHITEFISH LAKE (SW CORNER OF LK).
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Whitefish Lake
Status
Complete
Whitefish Lake Conservation Organization, In: Whitefish Lake Conservation Organization, In 2020 Cbcw: Whitefish Lake Conservation Organization, In is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 0 public boat landing pairs on WHITEFISH LAKE (SW CORNER OF LAKE, N/A).
Grant Details
Lake Protection Grant
Date
7/1/2007
Waters Involved
Bony Lake
Status
Complete
Bayfield County: Res-Bony Lakewide Restoration & Conservation Project: Bayfield County in partnership with ABDI Land & Water Conservation, Sigurd Olson Environmental Institute, and Bony Lake property owners will implement a lake restoration project. More than 50% of the property owners (resulting in over a mile of linear shoreline) expressed a commitment to shoreline restoration, and additional lake protection activities, such as storm water best management practices (e.g. rain gardens), littoral habitat restoration (e.g. tree drops), and shoreline restorations exceeding minimum county and state standards will be strongly encouraged. Multiple partners will collaborate with the following: technical assistance; restoration cost-share assistance; promotion and education; recognition activities; and enrollment payments. The project also includes collecting pre- and post-restoration monitoring data for baseline and future comparison. These data may include bird, amphibian, terrestrial and aquatic plant community information, and a top/bottom paleoecological sediment core. Project leaders will continually promote media coverage and demonstration opportunities for the surrounding community.
All parcels require a department approved deed restriction that permanently establishes the vegetative buffer on the parcel. Restorations must follow standards set forth in NR 191.24(3).
Project deliverables include: a final report listing all project accomplishments including the number of parcels or lots participating in the program; educational materials developed; media coverage; and monitoring results.
A final report in PDF format summarizing the results of the project as well as copies of databases, maps, GIS files, guidebooks, ordinances or any other products resulting from the project shall be provided to the Department for review prior to final payment.
Grant Details
Lake Protection Grant
Date
9/1/2000
Waters Involved
Clear Lake
Status
Complete
Clear Lake Property Owners Association Inc: Res-Clear Lake Native Aquatic Plant & Habitat Restoration Project: The Clear Lake Property Owners Association, Inc. is proposing to restore the rich native aquatic plant community of Clear Lake, Sawyer County by selective eradication of the exotic species, Eurasian Water Milfoil (EWM), and long term protection of the natural habitat.
The portion of the project to be funded with this grant include the development of contingency plans for possible aeration or replanting of native aquatic vegetation if either is necessary.
Post treatment water quality and macrophyte surveys will be conducted for the next three calendar years to carefully measure the effectiveness of the treatment and the resultant impact on restoration of native plants.
Significant financial support for this project has been offered by the herbicide manufacturer, SePRO, Inc., and the local chapter of Muskies, Inc.
Specific deliverables for this grant project will include:
A final report on the follow-up monitoring and the lake ecosystem response.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.
Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Couderay River
Status
Complete
Courte Oreilles Lake Assoc.: Res-Lac Courte Oreilles Shoreland Restoration: Courte Oreilles Lake Association is sponsoring a project to design and install shoreline buffer restorations on Lac Courte Oreilles and Little Lac Courte Oreilles Lakes.
Project tasks include: 1) Shoreline buffer design/restoration on approximately 25 shoreline sites; 2) Modeling to estimate TSS and TP reductions from buffer restorations; 3) Develop and distribute shoreline buffer educational materials.
Shoreline restorations shall follow standards set forth in NR 191.24(3) unless mutually agreed to in writing with the regional lake biologist before implementation occurs. Shoreline restorations using grant funding for plants or labor require a Department approved restrictive covenant that permanently establishes the vegetative buffer on the parcel. Maintenance, operation, and protection will be specified in a ten-year contract for each BMP site. The Department may perform site inspection and/or monitoring.
Project deliverables include: a report and map summarizing project activities including modeling results and educational materials developed, square feet of shoreline buffer restored, individual property shoreline restoration plans, pre-post photos of funded restorations, signed 10 year maintenance agreements, and copies of all Shoreland Vegetative Protection Agreements.
Special conditions: Applicable water regulation and/or county zoning permits must be issued before construction activities commence.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Cranberry Creek
Status
Complete
Minong Flowage Association: Hlk-Minong Flowage: Fish-Sticks Dan Maxwell: Minong Flowage Association will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan. Practices include: fish sticks 1 lakeshore property.
The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #17. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #17 is required.
The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.
Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Cranberry Creek
Status
Complete
Minong Flowage Association: Hlr - Minong Flowage - Fish Sticks 2020-2023: Partnering with property owners, Minong Flowage Association is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
3/15/2022
Waters Involved
Cranberry Creek
Status
Complete
Washburn County: Hlr - Washburn County Shoreline Improvments: Partnering with property owners, Washburn County is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Deep Lake
Status
Complete
Washburn County: Hlr - Washburn County Land & Water, Lakes And Rivers Shore Buffers: Partnering with property owners, Washburn County is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Deer Creek
Status
Complete
West Wisconsin Land Trust: Acq-Stockman Property Deer Lake Ii: The West Wisconsin Land Trust proposes to purchase an easement on approximately 75 acres of the Stockman property on Deer Lake in Sawyer County. The easement protects 4,600 feet of lake frontage and eliminates any option of development on the protected property.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Deer Lake
Status
Complete
West Wisconsin Land Trust: Acq-Mcmillins Deer Lake 1/2 Mile: The West Wisconsin Land Trust proposes to purchase an easement on 78.6 acres of the Tom McMillin property on Deer Lake in Sawyer County. The easement protects 2,640 feet of lake frontage and eliminates any option of development on the protected property.
Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Deer Lake
Status
Complete
West Wisconsin Land Trust: Acq-Stockman Property Deer Lake Ii: The West Wisconsin Land Trust proposes to purchase an easement on approximately 75 acres of the Stockman property on Deer Lake in Sawyer County. The easement protects 4,600 feet of lake frontage and eliminates any option of development on the protected property.
Grant Details
Lake Protection Grant
Date
3/15/2022
Waters Involved
Ellsworth Lake
Status
Complete
Washburn County: Hlr - Washburn County Shoreline Improvments: Partnering with property owners, Washburn County is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Gilmore Lake
Status
Complete
Washburn County: Hlr - Washburn County Land & Water, Lakes And Rivers Shore Buffers: Partnering with property owners, Washburn County is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Lac Courte Oreilles
Status
Complete
Courte Oreilles Lake Assoc.: Res-Lac Courte Oreilles Shoreland Restoration: Courte Oreilles Lake Association is sponsoring a project to design and install shoreline buffer restorations on Lac Courte Oreilles and Little Lac Courte Oreilles Lakes.
Project tasks include: 1) Shoreline buffer design/restoration on approximately 25 shoreline sites; 2) Modeling to estimate TSS and TP reductions from buffer restorations; 3) Develop and distribute shoreline buffer educational materials.
Shoreline restorations shall follow standards set forth in NR 191.24(3) unless mutually agreed to in writing with the regional lake biologist before implementation occurs. Shoreline restorations using grant funding for plants or labor require a Department approved restrictive covenant that permanently establishes the vegetative buffer on the parcel. Maintenance, operation, and protection will be specified in a ten-year contract for each BMP site. The Department may perform site inspection and/or monitoring.
Project deliverables include: a report and map summarizing project activities including modeling results and educational materials developed, square feet of shoreline buffer restored, individual property shoreline restoration plans, pre-post photos of funded restorations, signed 10 year maintenance agreements, and copies of all Shoreland Vegetative Protection Agreements.
Special conditions: Applicable water regulation and/or county zoning permits must be issued before construction activities commence.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Lake Nancy
Status
Complete
Lake Nancy Protective Association, Inc.: Hlk-Nancy Lake Healthy Lakes Project: Lake Nancy Protective Association will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan. Practices include: fish sticks and 350 feet2 native plantings on 3 lakeshore properties.
The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #17. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #16 is required.
The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.
Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share for grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Lake Nebagamon
Status
Complete
Village Of Lake Nebagamon: Lmi-Stormwater Runoff Boat Landing Lake Nebagamon: The Village of Lake Nebagamon is sponsoring a project to implement engineered stormwater best practices at the lake\2019s public boat landing downtown. The Project also includes community outreach and tours to share the project results.
Deliverables include: construction specs and plans, 25-year operation & maintenance plan with pre/post photos, and an outreach summary.
The specific objectives, metrics, and deliverables for the listed activities are included in the application and supporting materials, and this scope is not intended to replace or supersede those documents.
Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Little Lac Courte Oreilles
Status
Complete
Courte Oreilles Lake Assoc.: Res-Lac Courte Oreilles Shoreland Restoration: Courte Oreilles Lake Association is sponsoring a project to design and install shoreline buffer restorations on Lac Courte Oreilles and Little Lac Courte Oreilles Lakes.
Project tasks include: 1) Shoreline buffer design/restoration on approximately 25 shoreline sites; 2) Modeling to estimate TSS and TP reductions from buffer restorations; 3) Develop and distribute shoreline buffer educational materials.
Shoreline restorations shall follow standards set forth in NR 191.24(3) unless mutually agreed to in writing with the regional lake biologist before implementation occurs. Shoreline restorations using grant funding for plants or labor require a Department approved restrictive covenant that permanently establishes the vegetative buffer on the parcel. Maintenance, operation, and protection will be specified in a ten-year contract for each BMP site. The Department may perform site inspection and/or monitoring.
Project deliverables include: a report and map summarizing project activities including modeling results and educational materials developed, square feet of shoreline buffer restored, individual property shoreline restoration plans, pre-post photos of funded restorations, signed 10 year maintenance agreements, and copies of all Shoreland Vegetative Protection Agreements.
Special conditions: Applicable water regulation and/or county zoning permits must be issued before construction activities commence.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Long Lake
Status
Complete
Long Lake Preservation Association: Lmi-Integration Of Watershed Mgt Activities In A Comprehensive Plan: The Long Lake Preservation Association, Inc. will conduct a comprehensive planning project which will produce a comprehensive community plan for a three-town planning cluster that includes:
1. Consideration of local watershed inventories and interpreted data,
2. A process that provides for related public education and consensus building, and
3. Recommendations for specific watershed management strategies and tools tailored to the Long Lake watershed and integrated with the natural and agricultural resources element of Washburn County and related town comprehensive plans.
Specific deliverables for this project will be a final report, including the comprehensive community plan and all pertinent survey, inventory, and analysis data utilized to develop the plan. The sponsor will provide the Department of Natural Resources with electronic and paper copies of periodic progress reports and the final report on this project.
Grant Details
Lake Protection Grant
Date
8/1/2004
Waters Involved
Long Lake
Status
Complete
Long Lake Preservation Association: Lmi-Implementing Stormwater Bmp'S In The Long Lake Watershed: The Long Lake Preservation Association (LLPA) will sponsor a project to implement recommendations contained in the Long Lake Management Plan. The project will install structural Best Management Practices (BMP's), publicize and promote the use of BMP's, educate the public on the importance of runoff management control for lake water quality. Other components of this project include the education of boaters on the issues of prevention of invasive species introduction and lake-friendly boating in the channel areas to minimize sediment disturbance.
BMP's to be installed through this project include three rain gardens (vegetated stormwater infiltration basins), grassed waterways, alterations to landscaping to enhance stormwater infiltration. The Hunt Hill Audubon Preserve will be the BMP installation site for onsite stormwater management and will provide a location to promote the use of these practices. Educational activities associated with this project include the use of newsletters, web page, the development of a watershed stewardship manual/calendar, public participation in the design and installation of the BMP's, an other educational efforts.
Seven boat landing kiosks will be developed and installed, which will include information on invasive species prevention and lake-friendly boating.
LLPA will hire a part-time project coordinator to assist in the administration of these project activities as well as other parts of the LLPA's strategic plan.
Project deliverables for this project include a final report listing all project accomplishments. The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.
Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Long Lake
Status
Complete
Washburn County: Lmi-Cth M Stormwater Improvements: Washburn County Highway Department is sponsoring a project to implement engineered stormwater best practices along >1000 foot portion of CTH M that is directly adjacent to Long Lake. The Project also includes developing a water quality and habitat evaluation component to collect baseline and post-construction information. It is anticipated that there will be a Phase 2 project, not funded as part of this grant, to restore the shoreline habitat.
Deliverables include: construction specs and plans, stormwater modeling calculations, evaluation monitoring plan and pre-construction results, and 25-year operation & maintenance plan with pre/post photos.
The specific objectives, metrics, and deliverables for the listed activities are included in the application and supporting materials, and this scope is not intended to replace or supersede those documents.
Grant Details
Lake Protection Grant
Date
3/15/2022
Waters Involved
Middle Lake
Status
Complete
Washburn County: Hlr - Washburn County Shoreline Improvments: Partnering with property owners, Washburn County is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Minnesuing Creek
Status
Complete
Village Of Lake Nebagamon: Lmi-Stormwater Runoff Boat Landing Lake Nebagamon: The Village of Lake Nebagamon is sponsoring a project to implement engineered stormwater best practices at the lake\2019s public boat landing downtown. The Project also includes community outreach and tours to share the project results.
Deliverables include: construction specs and plans, 25-year operation & maintenance plan with pre/post photos, and an outreach summary.
The specific objectives, metrics, and deliverables for the listed activities are included in the application and supporting materials, and this scope is not intended to replace or supersede those documents.
Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Minong Flowage
Status
Complete
Minong Flowage Association: Hlk-Minong Flowage: Fish-Sticks Dan Maxwell: Minong Flowage Association will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan. Practices include: fish sticks 1 lakeshore property.
The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #17. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #17 is required.
The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.
Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Minong Flowage
Status
Complete
Minong Flowage Association: Hlr - Minong Flowage - Fish Sticks 2020-2023: Partnering with property owners, Minong Flowage Association is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
3/15/2022
Waters Involved
Minong Flowage
Status
Complete
Washburn County: Hlr - Washburn County Shoreline Improvments: Partnering with property owners, Washburn County is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Moss Creek
Status
Complete
Town Of Round Lake: Lmi-Town Of Round Lake - Township Land Use Plan Development: The Town of Round Lake in Sawyer County will develop a land use plan and develop shoreland ordinance revision recommendations with the intent of protecting and/or improving water quality in its lakes and rivers systems during a period of extreme developmental pressures.
Activities associated with this project include; conduct of public input meeting(s) and survey(s) to identify on and off lake development issues, development of goals and policies addressing the identified issues, opportunities, and conflicts, inventory and analysis of the Town's water and land resources, development of short and long-range land use and lake protection recommendations, development and review of ordinance revisions, and identification of implementation tools for recommendations.
Project deliverables for this project include copies of all maps, proposed ordinances, plans, etc. developed during the course of the project and a copy of the final land use plan.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project. The project results will be disseminated to the public by newsletter(s), or public meeting(s), and/or local newspaper article(s).
Grant Details
Lake Protection Grant
Date
3/15/2022
Waters Involved
Namekagon River
Status
Complete
Washburn County: Hlr - Washburn County Shoreline Improvments: Partnering with property owners, Washburn County is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Nebagamon Creek
Status
Complete
Village Of Lake Nebagamon: Lmi-Stormwater Runoff Boat Landing Lake Nebagamon: The Village of Lake Nebagamon is sponsoring a project to implement engineered stormwater best practices at the lake\2019s public boat landing downtown. The Project also includes community outreach and tours to share the project results.
Deliverables include: construction specs and plans, 25-year operation & maintenance plan with pre/post photos, and an outreach summary.
The specific objectives, metrics, and deliverables for the listed activities are included in the application and supporting materials, and this scope is not intended to replace or supersede those documents.
Grant Details
Lake Protection Grant
Date
9/1/1999
Waters Involved
Nelson Lake
Status
Complete
Sawyer County: Acq-Nelson Lake, Big Island Land Acquisition: Sawyer County has purchased a parcel of land on "Big Island" in Nelson Lake, Sawyer County. The parcel contains 26 acres and more than 2300 feet of shoreline on Nelson Lake. The Big Island on Nelson Lake is approximately 547 acres, of which 262 acres are presently owned by Sawyer County and are enrolled in Wisconsin's County Forest Program. The entire island falls within the boundaries of the Sawyer County Forest. A letter of waiver of retroactivity has been issued for this project effective for the time period of July 28, 1998 to June 30, 1999.
Sawyer County must comply with the conditions of the "Long Term Land Management Plan" for this property as listed in the project description as attached to the Project Application (Form 8700-240) for this Lake Protection Grant. The deed restriction clause as listed in the Letter of Retroactivity must also be inserted in the deed.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Shell Lake
Status
Complete
Washburn County: Res-Shell Lake Riparian Buffer Restoration Project: Washburn County will implement an assistance project to work with Shell Lake lakeshore owners, as the water level recedes, to return as much waterfront as possible to its natural condition through planted restoration projects and through protection of areas that will regenerate naturally.
Shell Lake has experienced flood conditions the past 3-4 years as a result of unusually high water levels on this 2600 acre "seepage" lake. There is currently no existing natural outlet for this lake. Recently, the City of Shell Lake has installed a "pipeline" outlet and the water levels are beginning to recede to a more "normal" level.
This program will provide for technical assistance to individual shoreline property owners with the potential for shoreline renewal and/or protection of native vegetation. Cost sharing will be provided for site assessment and evaluation, site design for restoration/preservation, and preparation/planting of vegetation. The project goal is to restore native vegetation on a minimum of 90 lots on the lake.
Project deliverables for this project include a final report listing all project accomplishments including the number of parcels or lots participating in the program.
Special Conditions:
All shoreline habitat restoration activities conducted under this grant will be subject to the conditions specified in Wis. Adm. Code NR191.24(3)(a) to Wis. Adm. Code NR191.24(3)(j).
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project. The project results will be disseminated to the public by newsletter(s), or public meeting(s), and/or local newspaper article(s).
Grant Details
Lake Protection Grant
Date
7/1/2008
Waters Involved
Shell Lake
Status
Complete
City Of Shell Lake: Lmi-Shell Lake Water Quality Improvement Project: The City of Shell Lake is sponsoring a three-year Water Quality Improvement Project including the following activities: water quality study with response monitoring & paleolimnological component; runoff best management practice (BMP) installation at the Industrial Park & City Park; lake access restorations.
USGS will coordinate water quality & phosphorous monitoring, analyses, & P budget with nutrient response modeling. DNR Research staff will coordinate paleolimnological sediment core sampling, analyses, & reporting.
BMPs will be designed/constructed with an engineering firm & City. Installed practices require a 10 year operation/maintenance plan & contract. Shoreline restoration parcels require a WDNR approved restrictive covenant permanently establishing the vegetative buffer on the parcel. Restorations will follow standards in NR 191.24(3) unless mutually agreed to in writing with the DNR lake coordinator prior to implementation. The Department must review engineering/design plans before installation & may perform site inspection &/or monitoring.
Deliverables include: final water quality study/nutrient response report including management alternative scenarios; paleolimnological study report; BMP engineering/design plans; copies of operation & maintenance plans & contracts; final shoreline restoration plans/maps for sites where implementation is funded with the grant; pre/post photos of BMPs & restorations; list of parcels committed to restrictive covenants; project accomplishment/challenges summary; educational materials developed.
Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Shell Lake
Status
Complete
Washburn County: Hlr - Washburn County Land & Water, Lakes And Rivers Shore Buffers: Partnering with property owners, Washburn County is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
4/15/2016
Waters Involved
Spider Lake
Status
Complete
Spider Chain Of Lakes Improvement Assn: Hlk-Northern Waters Env. School Healthy Spider Lk Project: Spider Chain of Lakes Association will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan. Practices include: two 350 ft2 native plantings, one fish sticks project, one rain garden, one diversion practice, and one rock infiltration practice on 1 property.
The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #16. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #16 is required.
The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.
Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
11/27/1996
Waters Involved
St Croix Flowage
Status
Complete
Douglas County: Acq-Upper St Croix Flowage Land Acquisition-Bell Trust/Wilcox Is: Douglas County will acquire approximately 128 acres (six parcels) of land located on the Gordon/St. Croix Flowage to protect the headwaters of the St. Croix Scenic Riverway. The properties include primarily wooded acreage located along both the southern shore of the flowage and Wilcox Island along the northern shore. A legal description of the parcels is attached. The property will be managed by the County Forestry Department as either special use areas to preserve and protect the water quality and wildlife habitat of the flowage or as county forest lands. The primary goals of the property's management plan are 1) to preserve and protect the water quality of the flowage and the high quality fishery and wildlife habitat, rich in both aquatic and terrestial bio-diversity 2) to protect the southern shoreline of the flowage from further development, and 3) to protect and maintain as a unique benchmark stand the old growth red and white pine stand on Wilcox Island. The property will be open for public access and use but intensive access or recreational provisions are not planned.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Stone Lake
Status
Complete
Town Of Stone Lake: Acq-Wetland Acquisition, Gala Foods: The Town of Stone Lake is proposing to purchase 17.42 acres of land which includes 12.42 acres of upland and 5 acres of wetland. The long term intent for use of this property includes use of the wetland for capture of stormwater runoff from the Town of Stone Lake and use of the uplands as a green space within the town and to act as a wetland buffer from commercial development in the area.
The property will be managed in accordance with the management plan contained in the project application.
Grant Details
Lake Protection Grant
Date
3/15/2022
Waters Involved
Stone Lake
Status
Complete
Washburn County: Hlr - Washburn County Shoreline Improvments: Partnering with property owners, Washburn County is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Totagatic River
Status
Complete
Minong Flowage Association: Hlk-Minong Flowage: Fish-Sticks Dan Maxwell: Minong Flowage Association will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan. Practices include: fish sticks 1 lakeshore property.
The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #17. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #17 is required.
The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.
Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Totagatic River
Status
Complete
Minong Flowage Association: Hlr - Minong Flowage - Fish Sticks 2020-2023: Partnering with property owners, Minong Flowage Association is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
3/15/2022
Waters Involved
Totagatic River
Status
Complete
Washburn County: Hlr - Washburn County Shoreline Improvments: Partnering with property owners, Washburn County is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
3/15/2022
Waters Involved
Trego Lake
Status
Complete
Washburn County: Hlr - Washburn County Shoreline Improvments: Partnering with property owners, Washburn County is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
7/1/2001
Waters Involved
Unnamed
Status
Complete
Washburn County: Acq-Hallstrom Woods Property Acquisition: Washburn County is proposing to purchase a parcel of land called "Hallstrom Woods". The parcel completely encompasses the frontage and access of a 44.5 acre wild lake and several wetlands in addition to a majority of the upland watershed for the lake. The property is approximately 596 acres in size and is presently owned by the Izaak Walton League. The property will be entered into the County Forest Law program and managed in accordance with guideline established in the Ten-Year Comprehensive Land Use Plan for Washburn County Forests.
Washburn County must comply with the conditions of the "Ten-Year Comprehensive Land Use Plan" for this property as listed in the project description as attached to the Project Application (Form 8700-240) for this Lake Protection Grant. A deed restriction including the following language must be inserted in the deed:
By acceptance of this deed, the sponsor, for itself and its successors and assigns, hereby covenants and agrees not to sell, lease, assign or mortgage the premises herein described without the prior written approval of the Secretary of the Department of Natural Resources, his designee, or any successor and the rights herein conveyed are subject to the interests of the State under the lake management grant program, s. 281.69 & 281.71, Statues., and NR 191 Wis. Admin. Code.
Property Legal Description:
All of section 15, lying west of County Trunk Highway "F" and south of State Trunk Highway 77, excepting the Southeast Quarter of the Southeast Quarter, Lot 1 of Washburn County Certified Survey Map Number 2570, and that parcel described in Volume 74, Page 323 of the Washburn County Register of Deeds Office, all located in Section 15, Township 41 North, Range 13 West, Washburn County, Wisconsin.
Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Unnamed
Status
Complete
West Wisconsin Land Trust: Acq-Stockman Property Deer Lake Ii: The West Wisconsin Land Trust proposes to purchase an easement on approximately 75 acres of the Stockman property on Deer Lake in Sawyer County. The easement protects 4,600 feet of lake frontage and eliminates any option of development on the protected property.
Grant Details
Lake Protection Grant
Date
7/1/2007
Waters Involved
Unnamed
Status
Complete
Bayfield County: Res-Bony Lakewide Restoration & Conservation Project: Bayfield County in partnership with ABDI Land & Water Conservation, Sigurd Olson Environmental Institute, and Bony Lake property owners will implement a lake restoration project. More than 50% of the property owners (resulting in over a mile of linear shoreline) expressed a commitment to shoreline restoration, and additional lake protection activities, such as storm water best management practices (e.g. rain gardens), littoral habitat restoration (e.g. tree drops), and shoreline restorations exceeding minimum county and state standards will be strongly encouraged. Multiple partners will collaborate with the following: technical assistance; restoration cost-share assistance; promotion and education; recognition activities; and enrollment payments. The project also includes collecting pre- and post-restoration monitoring data for baseline and future comparison. These data may include bird, amphibian, terrestrial and aquatic plant community information, and a top/bottom paleoecological sediment core. Project leaders will continually promote media coverage and demonstration opportunities for the surrounding community.
All parcels require a department approved deed restriction that permanently establishes the vegetative buffer on the parcel. Restorations must follow standards set forth in NR 191.24(3).
Project deliverables include: a final report listing all project accomplishments including the number of parcels or lots participating in the program; educational materials developed; media coverage; and monitoring results.
A final report in PDF format summarizing the results of the project as well as copies of databases, maps, GIS files, guidebooks, ordinances or any other products resulting from the project shall be provided to the Department for review prior to final payment.
Grant Details
Lake Protection Grant
Date
7/1/2008
Waters Involved
Unnamed
Status
Complete
City Of Shell Lake: Lmi-Shell Lake Water Quality Improvement Project: The City of Shell Lake is sponsoring a three-year Water Quality Improvement Project including the following activities: water quality study with response monitoring & paleolimnological component; runoff best management practice (BMP) installation at the Industrial Park & City Park; lake access restorations.
USGS will coordinate water quality & phosphorous monitoring, analyses, & P budget with nutrient response modeling. DNR Research staff will coordinate paleolimnological sediment core sampling, analyses, & reporting.
BMPs will be designed/constructed with an engineering firm & City. Installed practices require a 10 year operation/maintenance plan & contract. Shoreline restoration parcels require a WDNR approved restrictive covenant permanently establishing the vegetative buffer on the parcel. Restorations will follow standards in NR 191.24(3) unless mutually agreed to in writing with the DNR lake coordinator prior to implementation. The Department must review engineering/design plans before installation & may perform site inspection &/or monitoring.
Deliverables include: final water quality study/nutrient response report including management alternative scenarios; paleolimnological study report; BMP engineering/design plans; copies of operation & maintenance plans & contracts; final shoreline restoration plans/maps for sites where implementation is funded with the grant; pre/post photos of BMPs & restorations; list of parcels committed to restrictive covenants; project accomplishment/challenges summary; educational materials developed.
Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Unnamed
Status
Complete
Lake Nancy Protective Association, Inc.: Hlk-Nancy Lake Healthy Lakes Project: Lake Nancy Protective Association will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan. Practices include: fish sticks and 350 feet2 native plantings on 3 lakeshore properties.
The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #17. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #16 is required.
The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.
Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share for grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Unnamed
Status
Complete
Village Of Lake Nebagamon: Lmi-Stormwater Runoff Boat Landing Lake Nebagamon: The Village of Lake Nebagamon is sponsoring a project to implement engineered stormwater best practices at the lake\2019s public boat landing downtown. The Project also includes community outreach and tours to share the project results.
Deliverables include: construction specs and plans, 25-year operation & maintenance plan with pre/post photos, and an outreach summary.
The specific objectives, metrics, and deliverables for the listed activities are included in the application and supporting materials, and this scope is not intended to replace or supersede those documents.
Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Unnamed
Status
Complete
Washburn County: Hlr - Washburn County Land & Water, Lakes And Rivers Shore Buffers: Partnering with property owners, Washburn County is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
3/15/2022
Waters Involved
Unnamed
Status
Complete
Washburn County: Hlr - Washburn County Shoreline Improvments: Partnering with property owners, Washburn County is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
9/1/2000
Waters Involved
Whitefish Lake
Status
Complete
Whitefish Lake Conservation Organization, In: Res-Renewal & Retention Of Native Vegetation: The Whitefish Lake Property Owners Association, Inc. will implement a lakewide project to renew and protect vegetation that extends landward and lakeward from the ordinary high water mark of Whitefish Lake. This program will provide for an initial site evaluation/assissment of shoreline properities with the potential for shoreline renewal and /or protection of native vegetation. Cost sharing will be provided for site assessment and evaluation, site design for restoration, and preparation/planting of vegetation. Shallow water areas contiguous with renewal sites will be protected as a "no disturbance zone". The project goal is to renew native vegetation on 45 sites (1/2 of current development) and retain and protect native vegetation on the remaining sites. A$3,000 cost share cap will be implemented per individual renewal site. All properties participating in this program will receive a departmnet approved deed restriction that permanently establishes the vegetative buffer on the parcel. Shoreland restoration projects will be designed and installed in accordance with the NRCS Best Management Practices Definition and Conditions.
Participants in this program will post their property with signs and will allow other lakeshore owners to visit their property for educational purposes. Additional activities will include an information and education program involving Whitefish Lake residents, local and county governments, other lake associations, school children, and conservation groups.
Project deliverables include a final report listing project accomplishments including the number of parcels or lots participating in the program. The Department of Natural Resources will be provided with a paper copy and an electonic copy of all project products. Project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper article(s).
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Whitefish Lake
Status
Complete
Whitefish Lake Conservation Organization, In: Lmi-Whitefish Lake Diagnostic & Feasibility Study: The Whitefish Lake Conservation Organization, in cooperation with the US Geological Survey, Wis. Dept. of Nat. Res., and private consultants, will conduct a comprehensive diagnostic/feasibility study of Silver Lake and it's watershed and develop a lake management plan.
The project includes the following activities; (1) the USGS will conduct an assessment of the lake's hydrology and water quality and model lake responses to management scenarios, (2) the DNR [Integ. Sci. Serv.] will conduct a lake bottom sediment core study to determine historical conditions and changes in lake water quality over time, (3) consultant Susan Cray Borman will conduct an aquatic plant survey and develop management recommendations, and (4) consultant Eric Olson will coordinate and compile the results of these studies into planning reports and action plans as well as provide for project public communication, input (through surveys and working groups) and education.
Project deliverables include: l. Detailed hydrologic and nutrient budgets, including simulations of alternative development scenarios in a published technical report. 2. Detailed aquatic plant survey and report. 3. A lake core paleoecological study and report. 4. Two interim planning reports synthesizing and summarizing the findings of the other studies, and 5. A comprehensive lake management plan for Whitefish Lake.
Specific conditions for this project include: The installation of all stream and lake gauging stations must receive the approval and/or permit from the Department of Natural Resources water regulation section.
The Department of Natural Resources will be provided with electronic and paper copies of the annual and final reports of the results of this study and the lake management plan. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Whitefish Lake
Status
Complete
West Wisconsin Land Trust: Acq-Whitefish Lake - Griggs Shore: West Wisconsin Land Trust will sponsor a project to acquire a conservation easement on 37 acres including approximately 1/2 mile of shoreland on Whitefish Lake and 4,500 feet of shoreline frontage on a large wetland.
Grant Details
Large Scale Lake Planning
Date
3/24/1994
Waters Involved
Amnicon Lake
Status
Complete
Amnicon/Dowling Lake Management District: Amnicon Lake Management Planning: Conduct water quality sampling. Conduct aquatic plant survey of lake. Conduct an aerial photography survey of lake shoreline. Conduct a periphyton survey in lake. Conduct a shoreline conductivity profile survey. The grantee will disseminateinformation to the public by newsletter, local newspaper articles, public meetings and summary report mailings. Project results will be reposited at Trilakes Civic Club, 7872 S. County Rd. A, Superior, WI, 54880.
Grant Details
Large Scale Lake Planning
Date
4/1/1996
Waters Involved
Amnicon Lake
Status
Complete
Amnicon/Dowling Lake Management District: Amnicon Lake Water Quality Monitoring And Assessment: The Amnicon/Dowling Lake Management and Sanitary District proposes to continue the water quality monitoring on Amnicon lake and continue their lake management planning process. Project activities include 1) monitoring lake water quality from April to November, 2) monitoring and evaluating four "Hot Spot" sites for potential harmful runoff during precipitation events, 3) monitoring eight existing shoreline wells to characterize groundwater quality and potential lake impacts, 4) install eight seepage meters around the lake and monitor quality of groundwater entering the lake, 5) evaluate previously identified areas of concern and make recommendations for the implementation of "Best Management Practices" where indicated, and 6) analyze and characterize the lake sediments. A final report will be prepared describing the project results. A paper copy and an electronic copy of the final report will be provided to the Department of Natural Resources. Information on the project will be disseminated to the public by newsletter, public meeting, and summary report mailing.
Grant Details
Large Scale Lake Planning
Date
4/1/1997
Waters Involved
Amnicon Lake
Status
Complete
Amnicon/Dowling Lake Management District: Amnicon Lake Water Quality Monitoring: The Amnicon/Dowling Lake Management & Sanitation District proposes to conduct water quality monitoring on Amnicon Lake, including the purchase of water quality monitoring equipment. Project activities also include providing water quality sampling training to volunteers, providing a groundtruthing review session to volunteers, analyzing groundtruthing results, and preparing a final report. The Department of Natural Resource will be provided with a paper copy and an electronic copy of the final report. Information about the project will be disseminated to the public by newsletter, public meeting, summary report mailings, and local newspaper article.
Grant Details
Large Scale Lake Planning
Date
4/1/2003
Waters Involved
Amnicon Lake
Status
Complete
Amnicon/Dowling Lake Management District: Amnicon Lake Comprehensive Lake Management Plan Development: The Amnicon/Dowling Lake Management & Sanitary District will conduct a comprehensive lake management planning project involving a study and evaluation of Amnicon Lake in Douglas County. Project activities include; conducting a review and research of all available reports, records, maps, etc., conducting a shoreline inventory, conducting a watershed assessment, conducting a surface runoff assessment, conducting lake and stream water quality monitoring, conducting lake bottom sediment monitoring, calculating a lake water budget, preparing a lake nutrient budget, conducting computer modeling of lake water quality data and information, and preparing a final comprehensive lake Management Plan/Report.
Specific deliverables for this grant project include:
? A comprehensive lake management plan for Amnicon Lake including the project activity results.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Cable Lake
Status
Complete
Town Of Cable: Town Of Cable: The Town of Cable proposes to conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Cable in Bayfield County. Project activities would include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
? Copies of meetings notes, I & E materials, survey results, and newspaper notices.
? A Final Report in booklet form, incorporating the land use plan and process along with associated colored resource maps and a land and water use development guide.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Dawn Lake
Status
Complete
Town Of Cable: Town Of Cable: The Town of Cable proposes to conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Cable in Bayfield County. Project activities would include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
? Copies of meetings notes, I & E materials, survey results, and newspaper notices.
? A Final Report in booklet form, incorporating the land use plan and process along with associated colored resource maps and a land and water use development guide.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Fuller Lake
Status
Complete
Town Of Cable: Town Of Cable: The Town of Cable proposes to conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Cable in Bayfield County. Project activities would include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
? Copies of meetings notes, I & E materials, survey results, and newspaper notices.
? A Final Report in booklet form, incorporating the land use plan and process along with associated colored resource maps and a land and water use development guide.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Henry Lake
Status
Complete
Town Of Cable: Town Of Cable: The Town of Cable proposes to conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Cable in Bayfield County. Project activities would include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
? Copies of meetings notes, I & E materials, survey results, and newspaper notices.
? A Final Report in booklet form, incorporating the land use plan and process along with associated colored resource maps and a land and water use development guide.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Jo Ann Lake
Status
Complete
Town Of Cable: Town Of Cable: The Town of Cable proposes to conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Cable in Bayfield County. Project activities would include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
? Copies of meetings notes, I & E materials, survey results, and newspaper notices.
? A Final Report in booklet form, incorporating the land use plan and process along with associated colored resource maps and a land and water use development guide.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Lake Owen
Status
Complete
Town Of Cable: Town Of Cable: The Town of Cable proposes to conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Cable in Bayfield County. Project activities would include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
? Copies of meetings notes, I & E materials, survey results, and newspaper notices.
? A Final Report in booklet form, incorporating the land use plan and process along with associated colored resource maps and a land and water use development guide.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Lake Tahkodah
Status
Complete
Town Of Cable: Town Of Cable: The Town of Cable proposes to conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Cable in Bayfield County. Project activities would include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
? Copies of meetings notes, I & E materials, survey results, and newspaper notices.
? A Final Report in booklet form, incorporating the land use plan and process along with associated colored resource maps and a land and water use development guide.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Lerche Lake
Status
Complete
Town Of Cable: Town Of Cable: The Town of Cable proposes to conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Cable in Bayfield County. Project activities would include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
? Copies of meetings notes, I & E materials, survey results, and newspaper notices.
? A Final Report in booklet form, incorporating the land use plan and process along with associated colored resource maps and a land and water use development guide.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Little Rosa Lake
Status
Complete
Town Of Cable: Town Of Cable: The Town of Cable proposes to conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Cable in Bayfield County. Project activities would include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
? Copies of meetings notes, I & E materials, survey results, and newspaper notices.
? A Final Report in booklet form, incorporating the land use plan and process along with associated colored resource maps and a land and water use development guide.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles
Grant Details
Large Scale Lake Planning
Date
4/1/2004
Waters Involved
Middle Eau Claire Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes Management Plan - Middle Eau Claire Lake: In combination with two other planning grant applications for Upper and Lower Lake Eau Claire, the Town of Barnes proposes to develop a management plan for the lake system that integrates with the town comprehensive land use plan. The scope includes an investigation of shoreland buffer areas and recommend best management practices, review of town and county ordinances with recommendations for revisions, delineation and digital mapping of the lake watershed, watershed modeling, compilation of existing water quality and environmental information about the lakes, conducting and analyzing a social survey.
The deliverable will be a Lake Plan and Land Use document that identifies and lake and watershed management strategies, prioritizes needs and goals to reduce nonpoint source pollutant loading.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Namekagon Lake
Status
Complete
Town Of Cable: Town Of Cable: The Town of Cable proposes to conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Cable in Bayfield County. Project activities would include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
? Copies of meetings notes, I & E materials, survey results, and newspaper notices.
? A Final Report in booklet form, incorporating the land use plan and process along with associated colored resource maps and a land and water use development guide.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Nelson Lake
Status
Complete
Nelson Lake Association: Nelson Lake Comprehensive Mgt. Plan, Phase 1: The Nelson Lake Association will conduct a two phase study project to collect information and prepare a lake management plan for Nelson Lake. Specific activities covered in the Phase 1 portion of this project include; conduct of several planning and I&E meetings, delineation and analysis of the lake's watershed and modeling of various development and loading scenarios, lake and inlet water quality monitoring, data analysis and report/plan development and travel time and costs.
Specific deliverables for this two-phase study project include: A final project report and comprehensive lake management plan, including all project activity results and lake management alternatives and recommendations.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Nelson Lake
Status
Complete
Nelson Lake Association: Nelson Lake Comprehensive Mgt. Plan, Phase 2: The Nelson Lake Association will conduct a two phase study project to collect information and prepare a lake management plan for Nelson Lake. Specific activities covered in the Phase 2 portion of this project include; conduct of a curly-leaf pondweed survey, conduct of a comprehensive aquatic plant survey, and survey equipment and printing and mailing costs.
Specific deliverables for this two-phase study project include: A final project report and comprehensive lake management plan, including all project activity results and lake management alternatives and recommendations.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Ole Lake
Status
Complete
Town Of Cable: Town Of Cable: The Town of Cable proposes to conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Cable in Bayfield County. Project activities would include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
? Copies of meetings notes, I & E materials, survey results, and newspaper notices.
? A Final Report in booklet form, incorporating the land use plan and process along with associated colored resource maps and a land and water use development guide.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Perry Lake
Status
Complete
Town Of Cable: Town Of Cable: The Town of Cable proposes to conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Cable in Bayfield County. Project activities would include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
? Copies of meetings notes, I & E materials, survey results, and newspaper notices.
? A Final Report in booklet form, incorporating the land use plan and process along with associated colored resource maps and a land and water use development guide.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Porter Lakes
Status
Complete
Town Of Cable: Town Of Cable: The Town of Cable proposes to conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Cable in Bayfield County. Project activities would include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
? Copies of meetings notes, I & E materials, survey results, and newspaper notices.
? A Final Report in booklet form, incorporating the land use plan and process along with associated colored resource maps and a land and water use development guide.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Price Lake
Status
Complete
Town Of Cable: Town Of Cable: The Town of Cable proposes to conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Cable in Bayfield County. Project activities would include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
? Copies of meetings notes, I & E materials, survey results, and newspaper notices.
? A Final Report in booklet form, incorporating the land use plan and process along with associated colored resource maps and a land and water use development guide.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Rosa Lake
Status
Complete
Town Of Cable: Town Of Cable: The Town of Cable proposes to conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Cable in Bayfield County. Project activities would include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
? Copies of meetings notes, I & E materials, survey results, and newspaper notices.
? A Final Report in booklet form, incorporating the land use plan and process along with associated colored resource maps and a land and water use development guide.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
South Porter Lake
Status
Complete
Town Of Cable: Town Of Cable: The Town of Cable proposes to conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Cable in Bayfield County. Project activities would include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
? Copies of meetings notes, I & E materials, survey results, and newspaper notices.
? A Final Report in booklet form, incorporating the land use plan and process along with associated colored resource maps and a land and water use development guide.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Totagatic Lake
Status
Complete
Town Of Cable: Town Of Cable: The Town of Cable proposes to conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Cable in Bayfield County. Project activities would include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
? Copies of meetings notes, I & E materials, survey results, and newspaper notices.
? A Final Report in booklet form, incorporating the land use plan and process along with associated colored resource maps and a land and water use development guide.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Trail Lake
Status
Complete
Town Of Cable: Town Of Cable: The Town of Cable proposes to conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Cable in Bayfield County. Project activities would include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
? Copies of meetings notes, I & E materials, survey results, and newspaper notices.
? A Final Report in booklet form, incorporating the land use plan and process along with associated colored resource maps and a land and water use development guide.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Un Spring
Status
Complete
Town Of Cable: Town Of Cable: The Town of Cable proposes to conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Cable in Bayfield County. Project activities would include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
? Copies of meetings notes, I & E materials, survey results, and newspaper notices.
? A Final Report in booklet form, incorporating the land use plan and process along with associated colored resource maps and a land and water use development guide.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Unnamed
Status
Complete
Town Of Cable: Town Of Cable: The Town of Cable proposes to conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Cable in Bayfield County. Project activities would include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
? Copies of meetings notes, I & E materials, survey results, and newspaper notices.
? A Final Report in booklet form, incorporating the land use plan and process along with associated colored resource maps and a land and water use development guide.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Unnamed T43n R07w S16-16
Status
Complete
Town Of Cable: Town Of Cable: The Town of Cable proposes to conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Cable in Bayfield County. Project activities would include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
? Copies of meetings notes, I & E materials, survey results, and newspaper notices.
? A Final Report in booklet form, incorporating the land use plan and process along with associated colored resource maps and a land and water use development guide.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles
Grant Details
Large Scale Lake Planning
Date
4/1/2004
Waters Involved
Upper Eau Claire Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes Management Plan - Upper Eau Claire: In combination with two other planning grant applications for Middle and Lower Lake Eau Claire, the Town of Barnes proposes to develop a management plan for the lake system that integrates with the town comprehensive land use plan. The scope includes an investigation of shoreland buffer areas and recommend best management practices, review of town and county ordinances with recommendations for revisions, delineation and digital mapping of the lake watershed, watershed modeling, compilation of existing water quality and environmental information about the lakes, conducting and analyzing a social survey.
The deliverable will be a Lake Plan and Land Use document that identifies and lake and watershed management strategies, prioritizes needs and goals to reduce nonpoint source pollutant loading.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
West Lake
Status
Complete
Town Of Cable: Town Of Cable: The Town of Cable proposes to conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Cable in Bayfield County. Project activities would include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
? Copies of meetings notes, I & E materials, survey results, and newspaper notices.
? A Final Report in booklet form, incorporating the land use plan and process along with associated colored resource maps and a land and water use development guide.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles
Grant Details
Large Scale Lake Planning
Date
10/1/1997
Waters Involved
Whitefish Lake
Status
Complete
Town Of Wascott: Whitefish Lake Water Quality Monitoring: Wascott Township proposes to do a water quality study on Whitefish Lake. Project activities include in-lake monitoring at two sites, five times a year, annual data summaries and progress reports and final evaluation. The Department of Natural Resources will be provided with both a paper copy an an electronic copy of the final report. The project results will be disseminated to the public by annual summaries, newsletter(s) and final full report mailing(s).
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Wiley Lake
Status
Complete
Town Of Cable: Town Of Cable: The Town of Cable proposes to conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Cable in Bayfield County. Project activities would include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
? Copies of meetings notes, I & E materials, survey results, and newspaper notices.
? A Final Report in booklet form, incorporating the land use plan and process along with associated colored resource maps and a land and water use development guide.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Adventure Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Adventure Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Banks Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Banks Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Beartrack Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Beartrack Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Bergen Creek
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Bergen Creek
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Big Bass Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Big Bass Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Bond Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Bond Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Bughouse Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Bughouse Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Fivemile Creek
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Fivemile Creek
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Gilmore Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Gilmore Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Horseshoe Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Horseshoe Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Lake Nancy
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Lake Nancy
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Little Bass Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Little Bass Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Little Sand Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Little Sand Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Lower Kimball Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Lower Kimball Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Middle Kimball Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Middle Kimball Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Middle Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Middle Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Miles Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Miles Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2003
Waters Involved
Minong Flowage
Status
Complete
Washburn County: Minong Flowage Vegetation & Sediment Assessment Project: The Washburn County Land and Water Conservation Department, in cooperation with the Minong Flowage Association, will conduct a Eurasian Milfoil and Native Vegetation Survey and a Sediment Assessment project on the Minong Flowage in Washburn and Douglas Counties. The presence of the exotic aquatic plant species "Eurasian Watermilfoil," was confirmed in the Minong Flowage in the fall of 2002.
Activities involved with this project include; an aquatic plant distribution study conducted during the summer of 2003, a sediment collection and analysis study, an on-going information and education program, and a project report including a plant management plan.
Specific deliverables for this project include;
1. Final technical report that addresses the findings of the lake sediment survey and a management plan.
2. Non-technical summary in a newsletter form that can be widely produced and distributed to lake users.
3. Present aquatic plant distribution data including native plant species and Eurasian Watermilfoil.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Minong Flowage
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Minong Flowage
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Mosquito Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Mosquito Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Mud Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Mud Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
No Mans Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
No Mans Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
North Twin Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
North Twin Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Pokegama Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Pokegama Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Rice Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Rice Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Round Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Round Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Sand Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Sand Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Scovils Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Scovils Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Shell Creek
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Shell Creek
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Sherman Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Sherman Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Sleepy Eye Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Sleepy Eye Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Spring Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Spring Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Totagatic River
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Totagatic River
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Tucker Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Tucker Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Un Spring
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Un Spring
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Unnamed
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Unnamed
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Upper Kimball Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Upper Kimball Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Warner Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair: The Town of Minong is sponsoring a project to hold a one-day lake fair in July 2009. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake-related educational opportunities. This grant will assist with programing, advertising, and financing the event.
Specific deliverables for this project include a summary report that includes attendance, evaluation/feedback, and recommendations for similar, future events, and any publication or advertising tools developed for the project.
This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Warner Lake
Status
Complete
Town Of Minong: Town Of Minong Lake Fair-2011: The Town of Minong is sponsoring a project to hold a one day lake fair in July 2011. The Minong Town Lake Committee will organize the fair, which will include presentations, booths, and hands-on lake related educational opportunities. This grant will assist with programming, advertising, and financing the event.
Specific deliverables for this project include a summary report including attendance, evaluation/feedback, and recommendations for similar, future events, and any publications or advertising tools developed for the project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.
Grant Details
River Protection Grant
Date
7/1/2009
Waters Involved
Totagatic River
Status
Complete
Washburn County: Totogatic River, Dandrea Acquisition Project: Washburn County is purchasing a 20 acre parcel in the Town of Minong which includes one-half mile of the Totogatic River, a designated state wild river.